_ ___ _ -_ _______ _-____ _ _ _ _ _ ___ _ _ _ _ -__

Director, Office of Resource Management March Monthly Operating Report Page 2 i

April 10, 1984 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. 50/395 I

UNIT V. C. SUMMER I l DATE 04/10/83 COMPLETED BY G. A. Loignon l

' TELEPHONE (803) 345-5209 MONTH MARCH 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL o (MWe-Ne t) (MWe-Ne t )

1. 891 17. 894
2. 893 18. 890 [
3. 892 19. 889
4. 892 20. 888 [
5. 867 21. 888
6. 865 22. 888
7. 892 23. 59 l
8. 893 24. 0
9. 890 25. 0
10. 893 26. O r
11. 893 27. 0
12. 892 28. 0
13. 891 29. 0 l 14. 891 30. 0
15. 892 31. 0 l
16. 895 I

pwamik s,,h\

N

=

Director, Office of Resource Management Ma'rch Monthly Operating Report Page 3 April 10, 1984 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SU MER I DATE 04/10/84 CDMPLETED BY G. A. Icignon TEIEPHONE (803) 345-5209 OPERATING STA'IUS

1. Reporting Period: MARCH 1984 Gross Hours in Reporting Period: 744
2. Currently Authorized Ibwer Ievel (MWt): 2775 Max. Depend. Capacity (We-Net): 885 Design Electrical Rating (MWe-Net): 900
3. Power Ievel to which restricted (If Any/(Me-Net): N/A
4. Reasons for Restrictions (If Any): N/A

'ntIS MONni YR 'IO DATE CLMJIATIVE

5. Nunber of Ilours Reactor Was Critical 533.5 1,910.3 9,648.3
6. Reactor Reserve Shutdown Hours 0 0 0
7. Hours Generator on Line 531.5 1,876.3 8,875.2
8. Unit Reserve Shutdom Hours 0 0 0
9. Gross 'Ihermal Ehergy Generated (Wil) 1,459,743 5,122,987 19,744,303
10. Gross Electrical Energy Generated (M41) 490,650 1,713,195 6,482,644
11. Net Electrical Ehergy Generated (WH) 470,812 1,644,612 6,163,100
12. Reactor Service Factor 71.7 87.5 87.5
13. Reactor Availability Factor 71.7 87.5 87.5
14. Unit Service Factor ~

71.4 85.9 85.9

15. Unit Availability Factor 71.4 85.9 85.9
16. Unit Capacity Factor (Using E) 71.5 85d 65.1
17. Unit Cspacity Factor (Using Design MWe) 70.3 83.7 83.7
18. Unit Farced Outage Rate 0.0 4.9 4.9
19. Shutdoms Scheduled Over Next 6 Mmths (Type, Date, and Daration of Each):

Scheduled refueling - Septenber 1,1984

20. If Shut Down at Ehd of Report Period, Estimated Date of Startup: April 18, 1984
21. Units in Test Status (Prior to Connerical Operation):

PORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Oammercial Operation 01-01-84 01-01-84

~

e

)

1

. l

l Director, Office of Resource Mana9snent March Monthly Operating Report Page 4 April 10, 1984 ATr1CHMENr III UNIT SHUIDO9NS AND POWER REDUCTIONS DOCKET NO. 50/395 UNIT V. C. SU MER I DATE 04/10/83 00MPIETED BY G. A. Ioignon TELEPHONE (803) 345-5209 (1) ME'HIOD OF (2)

'IYPE SHUITING D09N F: FORCED DURATIOb THE REAC'IOR OF CORRDCTIVE ACTIONS /

E DATE S ScifHXHJI (fK)URS) REASOb REDUCING POhD COMENTS 4 840323 S 212.5 B 1 4) Spring Maintenance Outage.

1 l

l

r- 3 l .

l .

Director, Office of Resource Management March Monthly Operating Report l Page 5 l

April 10, 1984 l ATTACHMENT IV l NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE l

l The Virgil C. Summer Nuclear Station, Unit No.1, continued full power operation up to March 23, 1984.

On March 23, 1984, at 0331 hours0.00383 days <br />0.0919 hours <br />5.472884e-4 weeks <br />1.259455e-4 months <br />, the generator breaker was opened to begin a spring maintenance outage. The reactor entered Mode 3 at 0531 hours0.00615 days <br />0.148 hours <br />8.779762e-4 weeks <br />2.020455e-4 months <br /> on March 23, 1984.

On March 31, 1984, the plant was shut down for maintenance. The expected startup date is April 18, 1984, i

1 l

1

  • COUTH CAZCLINA CLE3TZlC O CA3 CCMPANY oc ss o...se vs.

co6vuoia, soutw camouna asaie O. W. Dixon. Jn.

vice P.esios=t soci...o.s.. .. April 10, 1984 Director, Office of Resourco Management U.S. Nuclear Regulatory Commission MNBB 7602 .

Washington, DC 20555 ATTN: Mr. Learned W. Barry

SUBJECT:

Virgil C. Summor Nuclear Station Docket No. 50/395 Operating License No. NPF-12 March Monthly Operating Report

Dear Mr. Darry:

Pleano find onclosed the March 1984 Monthly Operating Roport for the Virgil C. Summer Nuclear Station, Unit No. 1, as required by Technical Specification 6.9.1.10.

If there are any quantions, pleano call un at your convenienco.

Vory tr y youra j vf O. W. ixo r.

    • CF GAL OWD/dWf actachmont -

cc V. C. Summor C. A. Prico T. C. Nichols , J r. /O. W. Dixon, J r. C. L. Ligon (NSRC)

F. . 11. Crews , Jr. K. E. Nodland E. C. Roberto R. A. Stough W. A. Williarras , Jr. O. Porcival D. A. Nauman C. W. Ilohl J. P. O'Rollly J. D. Knottn, Jr.

Group Managern INPO Recorda Contor D. A. Nauman NPCF O. S. Drndham Filo 9 c;' W .l

(,ygg'd,

  1. , ,3 Y -