ML20084F437

From kanterella
Jump to navigation Jump to search
AO 250-75-7:on 750924,high Pressure Comparator in Pressurizer Protection Sys Channel III Malfunctioned.Caused by Two Failed Capacitors in Dc Power Supply.Comparator PC-3-457A Replaced
ML20084F437
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/03/1975
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AO-250-75-7, NUDOCS 8304210131
Download: ML20084F437 (2)


Text

C)

O 7:=c.ar,____.vf">g

  • ~ '

al x n 9,BAyD u

u s _.

FLontDA POWER & LIGHT CU.*.*PAMf.

October 3, 1975 1

" d)hx.

Mi. Norman C. Moseley, Director, Region II

?

N A

. Office of Inspection and Enforcement.

1 ~.\\

s.

i

'A

,U.S. Nuclear Regulatory Commission

.230 Peachtree Street, N.W., Suite 818

.' d 1

L.

Atlanta, Georgia 30303 M~

T i.

,o De'ar Mr. Moseley:

ABNOINAL OCCURRENCE 250-75-7

~

.IURKEY POINT UNIT 3

.' DATE OF OCCURRENCE:'SEPTDIBER 24, 1975

~

l i

1%LFUNCTION OF HIGH PRESSURE' CGIPARATOR IN L

  • PRESSURIZER PRESSURE PROTECTION SYST91 CHANNEL III A..

CONDITIONS PRIOR TO OCCURRENCE

'Ihe reactor was in steady state power operation at 99% rated power.

Pressurizer Pressure Protection System Channel III was in the tripped mode and a functional test of that channel was being perfomed per Operating Procedure 14004.4 entitled " PRESSURIZER PRESSURE AND WATER

. LEVEL PROTECTION CHANNELS Periodic Test."

B.

DESCRI1/rION'0F OCCURRENCE l

The periodic test was initiated at about 2:40 A\\1 on September 24,'1975.

At about 3:30 N1, the test signal input did not trip the Channel III high pressurizer pressure comparator PC-3-457A at the required setpoint.

f

.C. DESIGNATION OF APPARENT CAUSE OF OCCURRENCE

. Tests of the comparator revealed two failed capacitors in the d.c. power supply._: Failure.of these capacitors permitted an a.c. signal to be superimposed on the d.c. signal.in the comparator.

This caused the ccT.parator trip.setpoint_.to bc.raisecl...above the required value.

e D.

ANALYSIS OF OCCURRENCC a.

There are three channels of high pressurizer pressure protection.

~

Pressurizer Pressure Protection System logic requires that two of the three channels be in the trip mode in order to produce a reactor trip signal.

During this periodic test, Channels I and II were verified operabic. Had an actual high pressurizer pressure occurred, a reactor trip signal would have been generated at the proper setpoint, there-fore, the health and safety of the public were not.affected by this i

occurrence.

1 8304210131 751003 l

PDR ADOCK 05000250 S

PDR l

l

- w w,"

, m - d a r/ m -

%y g

O s

i hir. Norman C. bloseley

)

October 3, 1975 Page Two E.

CORRECTIVE ACTION Comparator PC-3-457A was replaced with a' spare comparator. The PRESSURIZER PRESSURE A\\.I) NATER LEVEL PROTECTION CHANNELS Periodic Test was then satisfactorily completed at about 4:25 Ah! on September 24,.

1975.

Correspondence with the vendor has been initiated to further evaluate the malfunction.

F.

FAILURE DATA The faulty PC-3-457A comparator was >!odel No. 4111082-001, S/N A0 564, manufactured by the Hagan/ Computer Systems Division of Westinghouse.

htalfunction of this Stodel No. comparator occurred on one other occasion.

It was described in Abnormal Occurrence Report 251-75-3.

A. D.

INfkt Vice President Power Resources h!AS/ jar cc: Jack R. Newman, Esquire ice of >!anagement Infomation and Pro Director, gice of Inspection and Enforcement (40 am Control (3)