Text
f
/
ame Omaha Pubile Power District
(
1623 Harney Omaha. Nebraska 68102 J
402/536 4000 November 15, 1983 LIC-83-288 7
i g y i p~
Mr. J.
E.
Gagliardo, Director Division of Resident Reactor Project i
1
& Engineering Programa i
U.
S.
Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Dear Mr. Gagliardo:
NPDES Permit Violation The Omaha Public Power Listrict, pursuant to an agreement made by letter dated April 15, 1983, provides the attached non-compliance report for the Fort C.21houn Station, NPDES permit number NE 0000418.
As agreed, a copy is also being provided to the Director, Of fice of Nuclear Reactor Regu-lation.
Sine rely, f*g'
. 3f
- J W. C. Knes Division Manager Production Operations WCJ/JCB
- jmm Attachment l
cc:
Mr. Darrell G.
Eisenhut, Director U.
S.
Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Division of Licensing Washington, D.C.
20555 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Y
Mr.
E. G. Tourigny, Project Manager Mr.
L.
A. Yandell, Senior Resident g {_
Inspector s
hK05000285 03 831115 ment with Eaual opp utunitu i
l 4s sin maten emale g
PDR j
in uoJ (qc; Hw,,M.v. Inou, LUH,
lff8,fFAT,TVG q- - - ' '
~+
Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402/536 4000 October 31, 1983 83-QARA-105 Mr. George Ludwig, Acting Director Department of Environnental Control State of Nebraska Box 94877 Lincoln, Ne'raska 68509-4877 t
Dear Mr. Ludwig:
Subject:
NPDES Outfall Bypass on October 22, 1983 This notification is reported pursuant to the NPDES Permit Number NE 0000418 for Outf all 3erial Number 002.
The bypass condition was due to the failure of two sump pumps which pump water treatment plant wastes from the service building sump to the l
chemical equalization and decantation holding basins (settling basins).
The sump collects wastes from the presedimentation and clarifier units and the sand and carbon filters located in the water treatment plant.
Since the sump pumps failed, the waste went out the sump overflow directly to the Missouri River. Details of the waste released during the bypass are as follows.
i Estimated gallons released:
3,000 Release Duration:
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, 10/22/83 - 2130 to 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> pH:
7.15 TSS:
883 mg/L The sump pumps were repai.ed and the water treatment plant wastes were routed as normal to the settling basins, if there are any questions concerning this report please contact me at (402) 536-4501.
Sincerely, (WA r
"E Thurtell Division Mancger Quality Assurance and Regulatory Affairs FAT /JDQ/1p Empiovnengngauji opponundu 6 w4}