Monthly Operating Rept for Mar 1984.W/undated Ltr
ML20084E283
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/31/1984
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8405020218
Download: ML20084E283 (5)


Text

~~

~

~

~

L' NIT I

4-3 84 DA"II i

C05fPLETED SY W.G. It irston.III i

TELI?HCNE (2ns)soo-5156 310t(Tl!

March. 1984 DAY AVERAGE DAILY POWER LEVEL DAY' AVERACE DAILY POWER LEVEL (AlWe Net)

(SIWE Net)

O o

g7 2

0 g3 0

3 0

19 0

4 n

20 0

0 21 o

6 o

n 0

T D

0 8

0 24 o

i 9

o u-n 10 m

26 0

l 11 0

27 n

12 0

23 a

0 13

9 o

14 0

30 0

15 31 0

16

!?tSTRUCriONS On this form:t. list the aversge daily umt power Icvelin MWe Net for c:ch d:y in the reporting month.Campute to

, the neare:t whule rne;: watt.

(9p7) 8405020218 840331 PDR ADOCK 05000348 R

PDR

1 e'

9 OPERATING DATA REPORT DOCKET NO.

50-348 DATE 4-10-84 COMPLETED BY t.' c uniraton. III TELEPilONE mno no-5156 OPERATING STATUS

1. Unit Name:

ina"nh M-Fn"foy

n'"

1

2. Reporting Period:

March. 1984

1) Cumulative data since
3. Licensed Thermal Power lMWt):

2652 12-1-77, date of

4. Nameplate Rating (Gross MWe):

860 commercial operati~on.

5. Design Electrical Rating (Net MWe):

829 841.8

6. Maximum Dependable Capacity (Gross MWe):

.s

7. Masimum Dependable Capacity (Net MWe):

797.I

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

N/A

9. Power Level To Which Restricted,if Any(Net MWe):

N/A

10. Reasons For Restrictions.If Any:

N/A This Month Yr..to.Date

'Cuniutatise

11. Hours in Reporting Period 744 2.184

'55:512

12. Number Of Hours Reactor Was Critical 0.0 938.0 36,061.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.7
14. Hours Generator On.Line nn 904.5 35,00/.9
15. Unit Reserse Shutdown Hours 0.0 0.0 0.0
16. Cross Thermal Energy Generated (MWH) 0 2,360,784 88.462,310
17. Gross Electrical Energy Generated (MWH) 50 751,712 28.094,722
18. Net Electrical Energy Generated (MWH)

-4676 701,994 26,403,056

19. Unit Service Factor 0_o 41.4 63.1
20. Unit Availability Factor o.o 41.4 63.1
21. Unit Capacity Factor IUsing MDC Net)

-0.8 40.3 59.7

22. Unit Capacity Factor (Using DER Net)

-0.8 38.8 57.4

23. Unit Forced Outage Rate 0.0 8.I 15.1
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

April 21. 1984

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 8-6-77 8-9-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPER ATION 12-1-77 12-1 g j

N/77i

~

UNIT SilUlDOWNS AND POWER REDUCTIONS DOCK ET NO.

50 348 UNII N GIE f"-

Pa ri n - Unit 1, ilAIE

?- "t-9A COSIPLElED IlY v c no<uen,, yII REPORT blONill "nrch. 1AR4 TELLPflONE (2n5) 999-5156 i

e.

E E

!E

'h j E5 Licensee 5-r, h

Cause 1 Corretsise No.,

Date g

g s

jg5 Evens gg g3 Actism sin yE E

3 ;ji =

Repost a o

mO O

F o

Prevent Recurrence e

6 003,

840301 S

744.0 C

3 84-002-00 N/A N/A The Cycle V-VI refueling outage continued from 2-10-84.

i t-I 2

3 4

F: Iorted Reason:

hiethod:

Eminbit G Insisutti ms S: Stheduled A Fquipment Failure (Emplain)

I Alanual for Piccaration of Data R hlaintenance of Test 2-klanual Scram.

Ent > Shects for I.kcosee C Refueling 3 Automatic Sciam.

Esent Repost (I.ERll'i!clNtlRIE D Hegidaimy Restsittion 4-Other (Emplain) 01611 E Operator Training A license Examination F Administrative 5

G Opceatismal Essur (Emplain) thinbia I - Same Sousa rs/n) 11 Oshes (Emplain)

/

Malling Address Alabama Powsr Company 600 North 18th Street Post Office Box 2641 Dirmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

% " # * " 2 7"'

Alabamalbwer

\\

etm sourten atetre system t

Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) ccpies of the March 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very ru QQA g//

N. L. Clayton, Jr.

FLCJr/KWM: sam Enclosures Mr. Ted Cintula (1 copy))

xc: Director, IE (10 copies Director, RII (1 copy)

+4

4 o

JOSEPli M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MARCil, 1984 The Cycle V-VI refueling outage continued into the month of March.

The following safety-related maintenance was performed in the month of March:

1.

Installed counter on reactor trip switchgear.

2.

Removed, inspected and reinstalled various hydraulic anubbers.

3.

Removed steam generator manway covers.

4.

Replaced reactor coolant filter.

5.

Replaced waste evaporator feed filters.

.