AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-250
)
UNIT Turkey Point #3 i
i DATE 4-16-84 COMPLETED BY N. W. Grant TELEPHONE (305)S52-3675 MONTH Harch 1984 DAY AVERAGE ILY PO ER LEVEL DAY AVER AGE DAILY POhER LEVEL
-(MWe-Net )
688 1
17 2
18 685 3
511 683 19 4
688 683 20 684 687 5
23 621 22 689 6
7 23 683 681 8
24 688 9
25 686 684 39 26 681 II 687 681 27 684 1,
28 680 13 683 686' 29 I4 681 30 689 15 686 692 33 16 686 INSTRUCTIONS
"" '[il he average daily unit power lesel in MWe.Nei for each day in the reporting month. Compute to ls he neare t h
i 8405020286 840331 (9/771 PDR ADOCK 05000250 R
PDR i
I OPER ATI 4G DATA REPORT DOCKET NO. 50-250 DATE 4.-16-84 COMPLETED IlY TLW. Grant TELEPHONE (305)552-3675 OPERATING STATUS Turkey Point Unit #3 Notes
- 1. Unit Name:
Flarch 1984 Unit 3 operated at full
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2,200 power except as indicated 760 in the,IJni.t shutdowns and
- 4. Nameplate Rating (Gross MWe):
693 power reductions" report.
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Ihrough 7) Since last Report, Give Reasons:
- 9. Power Lesel To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr to-Date Cumulatise
- 11. Hours In Reporting Period 744 2,184 99,249.6
- 12. Number Of Hours Reactor Was Critical 697.I 1,746.3 68,052.5
- 13. Reactor Reserve Shutdown Hours 0
0' 844'.4
- 14. Hours Generator On-Line 691.8 1,668.5 67,590.4
- 15. Unit Reserve Shutdown Qours 0
0 121.8
- 16. Gross Thermal Energy Generated (MWif) 1,516,12' 3,509,049 138,997,641
- 17. Gross Electrical Energy Generated (MWH) 493,910 _,
1,134,175 44,344,740 469,736 1.070,552 41,983,569
- 18. Net Electrical Energy Generated (MWH),
93.0 76.4 68.1
- 19. Unit Service Factor
- 20. Unit Availability Factor 93.0
/6.4 68.2
- 21. Unit Capacity Factor (Using MDC Net) 94.8 73.6-65.3
- 22. Unit Capacity Factor (Using DER Net) 91.1
/U./
61.0
- 23. Unit Forced Outage Rate
~7.0 17.0 5.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of F--art Period. Estimated Dat:of Startup:
- 26. Units in Test Status (Prio (4 ( ommercial Operation):
Forecast Achined INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (967) j i
~
DOCKET NO.
50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit #3 DATE d-16-84 D 8Y N M Grant REPORT MONnt March 1984 TELEPHONE (305) 552-3675 n.
E c
3g 3
yIh Licensee Eg
- 4 Cause & Corrective No.
Date g
3g s
2s&
Event
^ ' " " " ' "
3, U?
Ed f
5 j g.g Report a Prevent Recurrence H
m g
5 10 840227 F
52.2 A
4 EB RELAYX The unit was removed from service to inspect, adjust and repair auxiliary power air circuit breakers.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report iLER) File INUREG-D-Regulatory Restriction
@-Other (Explain) 0161)
E-Operator Training & Ucense Examination 9,
F-Administrative 5
G-Operational Frror IFsplain)
- 4. 4e ao Asowe_v..c#
Exhibit I - Same Source (9/77) 11-01her (Explain 1
SUMMARY
OF OPERATING E.<PERIENCE DOCKET HO, 50-250 UNIT Turkey Point Unit #3 April 16, 1984 DATE N. W. Grant COMPLETED BY TELEPHONE REPORT HONTH March 1984 Unit #3 operated at essentially full power except as indicated in the
" Unit Shutdowns and Power Reduction" Report.
Inspection and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
AVEll AL i DAILY UNIT POWER LEVEL 1
50-251 DOCKET NO.
UNIT Turkey Point #4 DATE 4-16-84 COMPLETED BY - N.W. Grant TELEPilONE (305)S52-3675
!! arch 1984 MONTH DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
-(MWe-Net )
17 2
374
,3 3
684 4
683 20 5
678 2
6 628 7
33
~~~
8 24 9
25 10 3
y,
~~
I2 28 13 9
14 30
~~
15 3i INSTRUCTIONS On this format hst the aver.sge daily unit power :esel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771
)
OPERATING DATA REPORT DOCKET NO. _50-251 DATE.4-16-84
.W. Grant R(305)552-3675 COMPLETED llY TELEPHONE OPERATING STATUS
- 1. Unit Name:
Turkey Point Unit #4 Notes Flarch 1984 Unit #4 was taken out of
- 2. Reporting Period:
2,200 se d e b [efue1ing and
- 3. Licensed Thermal Power (MWI):
scheduled maintenance.
/bu
- 4. Nameplate Rating (Gross MWe):
693 S. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reawns For Restrictions.lf Any:
This Month Yr.-to Date Cumulatise
!I. Hours In Reporting Period 744 2,184 92,977
- 12. Number Of Hours Reactor Was Critical 115.5 1,316.6 65,955.2
- 13. Reactor Reserve Shutdown Hours 0
0-160.0
- 14. Hours Generator On-Line 111 4 1.269.3 63,737.4
- 15. Unit Resene Shutdown Hours 0
0 31.2
- 16. Gross Thermal Energy Generated (MWH) 238,983 2,761,901 134,508,642
- 17. Gross Electrical Energy Genersted (MWH) 76,975 898,385 42,819,687
/0,/Ud 848,172 40,552,231
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor 15.0 58.1 68.6
- 20. Unit Availability Factor 15.0 58.1 68.6
- 21. Unit Capacity Factor (Using MDC Net) 14.3 58.3 67.3
- 22. Unit Capacity Factor (Using DER Net) 13.7 56.0 62.9
- 23. Unit Forced Outage Rate 34.4 21.1 4.8
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
ay 9, N
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achined INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCI AL OPERATION (9/771 L
50-251
~
DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME Turkev Point Unit #4 DATE d 16-Ma COMPLETED BY N.W. Grant REPORT MONTH March. 1984 TELEPHONE (305) 552-3675 s.
O C
33 3
- Ii Licensee
,E g
$*),
Cause & Corrective g{
No.
Date g
3g 4
2s5 Event p
Actism to Prevent Recurrence fE 5
j ;g.g Report a mO H
5 05 840227 F
32.3 A
4 EB RELAYX The unit was removed from service to inspect, adjust and repair auxiliary power air circuit breakers.
06 C40306 F
26.0 A
1 CB VALVEX Unit removed from service to repair leakage from pressurizer spray valve packing.
07 840308 S
574.3 C
1 RC FUELXX Unit removed from service for re-fueling and scheduled maintenance.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S. Scheduled A. Equipment Failure (Explain) 1 -Manual fo: Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction
@-01her (Explain 1 0161)
E-Operator Training & Ucense Examination j
F-Administrative 5
G-Operational I wror (F splain t x. /.o a o A s e ve.w.c#
Eshibit I - Same Source 19/77) 11-01her (Explain)
SUMMARY
OF OPERATING EXPERIENCE D.ICKET NO.
50-251 UNIT Turkey Point Uriit #4 DATE April 16,1984 COMP.,ETED BY N.W. Grant T.U,EPIIONE (305)552-3675 REPORT MONTH March 1984 Unit 4 was removed from service for a refueling and scheduled maintenance outage.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
l
?
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-335 St. Lucie Unit #1 UNIT
~
DATE N.W. Grant COMPLETED itY (305)552-3675' TELEPilONE March 1984 MONE DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)
-(MWe-Net )
1 g{
2 g
-~~
3 39 4
20 S
j j
~~
~~~
6 22 7
23 g
~~
9 25
~~
10 26 g
g3 28 13 29 I4 30 I5 3,
I6 INSTRUCTIONS On this forenat.hsr the aserage daily unit power leselin MWe Net for each day in the reporting inonth. Compute to the nearest whole rmgawait.
(9/77)
OPERATING DATA REPORT DOCKET NO. 50-335 DATE 4-16-84 COMPLETED llY N.W. Grant TELEPHONE (3Ub)bbz-3675 OPERATING STATUS i
I' Unit Name.
St. Lucie Unit #1 Notes March 1984 Unit #1 remained out of
- 2. Reporting Period:
2700 service for refueling and
- 3. Licensed Thermal Power (MWt):
scheduled maintenance.
890
- 4. Nameplate Rating (Gross MWe):
830
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr to.Date Cumulative 744 2,184 63,792
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
0 44,466.1 r
- 13. Reactor Reserve Shutdown Hours 0
0
' 205.3
- 14. Hours Generator On.Line 0
0 43.576.2
- 15. Unit Reserve Shutdown Qours 0
0 39.3"
- 16. Gross Thermal Energy Generated (MWil) 0 0
108,667,938
- 17. Gross Electrical Energy Generated (MWH) 0 _,
0 35,373,875
- 3,068
- 8,554 33,'325,719
- 18. Net Electrical Energy Generated (MWH)'
O U
68.3
- 19. Unit Service Factor
- 20. Unit Availability Factor 0
0 68.4 0
0 66.2
- 21. Unit Capacity Factor (Using MDC Net) 0 0
66
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
0 4.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
ng N
- 26. Units in Test Status (Prior Io Commercial Operation):
Forecast Achined INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION
('l/T I
y u
,m
'~
DOCKET NO. 50-335 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit #1 DATE 4-16-84 March 1984 COMPLETED BY N W Grant REPORT MONTil TELEPHONE (305)SS2-3675
.! E 3
Y Licensee 5%
Cause & Corrective Date g
3g j
jg5 Event g
- o. ?
Action to f0
$E E
j5g Report it mU H
Prevent Recunence 6
,3 830226 S
744.0 C
4 RC FUELXX Unit #1 remained out of service for refueling and scheduled maintenance.
I 2
3 4
f Forced Reason:
Method:
Exhibit G. Instructions S Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Mamtenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report t LER) File (NUREG-D Regulatory Restriction 9 Other(Explain) 0161) l:-Operatiyr Training & License Examination F-Adnunistrative 5
G-Operati mal Error (F = plain) x. Ao ao uovea..cl Exhibit I - Same Source 19/77)
Il-Ot her I Explain)
\\
SUMMARY
OF OPERATING EXPER.TENCE DOCKET NO, 50-335 UNIT St. Lucie Unit 1 DATE April 16,1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPCRT HONTH March 1984 St. Lucie Unit I remained out of service for a refueling and scheduled maintenance outage.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
1 AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 St. Lucie Unit #2 UNIT 4-10-04 DATE N.W. Grant COMPLETEDsy (305)552-3675 TELEPflONE March 1984 MONTH DAY AVERACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) lMWe Neti I
814
- j 815 818 2
33 816 D
3 19 4
820 814 20 818 5
8 OIO 814 6
22 7
820 815 23 8
813 814 21 820 9
25 814 820 813 10 26 11 818 811 27 818 12 28 811 819 812 13 29 14 818 811 30 818 813 15 017 16 INsntUCDONs On this format, hst the netage daily unit power leselin MWe Nei for each day in the reporting month. Compute to the nearest whole *wgawatt.
(9/77I
- A
OPERATING DATA REl't RT DOCKET NO.
50-389
.~A -*
DATE COMPLETED BY
.W. Grant 30SE57:3675 TELErt10NE OPERATING STATUS
- 1. Unit Name:
St. Lucie Unit #2 Notes March 1984 Unit #2 operated at
- 2. Reporting Period:
2,560 essentially full power.
- 3. Licensed Thermal Power (MWt):
850
- 4. Nameplate Rating (Gross MWe):
804
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sine t I.ast Report, Give Reasone
- 9. Power Lese! To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr..to Date Omnulatise 744 2,184
,__5,689
- 11. Hours In Reporting Period
- 12. Number of Hours Reactor Was Critical 744 2,165.4 5.392.4
- 13. Reactor Reserve Shutdown Hours 0
0 0'
- 14. Hours Generator On Line 744 2.029.6 5,160.0
- 15. Unit Rewrve Shutdown liours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 1,904,246 5,101,877 12,759,821
- 17. Gross Electrical Energy Generated (MWH) 640,050,,
1,715.580 4,258,800
- 18. Net Electrical Energy Generated (MWH) 606 7 7 1,620,468 4.018.054
- 19. Unit Service Factor 100 92.9 VU.7
- 20. Unit Availability Factor 100 92.9 90.7 103.8 94.4 89.9
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 101.4 92.3 87.8 0
5.8
_8. 8
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration i f Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast As hii4ed INITIA L CRITICALITY INITIA L El.ECT RICITY COMMERCIAL OPER ATION e
(967) d
~
50-389 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
l UNIT NAME 5t. Lucie Unit #2 DATE 4-lb-04 l
REPORT MONTH March 1984 COMPLETED BY N.W. Grant TELEPHONE (305)SS2-3675 l
i l
e.
u C
i
.5?
3
$ EE E
Cause & Corrective Licensee Et S.%
Na-DJte e;.
3=
4
.a i &
Event sg
'?
Action to E
3 gi =!
Repori =
- E O
!0 Prevent Recurrence e
O l
d l
i l
Unit #2 had no shutdowns or l
significant power reductions.
l
~
i i
l l
l I
l b
l I
2 3
4 l
F: Fiwced Reason:
Method:
Exhibit G. Instructions S. Scheduled A-Equaprnent Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-i D-Regulatory Restriction 9-Other (Explam) 0161)
E-Operator Training & License Exanunation F-Administrative 5
G-Operati. mal Ea rnr i F splain) 6_
/.o ao 44ewc.w.et Exlubit I - Same Source I'l/77)
Il-Ot her i Explain) i i
SUMMARY
OF OPERATING EXPEllIENCE DOCKET No.
50-389 UNIT St. Lucie Unit #2 DATE April 16,1984 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT HONTH March 1984 Unit 2 operated at essentially full power.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company Commitments for NUREG 0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month.
- 'y FLORIDA POWER & LIGHT COMPANY April 16,1984 PNS-LI 128 Director, Office of Resource Manajonent U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Attached are the March 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours,
/44Nn J. W. Willi ans, Jr.
Vice President Nuclear Energy JWW/PLP/js Att achment cc:
J. P. O'Reilly, Region II 6