Forwards Proposed Revs to Plant Physical Security Plan & Safeguards Contingency Plan in Support of Issuance of Exemption from Certain Requirements of 10CFR73.55,as Requested in Util .Encl Withheld Per 10CFR73.21
ML20083M304
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/12/1995
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-95047, TAC-M90560, NUDOCS 9505190199
Download: ML20083M304 (2)


Text

,

      • SAFEGUARDS INFORMATION ***

[

WHEN SEPARATED FROM ENCLOSURES, w...

HANDLE THIS DOCUMENT AS DECONTROLLED North North Atlantic Energy Service Corporation no. 3,,300 Atlantic Seabrook, NII O3874 l

(603) 474 9521 Fa,(603) 474-2987 The Northeast Utilities System Ted C. Feigenbaum NY.N. 95047 senior Vice President 6.

Chief Nuclear of6cer May 12,1995 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Document Control Desk

References:

(a)

Facility Operating License No. NPF-86, Docket No. 50-443 (b)

North Atlantic Letter NYN 94120 dated October 17,1994, " Request for Exemption from Certain Requirements of 10CFR73.55, ' Requirements for Physical Protection of Licensed Activities in Nuclear Power Plant Reactors Against Radiological Sabotage' (TAC No. M90560)", T. C. Feigenbaum to USNRC (c)

North Atlantic l.etter NYN 95015 dated February 13,1995. " Response to Requests for Additional Infonnation" T. C. Feigenbaum to IJSNRC (d)

North Atlantic Letter NYN 95036 dated April 26,1995 " Submittal of Proposed Changes to the Seabrook Station Physical Security Plan and Safeguards Contingency Plan (TAC No. M90560)", T. C. Feigenbaum to USNRC

Subject:

Submittal of Proposed Changes to the Seabrook Station Physical Security Plan and Safeguards Contingency Plan (TAC No. M90560)

Gentlemen:

North Atlantic Energy Service Corporation (North Atlantic) provides in the enclosure proposed revisions to the Seabreok Station Physical Security Plan and Safeguards Contingency Plan in support of the issuance of the exemption from certain requirements of 10CFR73.55 as requested in Reference (b).

lhe exemption is required to allow North Atlantic to implement the biometrics access control system, which will eliminate the need to issue and retrieve badges at the protected area entrance and exit locations and will allow all individuals, including North Atlantic employees, contractors, NRC employees and othcrs, with unescorted access, to retain their badges when departing the protected area. The proposed j

changes to the Physical Security Plan and the Safeguards Contingency Plan fully address questions raised by the NRC StafT in their review of the exemption request and the draft plan changes [ References (b), (c) and (d)].

9505190199 950512 PDR. ADOCK 05000443 9

F PDR i

p

      • SAFEGUARDS INFORMATION ***

/

rs,,

  • v V b, l. I; WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED
      • SAFEGUARDS INFORMATION ***

W11EN SEPARATED FROM ENCLOSURES, HANDLE Tills DOCUMENT AS DECONTROLLED 1

United States Nuclear Regulatory Commission May 12,1995 j

Attention:

Document Control Desk Page two Upon issuance of the requested exemption, North Atlantic will begin a test of the biometrics access control system addressing both entrance and exit from the protected area. During this test period aspects of the revised Physical Security Plan and Safeguards Contingency Plan will be partial ly implemented for testing purposes, however, the badges will still be collected and retained by Security personnel. At the conclusion of the test period, which is estimated to be four weeks, the revised Physical Security Plan and Safeguards Contingency Plan will become fully effective when the biometrics access control system is fully relied upon to control access to the protected area. North Atlantic will provide the NRC with notification of the date of conversion and implementation of the revised plans.

The enclosure to this letter contains safeguards information and should be withheld from public disclosure in accordance with 10CFR73.21. This cover letter does not contain safeguards information and reverts to unclassified when separated from the enclosure.

Should you have any questions regarding the exemption request or the enclosed material please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 474 9521 rex en 3772.

Very trt y yours, dCV dr Ted C. Feigenbau cc with enclosure:

Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate 14 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 cc without enclosure:

Mr. Thomas T. Martin Regional Administrator U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. John B. Macdonald NRC Senior Resident inspector P.O. Box 1149 Seabrook, Nil 03874

      • SAFEGUARDS INFORMATION ***

WHEN SEPARATED FROM ENCLOSURES, liANDLE T111S DOCUMENT AS DECONTROLLED

-