ML20084D856
| ML20084D856 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/10/1970 |
| From: | Hoyt H COMMONWEALTH EDISON CO. |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| 03390, 3390, NUDOCS 8304120489 | |
| Download: ML20084D856 (2) | |
Text
_
'^ w x.
O-h,67-037 e
Ax3 y
r 6
i I
u p
'Nd e-j'/
UO121tnonveealth E',dison Uompany A
72 WChy A D t. M n nTRLET A C 1' 1 C A G O.
I1.L1 N O fG Addr.s Aer's t.,
to$f Off6CE 50% 767
- C I' I C A G O, li t l N O l$ 40690 Dresden Euclear Pcwcr Station L ll. Al Morris, Illineia 60450 se.ptember 10, 1970
. ' N \\ >n s s-"t ::,.
s'e U-
.;:57
~:
!j[Z 'C) 5 Dr. Peter A. Mcrris, Director
[
w, Divinion of reactor Licensing
-] [ ' - {T i-U. S. Atoalc Energy Corcenitsion te
", Os Wanhington, D. C.
20345
'/u>s
Dear Dr.11 orris:
wQp f.
SUBJ"CT: 1.icense DPR-19 Uresden Nucl. int Pcuar Station Unit 2, Section
_6. 6. C.1 of the Technical L'pecificationn This is to report a condition relating to the operation of the station in which the liigh Pressure Coolant Injection (HFCI) cystem was found to be significant1v clover in remponc.o than ice design c=cr;,cacy starting time us listed in Table 6.2.5 of the D:coden Safety Analysis Rcrort.
Problem and Initial Action On August 13, 1970, a HPCI syste:n cold quick start test was con-ducted.
The system requircd 60 seconds to attain rated flow; required tino is 25 seconds.
Speed appeared to rapidly increase to 2000 rpm and then slowly increased to rated.
Based en the slew starting tine, HPCI was declared inoperative and the surveillance required by section 4.5.C.2 of the Technical speci-fications was performed.
Investigation and Corrective Action Further investigation showed that the system uould meet its required starting time if the control oil systen ucre kept charged.
This could be accomplished by running the HPCI auxiliary oil pump for at loadt 4 minutes once a shift.
This program was begun and HPCI was declared operable again.
S O N J M r/ p/ u g dersized orifico in a control oil line and a test plug which was re-Continuing investigation.of_HPCI responso times-revealed an
-~
un
-- ^ g_ g -
moved-allowing-drainage 7of thcTcontrol'line'over a period of time.
The
~ orifice was enlarged, plug reinstalled, and further testing showed that once a*chift running of the oil pump was no longer required.
l,3o,12o
,7
,io SEP 151970 s
ogso COPY SENT REGION on ApocK os y y 23gg -
3
's Dr l'eter A
- u. e_9
_2 uepte:rber 10, 1970 41ich stort t e r, t s we r e c c,d e,~' *~ ed " " " "- e - 0 W Y 'N1 I
18, 1970, see ic,r e n, c f~,,,, " "g "...' ' "' y b,"igu s t The tincc to iull cl~, t,ere tv
,n
)
"_ " W,' R' l quick ctart, which are cell n..;.mia rec,uired t arLial; tiracu.
o
/,x /?
l,l- ,/,/
, /:),i;,/,, ' ;, i li. 10. iia't y
Superinter. dent l!KIf:jlh Dresderi 1-Cuclear Poscr Statica e
I i
l l
l I
W i
O
\\
I