I O), Commonw:cith Edison
[
O One First Nationai Plaza. Chicago, Ilhoots (Q Chicago, lilinois 60690 O ] Address Reply to: Post Othee Box 767 April 5, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Byron Generating Station Units 1 and 2 I&E Inspection Report No. 50-454/83-60 Reference (a):
March 6, 1984, letter from R. L.
Spessard to Cordell Reed.
Dear Mr. Keppler:
Reference (a) provided the report of an inspection conducted by Mr. R. Mendez at Byron Station on December 12-16, and 29, 1983.
During that inspection it was determined that certain activities were not in compliance with NRC requirements.
Attachment A to this letter contains Commonwealth Edison's response to the Notice of Violation appended to reference (a).
Please direct any questions regarding this matter to this very ruly yours, A
L.
Farrar Director of Nuclear Licensing im Attachment w
~
APR 9af4 g hYO
ATTACHMENT A Response to Notice of Violation Violation 10 CFR 50, Appendix B, Criterion V, as implemented by CECO Topical Report'CE-1-A,.Section 5, requires activities affecting quality be prescribed by documented instructions, procedures, or drawings and shall be accomplished in accordance with these instructions, procedures, and drawings..
Contrary-to.the above, sensing line connections to safety-related instruments 1LT-0529, ILT-0539, and ILT-0549 were installed contrary to the requirements of Sargent & Lundy drawing series M-2036, in that_the sensing lines were connected to the' low pressure side of each instrument instead of the high pressure side of the instruments.
'This-condition has not been identified by the licensee even though 1two of the instruments had been calibrated.
Corrective Action Taken and Results Achieved TheLinstrument' sensing lines for. level transmitters ~ILT-529,
'1LT-539, and lLT-549 have been reconnected in the corrected-orientation.
Corrective Action Taken to-Avoid Further Noncompliance
. Isometric ~ drawings for. double-piped 'sa fety-related ' instruments will be revised tp'show the proper high.and. low pressure connec-tions. -QC inspections of all such instruments will!be conducted utilizing the revised isometric drawings to-verify-correct tubing connections'to the instrument.
Power Azco Pope (PAP) Procedure FP-21 has-been revised to provide'for; documentation of such inspections on Procedure. Form 1103,-Instrument
Attachment:
Record.
All future installations will'be performed and: inspected asE
. identified-above..
Date When Full' Compliance Will Be Achieved Level. transmitters ILT-529, ILT-539.and ILT-549 were:all' reworked. prior to'Aprilul,e1984 3' Revised PAP: Procedure FP-21'was capproved on Januaryl3,11984. !The' reinspection of~ safety-related double-pipedLinstruments: currently 31nstalled'w111:-be. completed by.
PAP?by;Aprilj30,ul984.
)
~
~ '