Notifies That Fuel Load Date Could Be Extended to May 1986, Based on Normal Workshifts & Other Std Const Advancement Processes.Possible Actions Accelerating Const Progress Could Advance Projected Fuel Load Schedule
ML20083Q443
Person / Time
Site: Beaver Valley
Issue date: 04/13/1984
From: Woolever E
DUQUESNE LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
2NRC-4-041, 2NRC-4-41, NUDOCS 8404230072
Download: ML20083Q443 (2)


Text

o 2NRC-4-041 (412)787-5141 Tetecopy Nuclear Construction Division April 13, 1984 Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Do cke t No. 50-412 Projected Fuel Load Schedule Gentlemen:

The Nuclear Regulatory Commission (NRC) Forecast Panel visited the Beaver Valley Power S t ation Unit 2 (BVPS-2) site in January 19 83 and concurred with Duquesne Light Company (DLC) that the plant cons truct ion s uppo rt ed a proj ected fue l load date of December 31,, 1985.

In the docke t ing letter issued to "?PS-2 on May 17, 19 83, it was reques ted that the NRC staf f be informed of any change of that projected fuel load date.

Recent DLC fo recas t s show the proj ect ed fuel load date may be extended out to May, 1986.

This increased fo recas t is based on nonnal c ons truct ion work shifts and ot her s tandard construction advancement processes.

However, DLC management is evaluating several possible act ions which would accelerate the overall construction progress and could advance the projected fuel load schedule.

Thus, the licensing schedule established fo r BVPS-2 should not be alt ered because the pot ent ial delay does not include any planned recovery actions nor -the pos sible implementation of a recovery plan.

The BVPS-2 project is continuing unabated with all of the pr esent licensing activities planned for BVPS-2 and it is understood that DLC will continue to have the NRC's full support for the licens ing program as currently scheduled for BVPS-2.

This transmittal does not modify any previous DLC licensing commitments issued to the NRC.

DLC will continue to keep the NRC staf f advised of pot ent ial schedule changes and will provide notification of any actual change to the BVPS-2 project fuel load forecast.

N 8404230072 840413 y(

PDR ADOCK 05000412 PDR A

6-

United States Nuclear Regulatory Commissi-Mr. Darrell G. Eisenhut, Director Page 2 If you have any que s t ions conce rning this issue, ple ase call Mr. E. F. Kurtz, Jr., Manager, Regulatory Affairs, at (412) 787-5141.

DUQUESNE LIGHT COMPANY By s

'E. Ld. Tooleve r Vice President RWF/wjs SUBSCRIBED AND SWOP TO BEFORE ME THIS

./MkDAYOF (M

1984.

/11/LhhdAx Notary Public ANITA ELAINE REITER, NOTARY PUBLIC ROBINSON TOWNSHIP. ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 s

1 I

United States Nuclear Reguletory Commission Mr. Darrell G. Eisenhut, Director Page 3 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

On this

/J/I day of A&[

//,f!

, be fo re me,

a Notary Public in and fo r said Commonweal th and County, pe rso nally appeared E. J. Woolever, who being duly sworn, deposed and -said that (1) he 4

is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submit t al on behalf of said Company, arvi (3) the statements set fo rth in the Submittal are true and correct to the best of his knowledge.

m$

Notary Public ANITA ELAINE REITER, NOTARY PUBl.iC ROBINSON TOWNSHIP ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 1