Revised Application for Amend to Licenses DPR-52 & DPR-27, Changing Tech Specs Re Criteria for Type a Integrated Leak Rate Testing,Superseding 831025 & 840207 Applications
ML20084A994
Person / Time
Site: Point Beach  
Issue date: 04/18/1984
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20084A998 List:
References
TAC-52665, TAC-52666, NUDOCS 8404260038
Download: ML20084A994 (2)


Text

y" lHsconsin Electnc m com 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 April 18, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Attention:

Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266.AND 50-301 MODIFICATION TO TECHNICAL SPECIFICATION CHANGE REQUEST NO. 94 CRITERIA FOR TYPE "A" INTEGRATED LEAK RATE TESTING POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Mr. Miller's letter dated March 6, 1984 forwarded a number of comments on our application for license amendments dated October 25, 1983, as modified on February 7, 1984.

This amendment request addressed revisions to the Point Beach Nuclear Plant Technical Specifications for reduced duration Type "A"

integrated leakage rate testing.

The first comment concerned the apparent absence of a "significant hazards consideration" discussion in our February 7 modification.

We believe that the 10 CFR 50.91(a) (1) determination provided with our October 25 letter is equally applicable to the revisions provided with our February 7 letter.

A point-by-point comparison of the Specification 15.4.4.I.A.S.~a items in our October 25 submittal to the same specification items in our February 7 submittal shows little difference except for the item on environmental stability which was replaced by a specification on contaminant modeling.

This is in keeping with the final acceptance criteria listed on pages 5-1 and 5-2 of the referenced EPRI NP-3400 report.

In addition, Specification 15.4.4.I.A.5.b was expanded in our February 7 submittal to include the BN-TOP-1 testing criterion as presented on pages 1-2 and 1-3 of the EPRI NP-3400 report.

In both these cases, the material added to the Technical Specifications represent additional limitations i

or controls not presently included in the specification.

We note that the BN-TOP-1 criteria have previously been approved by the NRC.

These changes are also submitted in response to 940426M3G 840418

\\

PDR ADE M 05000266 P

PDR

~1-

)\\

Mr. H.

R.

Denton April 18, 1984 the NRC request for revisions which are necessary to ensure the specifications conform to the NRC regulations in 10 CFR 50 Apper. dix J.

The NRC has previously provided guidance in 48 Federal Register 14864 that changes of this nature are unlikely to involve a significant hazards consideration.

For these reasons we had concluded in our October 25 letter that the changes involved no significant hazards consideration.

The changes provided with our February 7 letter do not obviate any of these conclusions.

The second comment concerns the EPRI NP-3400 report submitted in support of the request.

It was requested that at least 30 copies of this supporting report be submitted.

We ha.ve previously forwarded to Mr. Colburn two copies of the report, in addition to the two copies provided with our February 7 letter.

We are sending, under separate cover, an additional 26 copies of EPRI NP-3400 to satisfy your minimum requirements.

A final comment concerned a number of minor clerical and typographical errors in the submittal and one apparent substantive change.

Specifically, you were concerned that proposed Specification 15.4.4.I.A.5.a(2) incorrectly stated that one rather than all the listed modeling conditions must be present.

The specification as proposed is, we believe, correct.

Your attention is invited to page 3-11 of the EPRI NP-3400 report which discuscos this critorion.

In order to correct the clerical errors your staff identified, we are providing herewith a complete package of revised proposed Technical Speci-fication page changes.

These pages supersede the proposed pages provided with our October 25, 1983 and February 7, 1984 letters.

As required by the Commission's regulations, we are j

enclosing three signed originals and forty copies of this modi-fication to our license amendments application request.

Please contact me if you have any additional questions conerning this request.

Very truly g urs, Vice Pro id t-Nuclear Power C. W. Fay Attachment Copies to NRC Resident Inspector C. F. Riederer, PSCW Subscribog and sworn to before me this S1 d_ day of April 1984.

h hjo N Y]Y2b4 N6taryPublic,Stateoffisconsin My Commission expires hf / /f//.