Provides Info Re Steam Header Installation Compared to Turkey Point Unit 3.Steam Flows from Each Steam Generator Through 30-inch Steam Line Installation.Each Line Has PORV & Four code-approved Safety Valves
ML20084F039
Person / Time
Site: Ginna, 05000000
Issue date: 12/17/1971
From: Amish K
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084F038 List:
References
NUDOCS 8304190306
Download: ML20084F039 (1)


Text

,, - -

o O

g

(:

s

f. ___.

Di~iT m GAS AtiD E!.LCTii : CORIORAT!C:; a i9 EAST AVENU2, i 0Ch=> s c.'t, i:.i.1:5'.':

n.

.Ei% s )

-(

'{

4&

L-December 17, 1971 Mr. Jame s P. O'Reilly, Director United States Atomic Energy Commission Division of Compliance Region I 970 Broad Street Newark, New Jersey 0?t02

Dear M r. O'Reilly:

In your telefax and letter, both dated December 10, you requested that within ten days we provide the Region I Office of the Division of Compliance with information regarding the Ginna steam header installation as compared to the installation at lyrkey Point Unit No. 3 a ycey y.-...

The Ginna installation is different than the Turkey Point.

'.jQ At Ginna, steam flows from each steam generator through a 30 nch R$r" steam line installation. Each line has a pcvier operated relief valve g-gr and four code approved safety valves mounted directly on it.

These gg{.[1

.Pdif valves are all located on the apex of a horizontal section of each line.

Downstream of the power operated and safety valves, each. steam line is equipped with an isolation valve and a non-return check valve.

!,g.g This information is consistent with that presented in the Ginna facility description and Safety Analysis Report, Chapter 10, W.qgy entitled " Steam and Power Conversion System. "