ML20084C154
| ML20084C154 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/19/1984 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8404270121 | |
| Download: ML20084C154 (1) | |
Text
h Y
' tTi.< O
- > t,t ? ':, n 51 f
~ >1 E l la t r u "., o 31A ll p L ;. c r> T l~j j r' ij e t U '<;,'* n t 2
o<
s u
a t1 ; - io n
u.L i
v-n, 4
P.O. box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR Mr. James G. Keppler Regional Administrator, Region III 9ffice of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Response to Construction Appraisal Team I.E. Report, 50-440/83-31; 50-441/83-30 Notice of Violation Transmitted December 23, 1983
Dear Mr. Keppler:
Please refer to pages 16 and 17 of my letter dated January 22, 1984. All corrective action associated with Item 6 of your Notice of Violation dated December 23, 1983, was expected to be completed by April 30, 1984. Due to the extent of engineering review and field inspections being performed, it is now anticipated that all corrective action will be completed by July 31, 1984.
If there are additional questions, please do not hesitate to call.
Sincerely, 3
Murray R. Edelman Vice President Nuclear MRE:pab cc:
Mr. M. L. Gildner NRC Site Office Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
'U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 30/
A 8404270121 840419 I
l/
PDR ADOCK 05000440 APR23 m '
O PDR c