Requests Approval by 830218 of Proposed Rev to FSAR Subsection 18.1.4,in Response to NUREG-0737,Item I.A.2.1, Upgrading Reactor Operator & Senior Reactor Operator Training & Qualifications
ML20083N808
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/28/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.2.1, TASK-TM AECM-83-52, NUDOCS 8302030181
Download: ML20083N808 (4)


Text

.

]

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi m etMeuddB P. O. B O X 16 40, J AC K S O N. MIS SIS SIP PI 3 9 2 0 5 Januar y 28, 1983 NUCLEAR PRoOUCTioN DEPARTMENT U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555 Attention:

Mr. Harold R. Denton, Director

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/0400/L-860.0 Reactor Operator On-Shift Training Requirements AECM-83/52 This letter formally documents the telephone discussion held on January 13, 1983, between members of our staff and J. Munro (Operator Licensing Branch) and J. Buzy (Licensee Qualification Branch), on the subject of reactor operator training requirements. As was pointed out in that discussion, the current Grand Gulf Final Safety Analysis Report (FSAR) response to NUREG-0737, Item I.A.2.1, is not consistent with the applicable NRC Staff requirements and is in need of revision. That proposed revision to FSAR subsection 18.1.4 is attached for your review and approval.

The current version of FSAR subsection 18.1.4 requires that senior reactor operator (SRO) candidates who are not licensed reactor operators (RO) at GGNS spend a total of 6 months on-shift time in an under instruction capacity.

This requirement is in excess of the guidance provided in the March 28, 1980, H. R. Denton letter to all licensees, which requires only 3 months on-shift under instruction experience in this case.

The current MP&L requirement is relatively restrictive and may cause significant delays in our endeavors to provide an adequate supply of licensed Senior Reactor Operators for the Grand Gulf Nuclear Station.

Q An individual who has not held an NRC Operator or Senior Operator License is considered to be an eligible candidate for the Senior Operator License examination, providing he meets the experience requirements and completes the three month on-shift training requirement and the appropriate training course to prepare him for taking the examinations.

Similarly, in accordance with the March 28, 1980, Denton letter (Part I.A.2.b), the individual does not have to hold an RO F302030181 830128 PDR ADOCK 05000416 P

PDR AElG1 Member Middle South Utilities System

a AECM-83/52 MISSISSIPPI POWER & LIGHT COMPANY age 2 license on GGNS to meet the intent of operating experience required of the SRO.

If the individual has held an R0 license on an operating BWR for one year, and (1) meets the SRO experience requirements, (2) completes the required on-shift training, and (3) completes the required R0-to-SRO upgrade training courses, MP&L consider's him eligible for an SRO license examination.

Your review and approval of this proposed change is requested by February 18, 1983.

Please advise if further information is required.

Yours truly, x

L. F. Dale Manager of Nuclear Services l

GWD/JGC/JDR:Im

Attachment:

Retised FSAR Page 18.1-5 (with Page 18.1-4 for Continuity) cc:

Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. J. P. O'Reilly, Regional Administrator (w/a)

Office of Inspection & Enforcement Region II 101 Marietta Street, N.W., Suite 3100 Atlanta, Georgia 30303 l

AElG2 t

GG FSAR years of nuclear power plant experience. A maximum of two years of power plant experience may be fulfilled by academic or related technical training on a one-for-one time basis.

Prior to initial plant criticality, the applicant shall possess six months of nuclear power plant experience at the Grand Gulf Nuclear Station. This experience may include participation in system acceptance, preoperational testing, and/or writing / verifying plant operating procedures.

After initial plant criticality, the applicant shall possess at least six months of nuclear power plant experience at the Grand Gulf Nuclear Station. The applicant's onsite experience shall include either:

a.

If the Senior Reactor Operator applicant does not hold or has-not held an NRC Operator License for a period of one year, the individual must meet the appropriate experience requirements stated above and complete a program of instruction that will end with a Senior Reactor Operator Certification on the GGNS Simulator.

In addition the individual must spend a minimum of 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> on shift carrying out the duties of the Senior Reactor Operator while under the direct supervision of a Licensed Senior Reactor Operator.

b.

If the Senior Reactor Operator applicant holds or has held an NRC Operator License, the individual shall spend 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> on shift l carrying out the duties of the Senior Reactor Operator while' under the direct supervision of a Licensed Senior Reactor Operator.

Additionally, after initial plant criticality, personnel who hold an Reactor Operator License on GGNS will have held that license for a period of one year prior to being administered an SRO examination.

The highest level of corporate management for plant operations is the Assistant Vice President - Nuclear Production, and he is responsible for certification that each license applicant is able to operate the plant safely and competently prior to proposing the candidate for licensing by the NRC.

This certification shall include considerations of successful completion of training, demonstrated abilities, satisfactory health, dependability, and stability.

Licensed Operator Training and Qualification programs at GGNS include training in heat transfer, fluid flow, the rmodynamics, and plant transients.

18.1.5 Administration of Training Programs (I.A.2.3)

REQUIREMENT Pending accreditation of training institutions, training instructors who teach systems, integrated response, transient, 18.1-5

c GG FSAR l

e.

An individual should not work more than 14 consecu-tive days without having 2 consecutive days off.

f f.

In the event that special circumstances arise that require deviation from the above, such deviations

/

should be authorized by the Plant Manager with appropriate documentation of the cause.

g.

If an operator is required to work in exces.s of 12 continuous hours, his duties should be carefully selected.

It is preferable that he not be assigned

~

any task that affects core reactivity or could possibly endanger the safe operation of the plant.

h.

If a Reactor Operator or Senior Reactor Operator has been working more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during periods of extended shutdown (e.g., at duties away from the control board), such individuals shall not be assigned shift duty in the control room without at least a 12-hour break preceding such an assignment.

Additional information concerning shift manning is discussed in subsection 13.1.2.1.

18.1.4 Immediate Upgrading of Reactor Operator and Senior Reactor Operator Training and Qualifications (I.A.2.1)

]

REQUIREMENT 49 Applicants for Senior Reactor Operator (SRO) license shall have 4 years of responsible power plant experience, of which at least 2 years shall be nuclear power plant experience (including 6 months at specific plant) and no more than 2 years shall be academic or related technical training.

After fuel loading, applicants shall have 1 year of experience as a licensed operator or equivalent.

Certifications that operator license applicants have learned to operate the controls shall be signed by the highest level of corporate management for plant operation.

Applicants must revise training programs to include training in heat transfer, fluid flow, thermodynamics, and plant tran-sients.

RESPONSE

Applicants for a Senior Reactor Operator license at the Grand Gulf Nuclear Station have at least four years of power plant experience.

Prior to initial plant criticality, at least one year of this power plant experience shall be nuclear power plant experience.

After initial plant criticality, each tenior licensed operator candidate shall have at least two Amend. 49 7/81

- -