Monthly Operating Rept for Mar 1984
ML20084E212
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1984
From: Dodge R, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8405020181
Download: ML20084E212 (7)


Text

.

i

.l.

OPERATING DATA REPORT DOCKET NO.

50-244 DATE 4 9 84 j

COMPLETED BY d 2 8 I4 b

"' Robert E. Dodge i

315-524-4446 Ext. 396 TELEPilONE OPERATING STATUS Ginna Station

l. Unit Name:

GINNA STATION. UNIT #1 Notes The reactor power level March 744 was maintained at 96% for the

2. Reporting Period:

1520

3. Licensed Thermal Power (Mit):

first two days of March. The 490 unit was removed from service

4. Nameplate Rating (Gross Mie):

470 3/3/84 for Annual AIEO.

5. Design Electrical Rating (Net Mie):

490

6. Maximum Dependable Capacity (Gross MTe):

470

7. Maximum Dependable Capacity (Net Mie):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level to Thich Restricted, If Any (Net MWe):

J

10. Reasons For Restrictions, If Any:

N/A i

This Month Yr. to-Date Cumulative 744 2,184 125,760

11. Ilours In Reporting Period 50.08 1,490.08 95,090.06
12. Number of flours Reactor Tas Critical 0.00 0.00 1.631.32
13. Reactor Reserve Shutdown llours 49.55 1,489.55 93.001.18
14. Ilours Generator On-Line 0.00 0.00 8.50
15. Unit Reserve Shutdown flours
16. Gross Thermal Energy Generated (MTH) 64,896 2,207.424 128.464.703

,028 733,488 41,987,858

17. Grt,ss Electrical Energy Generated (MTH) lo,)dd 694,289 39,720,534
18. Net Electrical Energy Generated (Mill) 6.66%

68.20%

73.05%

19. Unit Service Factor 6.66%

68.20%

73.06%

20. Unit Availability Factor 4.72%

67.64%

68.96%

21. Unit Capacity Factor (Using MDC Net) 4.72%

67.64%

68.96%

22. Unit Capacity Factor (Using DER Net) 0.00%

0.00%

7.o0%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

4

^

25. If Shut Down At End Of Report Period, Estimated Date of Startup: May 6, 1984
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY LNITIAL ELECTRICITY COMMERCIAL OPERATION 8405020181 840331 PDR ADOCK 05000244 R

.PDR

2-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244 UNIT #1. Ginna Station April 7,1984 DATE hd$YW Robert E. Dodge TELEPHONE 1 (315) 524-4446 Ext. 306 Ginna Station MONTil Flarch, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We-N et)

(MWe-Net) 1 457 17 2

369 gg 3

II 4

29 5

21 6

22 7

23 8

24 5

25 10 26 11 21 12 28 13 29 14 38 15 31 16

  • Unit shutdown at 0133 on 03/03/84 INSTRUCTIONS l

On this format. list the average daily unit power level in MWe-Net for each day in the reporting month.

l Compute to the nearest whole megawatt.

48*87 REV. 9/ 80 e

DOCKET NO.

50-244 UNIT NAME #1,Giina Station April 7,1 84 UNIT SHUTDOWN AND POWER REDUCTIONS DATEy,d8M, -

d COMPLETED HY Robert E. Dodge REPORT MONTH Ma rch. 1084 TELEPilONE 1 (315) 524-4446 Frt. 306 Ginna Stition ci Eq II Licensee us Cause & Corrective f,

gj Action to c

  • j He.

Date

{

jj

$ }d.

Event e

gz j

Report #

Au

!u Prevent Recurrence e

u 2

g i

o 1

3/3/84 S

Not B, C 1

Unit was shutdown at 0133 hours0.00154 days <br />0.0369 hours <br />2.199074e-4 weeks <br />5.06065e-5 months <br /> on Avail.

3/3/84 for Annual inspection, refueling, and maintenance.

i t

k 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipament Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction '

4-Orber (Explain) 0161)

E-Operator Training ac License Examination F-Administrative 5

E G-Operatican! Error (Explain) ase inzv.ines H-Other (Explain)

Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Nuclear Power Plant, Unit No.1 DATE April 7, 1984 COMPLETED BY V'

Robert E. Do(ge TELEPHONE 1 (315) 524-4446 Ext. ' 396 Ginna Station MONTH Mar _ch, 1984 On 3/3 the unit was removed from service for the annual inspection, maintenance, and refueling shutdown.

4 E

l l

1 as tas (t/7s

GINNA STATION MAINTENANCE REPORT

SUMMARY

4 MARCH 1984 During the month of March, routine maintenance and inspections were completed along with maintenance scheduled during the current refueling outage.

Safety-related maintenance included:

.l 1.

Annual maintenance and inspection of the 1A and IB Emergency Diesel Generators, and' cleaning of both diesel Fuel Oil Storage Tanks.

2.

Calibration of Reactor Protection Channels and Technical i

Specification Instrumentation.

3.

Inspection, maintenance, and test of 480 Volt Breakers on Busses 14, 16, 17, and 18.

4.

Minor inspection and preventive maintenance of the personnel 1

airlock.

5.

The start of maintenance and decontamination associated with replacement of the "B" Reactor Coolant Pump rotating assembly.

6.

Repair of many valves on the SI' accumulators.

7.

Repair of sample valves AOV-953, AOV-955, and V-956E.

8.

Inspection and maintenance of the Station Battery Systems.

9.

Inspection, preventive maintenance and testing of Pressurizer Safety Valves, RV-434 and RV-435.

10.

Inspection and preventive maintenance of Pressurizer Spray Valve, PCV-431A.

11.

Inspection and repair of the refueling transfer car and j

drive mechanism.

i 12.

Preventive replacement of various valve diaphragms on CVCS valves.

d 13.

Inspection and repacking of various primary and secondary system valves.

14.

Replace RCS primary loop RTD TE-410A.

15.

Inspection and cleaning of Main Feedwater Flow orifices.

. _ _ =.. -. _

~.

~16.

Maintenance support for refueling activities including reactor vessel head disassembly, inspection of vessel studs, fuel handling system checkout, and lif ting rig and crane inspections.

17.

Steam Generator maintenance included oddy current inspection, installation of 4 tube sheet sleeves in the "B" Steam Generator, explosive and mechanical tube plugging, repair of leaking plugs in the "A" Steam Generator, water lancing the secondary side of both Steam Generators, inspection of the secondary i

side of ~ both Steam Generators, inspection of the J-tubes I

on both Steam Generator feed rings, and repair of leaking.

j plugs on the feed ring.

I i

e I

l I

i A

i i

i I

l l

i

=

/

,M(

e;ry;!gg;;g

... -.[ ~ "" C

}l.', b' 3 y

em}

.W D L ~ 3 cT:

2:,*""l

( :q ROCHESTER GAS AND ELECTRIC' CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 vnsenohr ant coor no 546-2700 GINNA STATION April 11, 1984 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for March, 1984 Operating Status Information R.' E.' Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Dear Sir Pursuant to our Technical Specification 6.9.~1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1984 very truly yours, b

b' Bruce A.7 Snow Plant Superintendent BAS /eeg Attachments cca Dr. Thomas E.'Murley NRC (L)

.