- _ _ _ _ _ _ _ - -
s,.
t GPU Nuclear Corporation Nuclear
- , ors :,v8o e
Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
March 28, 1984 5211-84-2079 Mr. R. C. Ilaynes Region I, Regional Administrator U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA. 19406 l
Dear Mr. Ilaynes:
Three Mile Island Nuclear Station, Unit I, (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 IE Bulletin 83-07 This letter is in response to your letter of July 22, 1983 forwarding IE Bulletin 83-07 concerning apparently fraudulent products sold by Ray Miller, Inc.
This letter is being submitted 3 days late as discussed with R. Conte.
Sincerely,
- 1. D. Hu ill, Director, TMI-1 HDll: RAS:mle Enclosures cc:
R. Conte l
l l
l Sworn and Subscribed,to Lefore me this y h _ day of
~y.m 1984.
l f
%.e., p 4 w_{
w nr.s Mm ww muc OD0lf D Aa UkO. CAUFFW COUNTY uv cowers txPats acu p. ass 8404170096 840328 wen Pe,mbana Aacu nn of Nmys PDR ADOCK 05000289 G
PDR 0
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation h
1p I
RESPONSE TO lE BULLETIN 83-07 1.
CPUN has contacted, via certified letter, those companies listed in the fraudulcat data file of IE Bulletin 83-07 which may have supplied suspect Ray Miller, Inc., materials to TMI-1.
Of these inquiries, only one company, RECO Industries, Inc., has identified itself as having supplied Ray Miller material, to TMI-1.
This material was supplied through Babcock and Wilcox Company, and purchased under purchase order B&W P.O. 81259LT.
A list of companies contacted is enclosed as Attachment 3.
Responses from companies contacted by GPUN are maintained onsite.
CPUN has identified by its own initiative three (3) purchase orders for material procured directly from Ray Miller, Inc.
This material was purchased under Metropolitan Edison Company purchase orders:
P.O. 32765, P.O. 44816, and P.O.
17247.
2.
For Material purchased under B&W P.O. 81259LT end-use has been identified.
A description and evaluation of material used in safety related systems is enclosed as Attachment 1.
Of material purchased directly, only P.O. 17247 was ordered for use in safety related systems.
A description and evaluation of this material is enclosed as Attachment 2.
3.
As stated in response to. Item 2 above, end-use of material purchased under l
P.O. 17247, designated for use in safety-related systems, could not be dete rmined.
This. material was specifically ordered as spare. tubing. Quality Control designation precludes use of non-qualified material in safety-related systems.
However, Q.C. designated material, such as that purchased under P.O. 17247, may be used in systems which are not safety-related. 'In any event, the ' worst case' analysis performed in Attachment 2 concludes that safety or pressure integrity _is not adversely affected.
M'aterial purchased under P.O. 32756 and P.O. 44816 was designated as non-QC and would not have been used in safety-related systems.
1 t'
-+
6-s
l L
ATTACHMENT 1 Purchase Order No:
81259.LT Item:
Make-Up Tank Item No:
5 B&W Drawing:
75 235A RECO Job No:
L8802 Shipped To:
Three Mile Island Description of lbterial:
Service Description Nozzle D Pressure 1" S.W. Half Cpig 2000# -T-304 Nozzle E Vent 1" S.W. Half Cpig 2000# T-304 Nozzle F Sample 1" S.W. Half Cpig 2000# T-304 Nozzle C Level 1" S.W. Half Cpig 2000# T-304 Nozzle J Gas Inlet 1" S.W. Half Cpig 2000# T-304 Nozzle H Temp 3/4" Thd Cpig 2000#
T-304 Nozzle C Relief 1" 150# WNF Sch 80 T-304, HT #HE934 Nozzle C Relief 1" Sch 80 Smls Pipe T304, HT #E15022 Nozzle B Inlet 4" Sch 40 Smls Pipe T304, HT #E14742 Nozzle'K Outlet 4" Sch 40 Smls Pipe T304,.HT E#14742 The material supplied for the make-up tank nozzles was specified to.be Type 304, austenic stainless steel.
Extra low carbon content was not specified and while the use of seamless pipe for these nozzles may be preferred'the. low pressure and temperature conditions indicate that the potential substitution of, welded and drawn pipe should not present a significant safety hazard. Additionally,i this material was not supplied during the time-frame in which.NRC_ identified fraudulent practices took place.
fl_ange The design pressure of the TMI-1 Make-Up. Tank is 100 psig at 200 F.
Assuming that the 1" - 150# welding neck flange was madefof "L" grade' stainless steel in lieu of the.specified straight 304 grads.3, (the most. plausible. postulated fraudulent action'by Ray Miller Inc.on this item) the pressure rating for the flange at 200 F
-is 195 psig, much greater than the: required-100 psig.
- Couplings The couplings and half couplings' supplied are Ladish'2000#irated. : Ray Miller, Inc.
was accused of fraudulently certifying low rated pipe plugs as high pressure items.
No evidence of fraud involving couplings is. referenced: furthermore, these-
. couplings'are dimensionally identical to 3000# ratings per ANSI-B16.11.
la___
0 L
ATTACHMENT 1 (CONT.)
l l
I Pipe Nozzles The required pipe material is ASTM-A312 TP 304 seamless.
Ray Miller, Inc., was accused of fraudulently certifying welded pipe as seamless pipe. By inspection of the ASME Section III Appendices for Class 2 pipings, the allowable stress values for ASTM-A312 Gr. 304 is identical for both seamless or welded pipe.
Therefore, even if welded pipe was supplied as opposed to the required seamless pipe, there is no impact on safety or pressure integrity.
Based on the above, it is concluded that the fraudulent practices of Ray Miller have no impact on safety or pressure integrity in the case of the TMI-1 Make-Up Tank.
e ATTACIIMENT 2 Purchase Order No. 17247 Material purchased was specified as spare stainless steel tubing for use in N2 and N3 QC systems.
This material was purchased from Ray Miller, Inc., W.
Cladwell, New Jersey, not the Charleston, West Virginia office where fraudulent practices, identified in the subject Bulletin, took place.
This material was QC receipt inspected at TMI-l on 9-15-75 and associated traceable chemical and physical mill test reports approved on 10-14-75.
During the time period in question end-uses of material were not identified on stores issuance records.
Therefore the material was evaluated for worst service conditions.
Description of Material Tubing -1/4" 0.D. x.049 wall, A-213 TF 304 Seamless Tubing -3/8" 0.D. x.065 wall, A-213 TP 304 Seamless a
Tubing - 1/2" 0.D. x.083 wall, A-213 TP 304 Seamless The tubing in question was assumed for installation in TMI-1 systems where gressures and temperatures are highest, (i.e.; Pressure = 2500 psi, temperature - 670 F).
Engineering computations for pressure integrity indicates that the tubing supplied is adequate for the above' mentioned service conditions, even if "L" grade and welded stainless tubing was supplied. Therefore, it is concluded that the fraudulent practices by Ray Miller, Inc. have no impact on safety or pressure integrity in the case of TMI-1 Pressure Systems.
Attacra:Jant 3 COMPANIES LISTED IN IE BULLETIN E3-07 HHICH HAVE SUPPLIED e'
MATERIALS OR SERVICES TO TMI-1 ABBE, PAUL 0.
- CAPITAL PLH SUPPLY 139 CENTER AVENUE 1900 SOUTH STH STREET LEFALLS, NJ 07424 SPRINGFIELD, IL 62703 AIR PREHEATER CO.
CHEM FLOW INC.
PLANT #5 707 LYNDON AVENUE WELLSVILLE, NY 14895 ROSEMONT, IL 60018
- AIR PRODUCTS AND CHEMICALS
- CHEMETRON CORP.
2500 YANKEE ROAD PIGMENTS DIV., P.O. BOX 2166 MIDDLETON, OH 45042 HUNTINGTON, NV 25722 AMCHEM PRODUCTS INC.
CINCINNATI FASTENERS CO.
AMBLER, PA 15002 16 E. 73RD STREET CINCINNATI, OH 45216 ANCHOR PRECISION PRODUCTS, INC 26 ESSEX STREET CRANE SUPPLY CO.
HACKENSACK, NJ 07601 207 S. CENTRAL AVENUE LIMA, OH 4E802 AQUA CHEMICAL INC.
240 W. CAPITOL DRIVE DOLLINGER CORP.
MILHAUKEE, WI 53212 1 TOWNLINE CIRCLE ROCHESTER, NY 14603
- ARGO WELDED PRODUCTS ALPHA INDUSTRIAL PARK DRAVO CORP.
PHILLIPSBURG, NJ 08865 P. O. BOX 488 BELPRE, OH 45714 BABCOCK AND WILCOX CO.
609 WARREN AVENUE DRAVO CORP.
APOLLO, PA 15613 P.O. BOX 1669 LIMA, OH 45802 BAKER, J. T. CHEMICALS CO.
600 NORTH BROAD STREET DRESSER INDUSTRIES, IN.C PHILLIPSBURG, NJ 08865..
N. BTH STREET OLEAN, NY 14760 BENDIX CORP.
U.S. 219 N EMERSON ELECTRIC CO.
LEWISBURG, WV 25901 BROOKS INSTRUMENT DIV.
HATFIELO, PA 19440 BETHLEHEM STEEL CORP.
JOHNSTOWN, PA 15907 GENERAL ELECTRIC CO.
5338 WEST 16TH STREET BRIGHTON CORP.
CICERO,- IL 60650-11861 MOSTELLER ROAD CINCINNATI, OH 45241 GENERAL ELECTRIC CO.
6071 ST. ANDREWS ROAD' BUFFALO TANK COLUMBIA, SC 29210 5349 HIGHWAY AVENUE JACKSONVILLE, FL 32205
- No Response Received
COMPANTES LISTED IN IE BULLETIN.83-07 HHICH~HAVE SUPPLIED
~
MATERIALS OR SERVICES TO THI-1 i
i GENERAL ELECTRIC ~CO.
NATIONAL PIPE BENDING
~
HNY 69 HEST - CONST. GATE #A 110 RIVER STREET HT. VERNON, IN 47620 NEW HAVEN, CT 06573 GO'JLD,' INC.
NAZARETH STEEL FABRICATORS FLORAL DIV., OHIO ST. RTE 60 539 S. MAIN STREET MCCONNELLSVILLE, OH 43956 NAZARETH, PA 18064 GTE SYLVANIA OHIO PIPE & SUPPLY CO., INC.
TOWANDA, PA 18848 14615 LORAIN AVENUE CLEVELAND, OH 44111 GULF & HESTERN ENERGY PRODUCTS READING ROAD PARAMUS METAL FABRICATORS NORTH BRANCH, NJ 08876 ROUTE 11, OFF ROUTE 4 PARAMUS, NJ 07652
- HAJOCA CORP.
515 EAST 11TH STREET PEC - ATTN:
D. A. CARLSON CHATTANOOGA, TN 37403 HARREN C. T. STATION WARREN, PA 16365 HAJOCA CORP.
BOX 147 PER HUTIT KINGSPORT, TN 37662 1915 OLD PHILADELPHIA PIKE LANCASTER, PA 17604
? -
HUNTINGTON ALLOYS, INC.
RIVERSIDE DRIVE PERSINGERS INC.
HUNTINGTON, WV 25720 P.O. BOX 1866 - ELIZABETH ST.
CHARLESTON, WV 25327 JOY MANUFACTURING COMPANY 3101 BROADWAY PITTSBURGH - DES MOINES STEEL BUFFALO, NY 14225 1420 LEXINGTON AVENUE WARREN, PA 16365 KEYSTONE TUBULAR SERV. CORP.
BOX 992 PULLMAN SHEET METAL BUTLER, PA 16001 1400 EAST 97TH PLACE CHICAGO, IL 60628 LESLIE & ELLIOT EAST RAILWAY & IOWA AVENUE RARITAN SUPPLY CO.
PATTERSON, NJ 07503 MEADOW ROAD EDISON, NJ 0881 LESLIE & ELLIOT CO.
GRANITE & HEST STREET RECO MIDLAND PARK, NJ BOX 25189 RICHMOND, VA 23260
-MIDC0 PIPE & TUBE
~
370 FERRY STREET
- SOUTHERN HEAT EXCHANGER MARTINEZ, CA 94553 HIGHWAY 82-SOUTH TUSCALOOSA, AL 35401 MURRAY, A. B.
GREEN LANDE UNION, NJ 07083
- No Response. Received
~_
Attachmant 3 l
COMPANIES LISTED IN IE BULLETIN 83-07 WHICH HAVE SUPPLIED J
MATERIALS OR SERVICES TO THI-l e
t 5
SOUTHWEST STAIHLESS OF GA INC.
NbC S
30071 I
- STAINLESS & ALLOY READING ROAD OFFICE, ROUTE 22 NORTH BRANCH, NJ 08876 STAUFFER CHEMICAL CO.
GALLIOPOLIS FERRY, WV 25515 TURB0 DYNE CORP.
HELLSVILLE, NY 14895
- VULCAN MFG. CO.
P.O. BOX 46465 c
CINCINNATI, OH 45246 VULCAN SUPPLY & METALS CO.
i 535 READING ROAD CINCINNATI, OH 45202 HEIRTON STEEL DIV. NAT'L STEEL CORP.
HEIRTON, WV 26062 HIDES PIPE AND. SUPPLY CO.
1728 JOHN STREET CINCINNATI, OH 45217
- No Response Received
...