Forwards TS Change Requests 252 Re Removal of Chemical Addition Sys Requirements from TS to COLR
ML20083N774
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/17/1995
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083N776 List:
References
C311-95-2225, NUDOCS 9505230299
Download: ML20083N774 (2)


Text

..

's N @ Ig g GPU Nuclear Corporation Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0460 i (717)944 7621 l Writer's Direct Dial Number:

(717) 948-8005 May 17, 1995 C311-95-2225 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1)

Operating License No. DPR-50  ;

Docket No. 50-289 Technical Specification Change Request No. 252 Removal of Chemical Addition System Requirements from Technical Specifications to the Core Operating Limits Report In accordance with 10 CFR 50.4(b)(1), enclosed is Technical Specification Change Request (TCSR) No. 252.

t Also enclosed is a Certificate of Service for this request certifying service to ine chief executives of the township and county in which the facility is located, as well as the designated official of the Commonwealth of Pennsylvania, Bureau of Radiation Protection.

The purpose of this TSCR is to request relocation of the volome and bomn concentration requirements for the chemical addition system boric acid mix tank and reclaimed boric acid storage tank to the existing TMI-1 Core Operating Limits Repon (COLR). The proposed change is consistent with the intent of NRC Generic Ietter 88-16 guidance with regard to placing cycle-dependent parameters into the COLR. The proposed change is also consistent with the intent of the Standard Technical Specifications for Babcock and Wilcox Plants, NUREG-1430, July 1992, since chemical addition tank volume and boron concentration parameters are not specified in these Standard Technical Specifications.  ;

It is requested that the amendment authorizing this change be issued to support TMI-l Cycle l 11 stanup (September 1995) in order to preclude the need for a technical specification change .

request to revise these specific parameters as a result of the Cycle 11 core reload evaluation.

9505230299 950517 \

PDR ADOCK 05000289 %g\

P PDR GPU Nuclear Corporation is a subsidiary of General Public Utihties Corporation

l

.' C311-95-2225 Page 2 l

l Pursuant to 10 CFR 50.91(a)(1), enclosed is our analysis, applying the standards in 10 CFR 50.92 to make a determination of no significant hazards considerations.

Sincerely,  !

WW^ -

~

l T. G. Broughhon l Vice President and Director, TMI I DJD/ pip

Enclosures:

(1) Technical Specification Change Request No. 252 j i

(2) Certificate of Service for Technical Specification Change Request No. 252 I

cc: Administrator, Region I 4 TMI Senior Resident Inspector TMI-l Senior Project Manager l