ML20083L272

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1995 for Waterford 3
ML20083L272
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/30/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0081, W3F1-95-81, NUDOCS 9505180242
Download: ML20083L272 (7)


Text

7., -

y W...,

Entergy Operations,Inc.

g y

K$orn LA 700C6 Tel 504 739 6774 R. F. Burski Dwec>or huchar Safv/

hre%d 3 W3F1-95-0081 A4.05 PR May 12, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of April, 1995.

This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours,

.l p R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:

L.J. Callan (NRC Region IV)

C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office

/p, 9505190242 950430 PDR ADOCK 05000392 R

PDR

c l

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for April,1995 The unit operated at an average reactor power level of 99.95% and experienced no shutdowns or significant power reductions during the period.

I 4

SMS Page : I of 6

PRESSURIZER SAFETY VALVE FAILURES AND CIIALLENGES WATERFORD3 for April,1995 There were no pressurizer safety valve failures or challenges experienced during the month.

i I

i I

e.

OPERATING DATA REPORT DOCKET NUMBER :

50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : May 9,1995 COMPLETED BY :

D. S. Freeman TELEPHONE : (504) 464-3352 OPERATING STATUS

1. Reporting Period :

April,1995 Gross Hours in Reporting Period :

719

2. Currently Authorized Power Level (MWt) :

3,390 Maximum Dependable Capacity (Net MWe) :

1,075 Design Electrical Rating (Net MWe) :

1,104

3. Power Level to which Restricted (if any) (Net MWe) :

N/A

4. Reason for Restriction (if any) :

N/A THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 719.0 2,879.0 71,601.8
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 719.0 2,879.0 70,723.3
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,436,285 9,744,560 234,074,169
10. Gross Electrical Energy Generated (MWH) 815,640 3,255,420 77,989,880
11. Net Electrical energy Generated (MWH) 782,510 3.123,038 74,365,404
12. Reactor Service Factor 100.0 100.0 85.1
13. Reactor Availability Factor 100.0 100.0 85.1
14. Unit Service Factor 100.0 100.0 84.1
15. Unit Availability Factor 100.0 100.0 84.1
16. Unit Capacity Factor (using MDC) 101.2 100.9 82.2
17. Unit Capacity Factor (Using DER) 98.6 98.3 80.0
18. Unit Forced Outage Rate 0.0 0.0 3.0 m

r a a.

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : May 9,1995 COMPLETED BY :

D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

REFUEL - September 8,1995 - 60 Days

20. If Shutdown at end of report period, estimated date of startup: N/A
21. Unit in Commercial Operation TIIIS YEAR TO MONTII DATE CUMULATIVE
22. Hours in Reporting Period 719 2,879 84,144
23. Unit Forced Outage Ilours 0.0 0.0 2,210.2 3 24. Nameplate Rating (Gross MWe) :

1,200 Max. Dependable Capacity (Gross MWe) :

1,120

25. If changes occur in capacity ratings (I: ems 2 and 24) since the last. p <,

give the reasons :

N/A M91 Page: 4 of 4 l

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :

50-382 UNIT NAME :

WATERFORD 3 DATE OF REPORT :

May 9,1995 COMPLETED BY :

D. S. Freeman TELEPHONE : (504) 464-3352 Reporting Period :

April,1995

( NET MWe)

DAY Avg. Power Level DAY Avg. Power Level 1

1,092 16 1,089 2

1,091 17 1,086

~

3 1,091 18 1,085 4

1,087 19 1,081 5

1,088 20 1,081

~

6 1,088 21 1,084

~

7 1,089 22 1,085 8

1,090 23 1,086 9

1,090 24 1,089 10 1,090 25 1,091 11 1,089 26 1,090 12 1,089 27 1,091 13 1,090 28 1,090 14 1,090 29 1,090 15 1,089 30 1,091 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

5995 Page: 5 of 6

s

.j, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCTdiT NUMBER :

50-382 UNIT NAME : WATERFORD 3

,1 DATE OF REPORT :

May 9,1995 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 464-3352 REPORTING PERIOD :

April,1995 Date Duration

    • Shutdown Cause, Comments and Number (yymmdd)

Type (Hours)

Reason Method Corrective Actions NONE l

A AA TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Meantenance or Test j

C - Refueling D - Regulatory Restriction E - Operator Training and aaa M ETIIOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

S995 Page: 6 of 6