ML20084D919

From kanterella
Jump to navigation Jump to search
Forwards Purple Binder Spine & Cover Inserts for Plant IST Manual
ML20084D919
Person / Time
Site: Monticello 
Issue date: 05/22/1995
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506010260
Download: ML20084D919 (4)


Text

_

Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 May 22,1995 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Revision to Monticello IST Proaram Document A revision to the program document goveming the Monticello IST Program was recently processed. This revision was processed to incorporate final NRC comments contained in the staff's SER as well as transfer the program document to a Monticello controlled document.

This document was previously issued as a manual from our corporate office with title; "Monticello Nuclear Generating Plant, inservice Testing Program, ASME Code Section XI" (MNGP IST Manual). The IST program document has been transferred to a manual, containing a series of procedures categorized as Engineering Work Instructions, under the control of Monticello Site Document Control The IST program previously contained in the MNGP IST Manual has been transferred to Engineering Work Instruction (EWI) EWi-09.04.01,

" Inservice Testing Program."

By Monticello document control manifest dated May 18,1995, the revision to the Monticello IST Program Document issuing EWl-09.04.01 to supersede the MNGP IST Manual was transmitted to you. An error occurred in the transmittal of this manifest in that the proper instructions for superseding the MNGP IST Manual and issuing the EWI were not included.

The following instructions should be followed.

The pages contained in the superseded MNGP IST Manual are to be destroyed as well as the binder spine and cover insert sheets.

The purple binder spine and cover inserts, enclosed with this letter, should be inserted into the three ring binder which remains after deletion of the superseded MNGP IST Manual contents.

The index of the Engineering Work Instructions (EWis) and EWi-09.04.01, " Inservice Testing Program" transmitted via the document control manifest dated May 18,1995 are to be inserted into the three ring binder with the new purple binder spine and cover inserts.

9506010260 950522

/(

l PDR ADOCK 05000263 P

PDR

/

A

)

k

V, USNRC NORTHERN STATES POWER COMPANY May 22,1995 Page 2 Sign and retum the document transmittal manifest, dated May 18,1995, transmitted previously with the black binder containing the EWI Index and EWi-09.04.01, to acknowledge receipt of the EWI mar"Ja!information and deletion of the superseded MNGP IST Manual.

This letter contains no new NRC commitments, nor does it modify any prior commitments.

Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

.b rob oger O Anderson Director Licensing and Management issues

Enclosures:

1) Replacement Binder Spine and Cover Inserts for EWI Manual i

l Q

n

-.,,, - -.n.-

- - + - -

- - - -