ML20084A610

From kanterella
Jump to navigation Jump to search
Requests LB Long Be Substituted for RA Thomas on All Correspondence.Corrected Copy
ML20084A610
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/16/1984
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8404250131
Download: ML20084A610 (1)


Text

=-

  • Mallin0 Address Alabama Power Company T

600 Nortn 18tn Street Post Oifice Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081

~

F. L. Clayton, Jr.

b Senior Vice president Flintridge Building AlabamaPower the soutwo eectr:c sy sfe, April 16,1984 I

Docket Nos. 50-348 L

50-364 B

i Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission

[

Washington, D.C.

20555 Attention: Mr. S. A. Varga T

Joseph M. Farley Nuclear Plant - Units 1 and 2 Distribution Update E-Gentlemen:

[

' Loio E

Please substitute Mr. eew+s B. Long, General Manager, for Mr. Ruble A. Thomas, Vice President, on all correspondence pertaining to Alabama f

Power Company.

E If you have any questions, please advise.

ry Yours very truly, b

e k

i F. l'. Clayton Jr.

a Em FLCJ r/ JAR:ddr-D29 cc: Mr. L. B. Long Mr. J. P. O'Reilly

%d; g2 Y[

Mr. E. A. Reeves Mr. W. H. Bradford gg

?

mat:JA Ji& m 6 " W'"Y*~

unam%

0y H

E

-