Forwards Final Rept, Point Beach Nuclear Power Plant Full-Scale Joint Emergency Exercise on 820309. Schedule of Corrective Actions Submitted by State of Wi for Deficiencies Noted in Rept
ML20084E396
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/1984
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20084E398 List:
References
NUDOCS 8405020263
Download: ML20084E396 (2)


Text

--

l 1

['f E

g Federal Emergency Management Agency

.f Washington, D.C. 20472 O

O MEMORANDUM FOR: Edward L. Jordan Director, Division of Emergency Preparedness and Engineering Response Otfice of Inspection and Enforcement U.S. Nucleap Regulatory Commission FROM:

r

/

p si' stint Associate Di' rector uffice of Natural and Technological Hazards Programs

SUBJECT:

Final Exercise Report for the Point Beach Nuclear Power Plant Offsite Radiological Emergency Preparedness Exercise of March 9, 1982 Attached is the final exercise report for the joint of fsite radiological emo gency preparedness exercise conducted on March 9, 1982, at the Point each Nuclear Power Plant. This was a full participation exercise for the State of Wisconsin and Kewaunee and Manitowoc Counties.

A schedule of corrective actions submitted by the State of Wisconsin for the deficiencies noted in the final exercise report of March 9, 1982, is also attached. Based on the exercise and the review of the schedule of corrective actions, we have determined that the State and Kewaunnee and Manitowoc Counties demonstrated the capability to protect the health and safety of the public living in the vicinity of the Point Beach Nuclear Power Plant in the event of a radiological emergency.

If you have any questions, please contact Mr. Robert S. Wilkerson, Chief, Technological llazards Division, at 287-0200.

Attachments As Stated l

8405020263 940425 PDR ADOCK 05000 6 F

h-IE I

fjt

c i

l t MAY 1 v k: g,,

r NE!0kANDUlf FOR: Assistant Associate Director Office of Natural and Technological Mazards FROM:

ActinF Chief, Technological Hazards Branch SUILTECT:

Final Roport - Point Beach In accordance with Lee T1,omas' draft memorandun, subject, Exercise Eval-untion, the Final Report of Point Beach Power Plant exercise of March 9, 1932, is outmitted.

A copy of this report has been forwarded to the State of Wisconsin and a request for them to respondato FE!'A Rep.ino V with their schedule of corrective actions. Upon receipt of their schedule, we will forward a copy to you to keep you informed as to how the corrective actions will be implemented.

Edwin W. Halala Attachment cc PD Mr. Finch EMS-WI 1