Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARTXX-9914, Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed1999-06-16016 June 1999 Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed ML20206E7271999-04-29029 April 1999 Submits Original & Four Complete Copies of Application for Renewal of Permit to Discharge,Deposit or Dispose of Wastes Into or Adjacent to Water in State. with Three Oversize Drawings ML20045D3451992-06-16016 June 1992 Discusses Util Review of 920603 Ltr Outlining Thermal Science,Inc Field Surveillance of Application of Thermo-Lag 330 Fire Barrier Sys on Util Test Assemblies at Omega Poing Labs.Supporting Documentation Encl ML20091Q2891992-01-27027 January 1992 Forwards Rev 7 to Quarterly Plant Performance & Other Indicator Data for Fourth Quarter of 1991 & Gross Heat Rate Data Form for 1991 ML20070T7651991-04-0101 April 1991 Forwards 910327 License Amend Request 91-001 Re Addition of Spec 3/4.7.12 & Bases 3/4.7.12 for Safety Chilled Water Sys ML20073D1051991-03-29029 March 1991 Comments on Final Rept Addressing Scaling for Unit 1,dtd Feb 1991 Per Insp Repts 50-445/90-47 & 50-446/90-47.Concerns Raised That Util Selected Criterion XI Re Test Control as Sole Mgt Std to Control safety-related Activities ML20066A5711990-12-19019 December 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15,authored by Ebasco ML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 1999-06-16
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 ML20216D1721987-06-20020 June 1987 Ack Receipt of .Clarifies Agreement Made During Telcon Re Date for Case to File Initial Supplementary Responses Deferred Until 870706.Necessary Discovery & Response Should Be Completed Also.Related Correspondence ML20215D7141987-06-0303 June 1987 Informs All Concerned W/Facility Independent Assessment Program of Address Correction ML20214S0641987-05-26026 May 1987 Ack Receipt of Applicant 870518 Fifth Progress Rept.Requests That Recipient Notify of When Substantive Matls Will Be Made Available So Case May Decide on Course of Action Re Comanche Peak Response Team Adequacy Issues.Related Correspondence ML20234C6731987-05-0101 May 1987 Forwards Communications Repts Associated W/Cygna Audits of S&W Civil/Structural Action Plan Re Plant Independent Assessment Program - Phase 4 ML20234C4401987-05-0101 May 1987 Forwards Communication Repts Re Cygna Audits of S&W Piping & Pipe Support Verification Activities,Per Phase 4 of Independent Assessment Program.Submittal Constitutes Communications Rept Transmittal 23 TXX-6361, Forwards Receipt to Ack Part 21 Rept Re Qualification Test Rept F-C5205-3, Nuclear Qualification - Terminal Blocks1987-03-23023 March 1987 Forwards Receipt to Ack Part 21 Rept Re Qualification Test Rept F-C5205-3, Nuclear Qualification - Terminal Blocks ML20205C0741987-03-18018 March 1987 Forwards Comments & Questions on Ebasco & Util Procedures & Criteria Re Responses to Conduit Support Review Issues List for Upcoming 870324 & 25 Conduit Support Meetings Per Rev 0 to Generic Issues Rept 1990-08-21
[Table view] |
Text
. .
Subject:
Comanche Peak Steam Electric Station independent Assessment Program -
Response to CASE Ouestions
Reference:
(1) Brief Summary of Generic Problems from CASE Witness Jack Doyle, 2/22/84.
(2) Brief Summary of Cfoss-examination Questions from CASE Witness Mark Walsh,2/22/84.
Dear Mrs. Ellis:
Enclosed please find our responses to reference (1) items 2 and 8.
Further responses will be forthcoming.
Very truly yours, t o kGo Noncy H. Williams Project Monoger NHW:eam
Enclosures:
Attoch'ment A, Partial Responses to CASE Questions cc: See ottochment 8404160012 840314-
'{DRADOCK 05000445 .PDR I
. San Francisco Boston Chicago Richland
=-
$4WKf5 Mrs. J. Ellis March 14,1984 Response to CASE Questions Attachment Nicholas S. Reynolds, Esq. Mr. John T. Collins Bishop, Liberman, Cook, Purcell & Reynolds U.S. NRC, Region IV 1200 Seventeenth Street, N.W. 611 Ryan Plazo Drive Washington, D.C. 20036 Suite 1000 Arlington, Texas 7601i Robert Wooldridge, Esq.
Worsham, Forsythe & Sampels Mr. Lonny Alan Sinkin 2001 Bryan Tower ll4 W. 7th, Suite 220 Dallos, Texas 75201 Austin, Texas 78701 Mr. Homer C. Schmidt B. R. Clements Monoger - Nuclear Services Vice President Nuclear Texas Utilities Generating Company Texas Utilities Generating Company 2001 Bryan Tower Skyway Tower Dollos, Texas 75201 400 North Olive Street L.B. 81 Mr. H. R. Rock Dallas. Texas 75201 Gibbs & Hill, Inc.
393 Seventh Avenue Peter B Bloch, Esq.
New York, New York 10001 Chairman, Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mr. A. T. Parker 4350 East / West Highway,4th Floor Westinghouse Electric Corporation Washington, D.C. 20814 P.O. Box 355 Pittsburgh, Pennsylvania 15230 Dr. Walter H. Jordan 881 W. Outer Drive Renea Hicks Ook Ridge, Tennessee 37830 Assistant Attorney General Environmental Protection Division Dr. Kenneth A. McCollom P.O. Box 12548, Capitol Station Dean, Division of Engineering Architecture and Austin, Texas 78711 Technology Oklahoma State University Mr. James E. Cummins Stillwater, Oklahoma 74074
. Resident inspector / Comanche Peak Nuclear Power Station Stuart A. Treby, Esq.
c/o U.S. Nuclear Regulatory Commission Office of the Executive Legal Director P.O. Box 38 U.S. Nuclear Regulatory Commission Glen Rose, Texas 76043 Washington, D.C. 20555 3MES.IBurwellt Mr. J. B. George Licerising Pr'oject Manager Texas Utilities Generating Company U.S. Nuclear Regulatory Commission Comanche Peck Steam Electric Station 7920 Norfolk Avenue Highway FM 201 Bethesda,' Maryland 20014 Glen Rose, Texas 76043 Mr. H. Schmidt - Mr. David H. Wade e/o Westinghouse Texas Utilities Generating Company 4901 Fairmont Avenue 2001 Bryan Tower Bethesda, Maryland 20814 Dallas, Texas 75201 Mr. David R. Pigott Orrick, Herrington, & Sutcliffe 600 Montgomery Street Son Francisco, California 9411I
Comanche Peak ASLB Hearings Response to CASE Questions Question No.: Doyle (2 Exhibit No.: 897 1.0 CASE Ouestion Local ef fects on tube walls:
o Punching shear o Effect on welds o Resultant effect due to wall flexibility on moment at tube weld 2.0 Cygna Interpretation When tube sections are employed in the design of pipe supports, how were the following local effects considered:
- a. Punching shear?
- b. Effect on welds?
- c. Resultant effect due to wall flexibility on moment at tube weld?
3.0 Response Consider pipe support RH-l-062-002-S22R (CASE Exhibit 897). It is designed using a tube section, TS 4" x 6" x l/2", welded to a baseplate at one end and to a strut clevis at the other end. Punching shear and welding stresses are discussed below:
- a. Punching shear stresses are within allowable for all supports reviewed by Cygno.
This is evidenced by the punching shear check provided in Enclosure D2-1.
Adequacy can also be determined by inspection through a simple comparison betwen the weldment shear stress and the punching shear stress in the flange, as illustrated below:
Based on force equilibrium, tc = (Fx* .707* t,)/(.4* Fy)
~
.111llll111111111111!I1ll1lllll I
Comanche Peak ASLB Hearings Response to CASE Questions Question No.: Doyle //2 Exhibit No.: 897 where te = tube wall thickness, inches F=s 11 w ble weld shear stress, ksi(use 18 ksi) t, = fillet weld leg size, inches Fy= allowable tube shear stress, ksi(use 31 ksi) substituting, tc = (18* .707* t,)/(.4* 3I) = 1.0 t, Therefore, if the fillet weld' leg is equal to the tube thickness, punchout shear stresses will be satisfactory. For support RH-l-064-S22R, the tube thickness (1/2")
is twice the attached fillet weld (1/4").
- b. Each welded connection in support RH-l-064-01 l-S22R is discussed below:
Tube to-Baseplate This connection is a standard beam-to-column detail, as evidenced by the AISC Manual, Part 4. Furthermore, the flore-bevel weld detail has been properly evaluated and sized by the designer.
Tube-to-Clevis Attaching the strut clevis to the tube flange introduces no adverse effects into the connecting fillet weld,
- c. Flexibil;ty of the tube flange produces no significant additional loads on the weld due to diaphrogm action. This welded connection compares favorably with certain standard weldments shown in Blodgett's Design of Welded Structures (see Enclosures D2-1 and D2-2). The connections shown in these enclosures are more
" flexible" than the tube-to-clevis detail in support RH-l-064-S22R, and are not evaluated for added weld stresses due to diaphragm action.
ENCLOSURE D2-1 Punching shear check for Support No. RH-1-062-002-S22R.
Reference:
American Welding Society (AWS), D1.1, Section 10.5.
j ube T
.____________ 3
~
$ h Attachment 3n ; t 6
t I If R
-t I i
p_-_--__ - _ 4 y_
s - 1/4 1 1/2 -
FIGURE D2-1 Applied axial load = 5092 lbs.
Since the attachment is not a tube and only welded on the 3" side, the calculation of F, in the following equation for Acting Vp (AWS Section 10.5.1) will be conservatively high, because the loads shared by the 1-1/2" sides of the tube are being neglected.
f sin e f Acting V p =T (a K ,
b
)
a
- 1..
r ENCLOSURE D2-1 (continued) where f, = 5092/(3+3) tb = 849/tb fb =0 0 = 90 degrees t = t b/tc 8 = b/D K
a = 1.0 Acting V p = 1698 Basic V p = Fy /(0.6y) where y = D/2t c
= 31350/(0.6)(6) = 6/2(1/2) = 6 U = (f a + I b)/0.6 Fy (see Note 1, Table 10.5.1) f a = 849/tb = 849/(1/4) = 3395 psi (Note: f ais conservatively calculated using tb of 1/4", i.e., the weld size).
U = (3395 + 0)/( 6)(31350) = 0.18 Since U less than 0.44, Qf = 1.0; and, since beta (0.5) is less than 0.6, Qb = 1.0.
Allowable Vp =Q0b f (Basic Yp )
= (1)(1)(8708 psi) = 8708 psi
9 ENCLOSURE D2-1 (continued)
This is considerably greater than the Acting Ap = 1698 psi.
Design margin = 1 = (1698/8708) = .80 = 80%
OK.
Comanche Peak ASLB Hearings Response to CASE Ouestions Question No.: Doyle //8 Exhibit No.: 893 1.0 CASE Ouestion There is no documentation in calculations to support the conclusion that flare welds are stronger than fillet welds--no calculations; therefore, why did Cygna accept this statement?
o Flore weld strength depends on radius of flore (depth).
2.0 Cygno Interpretation Why did Cygna consider flare welds stronger than fillet welds when no calculations were mode?
3.0 Response in the case of a welded beam attachment for S1-1-079-001-S325, flore welds are stronger than a 1/4" fillet weld for two reasons:
- 1) - Minimum effective throat thickness (te) is greater o For flore weld:
te = 5/I6 R = 5/l6 (1-l/4") = 0.39" where R = minimum weld groove radius
= l-l/2 (1/2") + l /2" = l-l /4" o For fillet weld:
t, = 0.707 (!/4") = 0.18" since 0.39" 0.18", a flore weld is considerably superior to a 1/4" fillet weld.
w
Comanche Peak ASLB Hearings Response to CASE Questions Question No.: Doyle /!8 Page 2
- 2) More weld length For the welded beam attachment considered, the weld length is 2" along the square side versus 3" along the beveled side. Consequently the installed flare weld along the bevel will give this support 50% more capacity for the same te .
o- Communications i t4 L n i Repod
- lilli
- . "'""'I company cx Telecon a conference Report CASE Job N Project: Comanche Peak Steam Electric Station 84042 Independent Assessment Program March 6, 1984 T' **
Subject:
ASLB - Clarification of Technical Questions 3:00 p.m.
Place. g ,g Participants '
Juanita Ellis CASE Nancy H. Williams Cygna 4
Required Comments Action By item ,,
I called Mrs. Ellis to clarify some of the questions transmitted to Cygna on 2/22/84 as follows:
- 1.
Reference:
Mr. Doyle's Questions, Item 5 Please explain what is meant by "the inaccurate conclusions."
- 2.
Reference:
Mr. Doyle's Questions, Item 5 What is meant wide / thin ratio? What is the 1:4:1 ratio?
- 3.
Reference:
Mr. Walsh's Questions, Item 4 Is the reference to PI-02 correct since there is no table on this checklist?
of signe /eam Page 3 y f f Distribution- 'See attachme'nt mer.
4 t
y '
Mrs. J. Ellis March 6,1984 Communications Report Attochment Nicholos S. Reynolds, Esq.' Mr. John T. Collins
, Bishop, Liberman, Cook, Purcell & Reynolds U.S. NRC, Region IV 1200 Seventeenth Street, N.W. 611 Ryon Plazo Drive Washington, D.C. 20036 Suite 1000 Arlington, Texas 760II -
Robert Wooldridge, Esq.
Worsham, Forsythe & Sampels Mr. Lonny Alan Sinkin
.2001 Bryan Tower i 14 W. 7th, Suite 220 Dallos, Texas 75201 Austin, Texas 78701 Mr. Homer C. Schmidt B. R. Clements -
Manager - Nuclear Services Vice President Nuclear Texas Utilities Generating Company Texas Utilities Generating Company 2001 Bryan Tower Skyway Tower Dallos, Texas 75201 400 North Olive Street L.B. 81 Mr. H. R. Rock Dallas, Texas 75201 Gibbs & Hill, Inc.
393 Seventh Avenue Peter B. Bloch, Esq.
s New York, New York 10001 Chairman, Atomic Safety and Licensing Board
. . U.S. Nuclear Regulatory Commission i Mr. A. T. Parker : 4350 East / West Highway,4th Floor
- Westinghouse Electric Corporation - Washington, D.C. - 20814 P.O. Box 355 Pittsburgh, Pennsylvania 15230 Dr. Walter H. Jordon -
881 W. Outer Drive
,Reneo Hicks Ook Ridge, Tennessee 37830 Assistant Attorney General Environmental Protection Division Dr. Kenneth A. McCollom .
- P.O. Box 12548, Capitol Station . . Dean, Division of Engineering Architecture and Austin, Texas 78711 Technology Oklahoma State University
- Mr. James E. Cummins Stillwater, Oklahomo 74074 Resident inspector / Comanche Peak Nuclear
. Power Station -
Stuart A. Treby, Esq.
-c/o U.S. Nuclear Regulatory Commission Office of the Executive Legal Director P.O. Box 38 U,5. Nuclear Regulatory Commission
' Glen Rose, Texas 76043 Washington, D.C. 20555
~
. Mrs. S. Burwell ' ' Mr. J. B. George Licensing Project Monoger~ . Texas Utilities Generating _ Company U.S. Nuclear Regulatory Commission Comanche Peak Steam Electric Station 7920 Norfolk Avenue . Highway FM 201 Bethesda, Maryland . 20014 Glen Rose, Texas 76043
.Mr. H. Schmidt - Mr. David H. Wode
c/o Westinghouse Texas Utilities Generating Company--
L4901 Fairmont Avenue . . 2001 Bryan Tower -
. -Bethesda, Maryland . 20814 Dollas,1 Texas 75201 Mr. David R. Pigott -
Orrick, Herrir.aton, & Sutcliffe 600 Montgomery. Street San Francisco, Californio ~ 941'l I
, , . _ . . _ . - _ _ _ - _ _ ,_ _- . 2_ _ _
.. l Communications i i AL% i Report !
'& llllllllllll!lllllllllllllllll Company: a Teiecon a conference neport CASE
"' i"' Comanche Peak Steam Electric Station 84042 Independent Assessment Program March 7, 1984
""' 2:00 p.m.
subject. ASLB - Response to questions on 3/6/84 telecon Place: p
Participants:
Juanita Ellis CASE Nancy H. Williams Cygna Required item Comments Action By I called Mrs. Ellis for CASE's response to the above referenced telephone conversation. She provided the following clarifications:
Reference:
Mr. Doyle's Question, Item 5 Mr. Doyle will be sending some information within the next day which should clarify his question. Mrs. Ellis will express mail this information to Cygna.
Reference:
Mr. Doyle's Question, Item 9, second sentence The wide / thin ratio is the face width of the weld / effective throat. The 1:4:1 ratio was a typographical error. The correct value is 1.4:1.
Reference:
Mr. Walsh's Question, Item 4 The correct reference should be PI-02-03 rather than PI-02.
signe
. /eam " 1 1 Distnbution: See attachment ,
. 1000 01a
. . ,,