Responds to NRC Re Violations Noted in IE Insp Rept 50-244/83-24.Corrective actions:QA-07 Form Associated W/Purchase Order for Nuclear Consulting Svs Modified to Define Responsibility for Review of Test Data
ML20084E827
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/08/1984
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084E809 List:
References
NUDOCS 8405030017
Download: ML20084E827 (2)


Text

,,

. e

% -' . g3 CY $ 5[ s -

f*/ 3 gg ' ,s.. ;>

RiRObM1 .:

J - . -?'M n ,

ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001  ;

ROGEH W. KOBER VICE SME5# DENT 11 L E P MON E EL.ECTmc & STEM BWOUX DON Am LODE h6 546-2700 March 8, 1984 Dr. Thomas E. Murley, Regicnal Administrator U.S. Nuclear Regulatory Commission Office of Inspection and Enforecment Region I 631~ Park Avenue King of Prussia, PA 19406

Subject:

I&E Inspection Report 63-24 Notice of Violation - Failure to Determine the Iodine Ecmovag Efficiency of the Post Accident Charcoal System at 286 F as Fequired by Technical Specifications.

Dear Dr. Murley:

i The Notice of Violation contained in Inspection Report 83-24 states the following:

" Contrary to the above, (Technical Specification 4.5.2.3.1.c) the surveillance test performed on December 4, 1983 to determine the iodine removal cfficiency'of the' post accident charcoal system was measured under test conditions of 266 F

.rather than 286 F as required. Further, the' test report documenting the incorrect test temperature was reviewed and accepted'by supervisory personnel from two responsible departments."

'In'accordance with:our purchase order (PO Number N-EG-26852) the - contractior , NucleartConsulting Serviceg,-Inc.-(NUCON) was

- -requested to perform this analysis.at'286,F. NUCON - per forras

' similar; analyse's for several other nuclear power plants and confused.our test' requirements:with the standard. requirements

-forfmost'other-facilitics. Thesc' standard requirements can '

be found in- NUREG-0452 Revision 4, " Standard 'Iechnical Specifications -

for Westinghouse Pressurized Water Reactors", Regulatory Guide-

1. 5 2_ Revision .2, - Ma rch 19 7 8, "De sig n , Testing , and Maintenance

' Criteria for~ Post ~ Accident Engineered-Safety-Feature Atmospherc

, ' Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear' Power Plants", ANSI N509-1976, " Nuclear Power Plant Air Cleaning Units and Components" and RDT M16-lT, " Gas Phase ' Adsorbents Efor- Trapping-' Radioactive IodineJand lodine

Compounds." These standard requirements specify a . test temperature

-as'.beingLequal.to saturation temgerature' corresponding ~to'a pressure of-3.7natmospheres.(266 F). It should be noted that ,

these. requirements are more restrictive'than those found-in.

.the.Ginna Final- Facility -Lescription and. Safety Analysis Report y  :(286 F) . and L actually' resulted in; a more1 conservative: determination -

~

of raethyl : iodide : removal.

8405030017 840418

~

PDR ADOCK 05000244~

xG PDR1  ;

. RCCHESTER GAS AND ELECTRtc CORP. SHEET NO, 2 DATE March'8, 1984 70 Dr. Thomas.E. Murley, Regional Administrator Supervisory personncl responsible f or detcrn.ining v.hether ccmpleted surveillance procedures satisfy Technical Specification requirements.have been reniinded of the importance of periornting a thorough review. Additionally, the CA-07 form associated with the purchase order.for LUCCN's services has been modified to further define who is responsible for the review of test data. Eull conpliance has already been achieved.

e y truly yours, N N.

bgerW. Kober ~

RUK/lms Subscribed and sworn to n:e on this 8th da of March, 1984.

JJf '$ && L/

RICHARD F. l.AITENBERGER Notary Public State of New York Monroe County, N.Y.

Commission Expires March 30.19 Ss Reg No.2235125 w-

-.d

'