7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N0. 50-275 PACIFIC GAS & ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE On September 22, 1981, the U. S. Nuclear Regulatory Conmission (the Commission) issued Facility Operating License No. DPR-76 to the Pacific Gas and Electric Company (the licensee) for operation of the Diablo Canyop Nuclear Power Plant, Unit 1 (the facility) located in San Luis Obispo, California, limited to five percent of full power (166.9 megawatts the'rmal).
~
On November 19, 1981, the Commission suspended the license.pending the completion of an independent design verification progran. The Commission on
~
-April 13, 1984, reinstated the license and indicated that the expiration date of the license should be extended in accordance with the Licensee's request.
As part of this decision the Commission also decided to amend the license to provide an additional condition related to the revalidation of the seismic design bases for the facility. In addition, the Atomic Safety and Licensing Appeal Board, in i_ts decision of March 20, 1984, required appropriate jet impigement analyses.
The application for the license complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's-regulations. The Commission has made_ appropriate findings as required by the Act.of and the Commission's' Regulations in 10 CFR Chapter 1, which are set forth in the anended license. Prior public notice of-the overall action involving i
8404240559 840418 l
1 PDR ADOCK 05000275 P
PDR l=
~
7590-01.
the proposed issuance of an operating license was published in the Federal Register on October 19, 1973. The extension of the expiration date authorized by this amendment and the conditions contained therein are encompassed by that prior notice. The Comission has determined that t,he issuance of the-amendment will not result in any environmental impacts other than those evaluated in the Final Environmental Statement since the activity authorized i
by the license is encompassed by the overall action evaluated in the Final Environmental Statement.
For further details with respect to this action, see (1) the Commission's Safety Evaluation Report, dated October 16, 1974, and Supplements 1 through.
~
22; (2) the Final Safety Analysis Report and Amendment's thereto; (3)l the' Final Environmental Statement, dated May 1973 and-supplements thereto; (4)'the
~
Partial Initial Decision of the Atomic Safety and Licensing Board, dated July 17,1981; (5) the Decision of the Atomic Safety and Licensing Appeal Board dated March 20,1984; and (6) the Commission's Memorandum and Order dated April' 13, 1984.
These-items are available at'the Commission's Public' Document Room,1717 H Street, N.W., Washington, DC 20555, and at the. California Polytechnic State
' Univers'ity Library, Documents and Maps Department, San Luis_Obispo,' California
. 93407.
A I
^-
.= -, -
7590-01 Dated at Bethesda, Maryland this 18th day of April,1984.
FOR THE NUCLEAR REGULATCRY COMMISSION Orldinalslim iby
,Barrell G. Eisercut Darrell G. Eisenhut, Director Divison of Licensing Office of Nuclear Reactor Regulation l
I DL:LBf3 DL:LB#3 DL:LB#3 DL:AD/L DE:DIR DL:DIR
'r TMNovak RVollmer DGEisenhut HSchierl yt JLee GWKnighton
- t. :,14 4/f 4/ /84 4/ /84 4/ /84 4/lg/84 4/ /84 4/ /84
($.Q t
y-APR 181984 AMENDMENT TO MODIFY FACILITY OPERATING LICENSE NO. DPR-76 DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION
" Docket File 50-275/323 NRC PDR Local PDR PRC System NSIC LB#3 Reading J. Lee H. Schierling T. M. Novak J. Saltzman, SAB L. Chandler C. Miles H. Denton J. Rutberg A.'Toalston W. Miller, LFMB N. Grace L. Harmon E. Jordan D. Brinkman T. Barnhart (4) i i
iL J
--