Text
C)
O 7:=c.ar,____.vf">g
- ~ '
al x n 9,BAyD u
u s _.
FLontDA POWER & LIGHT CU.*.*PAMf.
October 3, 1975 1
" d)hx.
Mi. Norman C. Moseley, Director, Region II
?
N A
. Office of Inspection and Enforcement.
1 ~.\\
s.
i
'A
,U.S. Nuclear Regulatory Commission
.230 Peachtree Street, N.W., Suite 818
.' d 1
L.
Atlanta, Georgia 30303 M~
T i.
,o De'ar Mr. Moseley:
ABNOINAL OCCURRENCE 250-75-7
~
.IURKEY POINT UNIT 3
.' DATE OF OCCURRENCE:'SEPTDIBER 24, 1975
~
l i
1%LFUNCTION OF HIGH PRESSURE' CGIPARATOR IN L
- PRESSURIZER PRESSURE PROTECTION SYST91 CHANNEL III A..
CONDITIONS PRIOR TO OCCURRENCE
'Ihe reactor was in steady state power operation at 99% rated power.
Pressurizer Pressure Protection System Channel III was in the tripped mode and a functional test of that channel was being perfomed per Operating Procedure 14004.4 entitled " PRESSURIZER PRESSURE AND WATER
. LEVEL PROTECTION CHANNELS Periodic Test."
B.
DESCRI1/rION'0F OCCURRENCE l
The periodic test was initiated at about 2:40 A\\1 on September 24,'1975.
At about 3:30 N1, the test signal input did not trip the Channel III high pressurizer pressure comparator PC-3-457A at the required setpoint.
f
.C. DESIGNATION OF APPARENT CAUSE OF OCCURRENCE
. Tests of the comparator revealed two failed capacitors in the d.c. power supply._: Failure.of these capacitors permitted an a.c. signal to be superimposed on the d.c. signal.in the comparator.
This caused the ccT.parator trip.setpoint_.to bc.raisecl...above the required value.
e D.
ANALYSIS OF OCCURRENCC a.
There are three channels of high pressurizer pressure protection.
~
Pressurizer Pressure Protection System logic requires that two of the three channels be in the trip mode in order to produce a reactor trip signal.
During this periodic test, Channels I and II were verified operabic. Had an actual high pressurizer pressure occurred, a reactor trip signal would have been generated at the proper setpoint, there-fore, the health and safety of the public were not.affected by this i
occurrence.
1 8304210131 751003 l
PDR ADOCK 05000250 S
PDR l
l
- w w,"
, m - d a r/ m -
%y g
O s
i hir. Norman C. bloseley
)
October 3, 1975 Page Two E.
CORRECTIVE ACTION Comparator PC-3-457A was replaced with a' spare comparator. The PRESSURIZER PRESSURE A\\.I) NATER LEVEL PROTECTION CHANNELS Periodic Test was then satisfactorily completed at about 4:25 Ah! on September 24,.
1975.
Correspondence with the vendor has been initiated to further evaluate the malfunction.
F.
FAILURE DATA The faulty PC-3-457A comparator was >!odel No. 4111082-001, S/N A0 564, manufactured by the Hagan/ Computer Systems Division of Westinghouse.
htalfunction of this Stodel No. comparator occurred on one other occasion.
It was described in Abnormal Occurrence Report 251-75-3.
A. D.
INfkt Vice President Power Resources h!AS/ jar cc: Jack R. Newman, Esquire ice of >!anagement Infomation and Pro Director, gice of Inspection and Enforcement (40 am Control (3)