I ll VERMONT YANKEE NUCLEAR POWER STATION
' MONTHLY STATISTICAL REPORT 78-12 FOR THE MONTH OF DECEMBER, 1978 e
i k
4.
7 9 0117 0 AK.3
\\
4 y
@w
\\
p
~
OPERATING DATA REPORT i
50-271 DOCKET NO.
i DATE 790112 i
COMPLETED BY R. M. Siogren TELEPHONE (M 7T 166-9011 4
X2281 OPERATING STATUS Notes
- 1. Unit Name:
yERMONT YANKEE
- 2. Reporting Period:
December. 1978
- 3. Licensed Thermal Power (MWt):
1,593 540
- 4. Na:neplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 514 (ooen evele) 540 tclosed cycle) 535
- 6. Maximum Dependable Capauty (Gross MWe):
i
- 7. Maximum Dependable Capacity (Net MWe):
504
- 8. If Changes Oc ur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level,To Which Restricted.If Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr to.Date Cumulative
~
- 11. Hours In Reporting Period 744 8,760 55,034.75
- 12. Number Of Hours Reactor Was Critical 732 6,853.97 43,889.83 0
o co
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 725 6,649 42;097 0
o o
- 15. Unit Reserve Shutdown Hours
)
- 16. Gross Thermal Energy Generated (MWH) 1,112,565.5-10.045.660.0 58,386.803.0
~.
a
- 17. Gross Electrical Energy Generated (MWH) 379,252 3.394,758 19.339.468
- 18. Net Electrical Energy Generated (MWH) 364.182 3.240.697
-18,319.530
- 19. Unit Service Factor 97.4 75.9 76.5 l
- 20. Unit Availability Factor 97.4*
75.9 76.5
- 21. Unit Capacity Factor (Using MDC Net) -
97*1~
73.'4 66.0
- 22. Unit Capacity Factor (Using DER Net) 95.2 71.9 64.7 2.6' 17.6 7.3
- 23. Unic Forced Outage Rate
]
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
NONE c
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
1
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved
- l
,.2 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) i e
y
t l
Q;..
s..
f,.
c
'~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT -Vermont Yankee DATE 790112 COMPLETED BY R. M. Sioeren TELEPHONE (617) 366-9011 X-2281 MONT1!
Dacamher-1978
~
DAY AVERAGE DAILY POWER LEVEL D'AY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
571 37 469 2
524 33 523 3
509 39 q99 4
523.
20 523 5
524 21 521 6
523 22 522 i'.
7 523-23 521 8
523 24 507 9
01 25 369 10 513-26 122 11.
522 27 355 12 523 459 28 29 467 13 974 14
'523 30 413 15 523 33 508 16-523 INSTRUCTIONS On this format.!ist the avenge daily unit power lesel in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(4177)
'\\
_____________.___.____._________m_
j.
(
DOCKET NO.
50-271 UNITSilulDOWNS AND POWER REDUCTIONS UNIT NAM E Vermont Yankee DATE 790112 COMPLE1 ED ilY R. II. Sjoeran REPORT MONTil December.1978 TELLPilONE (6In 166-0011
.h 3
.h liccusee Eg, a'1, Cause & Correceive N. i.
Date g
3g
,3 g oc Event gi n.3 Auinn o -
F gI 5
5gc Repori
- to O gu p,,,,,,g,,,,,,,,,
O e
6 O:'
78-20 781203 S
0 11 4
None N/A N/A II - Turbine Surveillance (Power
!teductii >n) 78-21 7?ll217 S
0 11 4
None N/A N/A 11 - Turbine Surveillance (Power teductli 'n) 78-22 781224
-S 0
11 4
None N/A N/A H - Turbine Surveillance (Power teduction) 78-23 781225 F
19 B
3 None CBA Valve X B - See Operations Summary 78-24 781229 S
0 11 4
'None RAA Conrod H - Control Rod Pattern Adjustment h
(Power teductii.n)
I 2
3 4
I:: Fost ed Heason:
Method:
Exhibit G. Inst ructions S: Stlieduled A-lignipniens Failure (Explain)
- 1. Manual for Picparation of Data ll Mainicnance or Test 7 Manual Scrain.
Enity Shecis for 1.iecusee C Relucling 3.Auturnatic Scrain.
Eveni Hepine (l.liR)1 ile INtillEG.
D Hegulatiny Hestriction 4 Other (limplain) 016l1 li Opciaior leaining & license Exanileiation 1 Adeninisti.iiive' 5
G Opceational I.s sus (limpi.iin)
Eminliii I. Same Souece
(*8/77) 11 Hil cs (limplein),
10CkliT NO.
50-271 9
UNIT Vermont Yankee DATE 790112 COMPLETED liY R. H. Singren TELEPil0NE (617) 366-9011 X2281 SAFETY I! ELATED MAINTENANCE NATUllE OF LER OR OLITAGE HALFUNCTION EQtill'!!ENT MAINTENANCE NUM11ER CAUSE RESULT CollRECTIVE ACTION
. RWCU Regen. Heat Corrective NA Failed gasket Flange leakage Replaced gasket Exchanger Relief Valve HR 78-1194 RWCU Regen. Heat Corrective NA Failed gasket Flange leakage' Repaired Exchanger HR 78-1206 "A" Air Ejector Off Cas Corrective LER 78-34 Failed components Erratic Indicatior Replaced with spare unit Monitor HR 78-1236 Torus water level in-Corrective LER 78-35 Loss of Reference Incorrect Icvel Established reference leg struments HR 78-1249 Leg Water Level indication water level i
1 e
t 4
. 9. -
s i
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 790112 COMPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT NONTH December, 1978 1
SU:4!ARY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 93.9% of rated thermal power for the month of December, 1978. Gross electrical generation for the month was 379,252 MWHe, or 94.4% of design electrical capacity.
Operations' Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:.
~
12-1 At the beginning of this report period, the plant was operating at 99% of rated thermal power..
12-3 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> power was re.duced to 75% for. turbine surveillance.-
A return to full power'was initiated at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.
12-17 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> power was reduced to 77% for turbine' surveillance.
l A return to full power was initiated at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.
~
12-24 At 05d0 h'ours power was reduced to.78% for turbine surveillance.
A return to full power was initiated at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.'
12-25 At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> a reactor scram occurred.. A control room' operator was in the process of performing a routine MSIV ' exercise.
The valve test pushbutton was depressed for a marginally.long
~
period of time, and as a result, MSIV 80A began to restrict
(
steam flow in the "A" steam line.. The-reactor simultaneously.
isolatti due to high steam flow in the other lines and a full reactor scram occurred. A return to full power was initiated at 0512 on 12-26.
Phased ~to grid at'12:32 on 12-26.
i 12-29 At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> power was reduced to 65% to effect a Rod Pattern Adj ustment. A ' return-to full power was initiated at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />.
1 1
12-31 At the conclusion of this report period, the plant was operating at 99% of rated thermal power.
N
-