ML20083N597
| ML20083N597 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/28/1995 |
| From: | Olsen H BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20083M787 | List: |
| References | |
| NUDOCS 9505230174 | |
| Download: ML20083N597 (2) | |
Text
T^ >
=
REVISED COPY COO *************************************************************************
UNIT 1 OPERATING DATA REPORT coce************************************************************************
Docket No. 50-317 March 15, 1995-Prepared by Herman O.
Olsen Telephone:(410)260-6734 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1 l
2.
REPORTING PERIOD FEBRUARY 1995
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative-This month to-Date to Date i
- 11. HOURS IN REPORTING PERIOD 672 1,416 173,677
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 124,296.7 l
- 13. REACTOR RESERVE SHUTDOhN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 121,652.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,810,248 3,815,621 308,983,514
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 605,414 1,276,249 102,646,865
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 581,713 1,226,077 97,720,345
- 19. UNIT SERVICE FACTOR 100.0 100.0 70.0
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 70.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.7 103.7 68.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.4 102.5 66.6
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 8.7
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A I
i I
950523 0 0 0 17 PDR A
PDR R
REVISED COPY co**************************************************************************
UNIT 2 OPERATING DATA REPORT co**************************************************************************
Docket No. 50-318 March 15, 1995 Prepared by Herman O.
Olsen Telephone:(410)260-6734 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD FEBRUARY 1995 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year-Cumulative This month to-Date to Date j
- 11. HOURS IN REPORTING PERIOD 672 1,416 157,032
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,305.1 115,342.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 672.0 1,293.0 113,743.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,784,038 3,431,820 290,928,749
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 598,143 1,150,192 96,165,501
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 574,568 1,101,221 91,922,831
- 19. UNIT SERVICE FACTOR 100.0 91.3 72.4
- 20. UNIT AVAILABILITY FACTOR 100.0 91.3 72.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.8 92.6 70.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.2 92.0 69.3
- 23. UNIT FORCED OUTAGE RATE 0.0 8.7 5.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP: