Interim Deficiency Rept,Item 91 Re Ite 4,160-volt Breaker Puffer Piston Shaft Possibly Developing Cracks.Initially Reported on 830321.Replacement Shafts Will Be Installed Upon Receipt
ML20083J764
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/22/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 91, EF2-66488, NUDOCS 8401050409
Download: ML20083J764 (2)


Text

1

- Dm8

+ Donald A. Wells ManagerCuaMy A55'Fance (3131 237 9657 2000 Second Avenue b f3$$I3Y$8"" December 22, 1983 EF2-66488 Mr. James' G. Keppler, Regional Administrator Region III U. S. Nuclear Regulatory Commission

-799 Roosevelt Road

. Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on ITE 4160V Breaker Puffer Piston Shaf t (#91)

Dear Mr. Keppler:

This interim report concerning ITE 4160V breaker puffer piston shaf ts problem has been prepared to provide the current status of this item.

This item was originally reported to Mr. H. M. Wescott of MRC Region III by Detroit Edison's Mr. D. Ferencz, Acting Supervisor -

Construction Quality Assurance'on March 21, 1983.

The plastic puffer piston connecting shaf ts on several ITE 4160V circuit breakers have developed cracks. Several breakers have been examined, and one (1) actual failure was observed. The cracking and failure has occurred at the linkage connecting pin on the shaft. The puffer piston provides a gust of air to the main contact area to extinguish the arc during the open cycle.

Detroit Edison is currently awaiting the final shipment of replacement puffer piston connecting shafts. When received on site they will be installed to replace the damaged items. Brown Boveri is continuing their investigation and have indicated a report will be issued soon.

Another report on this item, either interim or final, will be sent when further information is available. If you have questions con-cerning'this matter, please contact Mr. G. M. Trahey, Assistant Director - Project Quality Assurance.

Very truly yours, 1

[

8401050409 831222 gDRADOCK 05000341 PDR gs " o *

.ZsEJ7 \0

Mr. James G. Keppler, Regional Administrator December 22, 1983 EF2-66488 Page 2 cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Paul Byron, Senior Resident Inspector U. S. Nuclear Regulatory Commission 6450 North Dixie flighway Newport, Michigan 48166 1