ML20083N800
| ML20083N800 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/31/1983 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 896, TAC-44152, NUDOCS 8302030176 | |
| Download: ML20083N800 (1) | |
Text
TOLEDO
%mm EDISON Docket No. 50-346 (Z"; Cat License No. NPF-3
" ' *' 2'"S "
Serial No. 896 January 31, 1983 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555 i
Dear Mr. Stolz:
In our letter dated March 19,1980 (Serial No. 601) Tole'do Edison responded to staff questions concerning Shift Technical Advisor (STA)
Training at Davis-Besse Nuclear Power Station Unit No. 1.
At that time, the STA training included a qualification manual calling for system checkoffs to be obtained from licensed instructors or operators.
l In the ensuing years, the duties of licensed personnel, both operators i
and training instructors, have become more demanding and the experience l
l level of the current STA's has grown. The experience level and abilities I
of the current STA staff are now quite appropriate to provide system I
checkoffs required for STA training qualifications. The focus of an STA l
administered checkoff is also more appropriate for reviewing the duties j
and knowledge of STA's in-training.
In light of the above circumstances, Toledo Edison has deleted the requirement for operator administered checkoffs and replaced it with one calling for STA administered checkoffs.
Very truly yours,
[
o0\\
RPC:RFP:lah cc: DB-1 NRC Resident Inspector 8302030176 830131 PDR ADOCK 05000346 P
PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43S52