PRAIRIEISLAND NUCLEAR GENERATING PLANT ge Red Wing, Minnesota i

UNITS 1 AND 2 1

smwei.eout.

sT. e Aut.

"'O.'!!'&.

. INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 SEPTEMBER 27, 1983 THRU SEPTEMBER 29, 1983 c:,

NORTHERN STATES POWER COMPANY MINNEAPOLIS. MINNESOTA Report Date:

Consnercial Service Date:

December 28, 1983 December 16, 1973 1,, [ t [$$l? l',.

c..u

NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 INSERVICE INSP CTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 AUGUST 29, 1983 THRU OCTOBER 1, 1983 INSPECTION PERIOD 3 Report Date:

Prepared by:

L.C. Dahlman December 28, 1983 M & SP Specialist dl

<1' Reviewed by:

C M.T. Anderson ~

M & SP Engineer Commercial Service Date:

' \\\\

December 16, 1973 Approved by:

de P.J. Krusp6p

//

Superintehdent, 7 Materials and Special Processes LCD101283JJB01

Inservice Inspection - Examination Summary PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1

- INDEX -

1.0 INTRODUCTION

2.0

SUMMARY

3.0 DISCUSSION OF EXAMINATION 3.1 Inspection Boundary 3.2 Examination Methods 3.3 Examination Procedures 3.4 Equipment and Materials 3.5 Personnel 3.6 Evaluation 3.7 Examination Reports and Documentation APPENDIX A - ASME Class 2 Examinations Inservice Inspection - Examination Summary Tables Table S2.2.1 - Piping - Circumferential Butt Welds I

Table II - Baseline Comparison Summary Table III - Isometric Drawing Summary l

APPENDIX B -

Table I

- Personnel Listing Table II - Ultrasonic Calibration Blocks Table III - Precedure Listing Table IV - Equipment and Materials APPENDIX C - Form NIS-1, Owner's Data Report for Inservice Inspections i

4 e

LCD101283JJB01 l

INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 September 27, 1983 to September 29, 1983

1.0 INTRODUCTION

~

This report summarizes the inservice inspection examinations per-formed at Prairie Island Nuclear Generating Plant - Unit 1.

This inspection was conducted during the period from September 27 to September 29, 1983 in response to the NRC Staff Evaluation Meeting documented April 18, 1983. Specifically, item 5 of Section 6 states that 10 welds will be examined every six months. The examinations were performed with the Unit in operation. Prairie Island - Unit 1 began commercial operation on December 16, 1973.

The examinations were performed on circumferential pipe welds in portions of the Safety Injection system that were identified as containing stagnant oxygenated borated water, and selection was based on those welds that are considered the most susceptable to trans-granular stress corrosion cracking.

Northern States Power Company contracted Lambert, MacGill, Thomas, Inc. to perform the examinations. Hartford Steam Boiler Inspection and Insurance Company, representing ANI, provided the Authorized Inspection.

2.0 INSPECTION

SUMMARY

The evcluation of the results from the inservice examinations in-dicated that the integrity of the system has been maintained.

3.0 DISCUSSION OF EXAMINATION 3.1 Inspection Boundary The examination plan focused on piping circumferential butt welds in portions of the Safety Injection system containing stagnant oxygenated borated water. This piping consists of 8" diameter, Schedule 10 (0.148" wall) and 12" diameter, Schedule 10 (0.180" wall) austenitic stairless steel. The components examined and the examination report numbert are summarized in the attached Appendix B - ASME Class 2 Examina-tions, Table S2.2.1.

l LCD101283JJB01 4

3.2 Examination Methods Ultrasonic examination methods and techniques were used to perform the volumetric examinations. The ultrasonic test system consisted of an ultrasonic digital / analog tester and a two-channel strip chart recorder. One channel of the re-corder was calibrated to represent ultrasonic screen height (amplitude) and the second channel was calibrated to indi-cate metal path (range) to the reflector. This approach gives a permanent record of the examinations and allows further evaluation of any indications by the contractor's Level III and Northern States Power Company.

The ultrasonic techniques utilized miniature (1/4" x 1/4"),

5.0 MHz transducers. These were mounted on high tempera-ture wedges which provided refracted shear wave angles of 45 degrees and 52 degrees in the parts to be examined. A 2-1/2 V metal path was used for all examinations.

All visual exam' nations were aided, when necessary, with i

artificial lighting and verified for adquacy with an 18%

neutral gray card containing a 1/32-inch black line.

3.3 Examination Procedures The ultrasonic examination procedure for pipe welds com-plied with the requirements of Appendix III of ASME Sec-tion XI issued in the Winter 1975 Addenda. All other examination procedures complied with the requirements of the 1974 Edition through and including the Summer 1975 Addenda of ASME Section XI. A listing of the procedures used for the examinations is shown in Table III of Appen-dix E.

3.4 Equipment and Materials All equipment and expendable materials used in the examina-tions are listed either by serial number or type along with their respective calibration date or batch number in Table IV of Appendix E.

The ultrasonic calibration standards used in the examina-tion are listed in Table II of Appendix E.

These standards are owned and maintained by NSP at the plant site.

3.5 Personnel Northern States Power Company contracted Lambert, MacGill, Thomas, Inc. to perform the ultrasonic examinations. Hart-ford Steam Boiler Inspection and Insurance Company, repre-senting ANI, provided the Authorized Inspection.

LCD101283JJB01

All parsonnel involved in the performance or evaluation of examinations are listed along with their title, organization, and ASNT Level of certification in Table I of Appendix E.

Certifications for examination personnel are maintained on file by Northern States Power Company.

3.6 Evaluation Any indications disclosed in'the examinations were evaluated by the examiner at that time in accordance with the rules of the procedure and ASME Section XI.

The ultrasonic examiner was aided in his evaluation by a cali-bration performed on a standard reference before each day's examination, checked before and after each individual examina-tion, and at intervals not exceeding four (4) hours.

In addi-tion, the ultrasonic data wcs recorded on strip charts which were made a part of the inspection report, and permitted fur.

ther evaluation.

3.7 Examination Reports and Documentation All examination reports and documentation are maintained on file by Northern States Power Company. Table I of Appendix B identifies the examination report number (s) for each item examined. Many of the items identify more than one examina-tion report because of the difference types of examinations performed on the item.

Table I of Appendix B summarizes all the examinations that have been performed to date and identifies the amount that will be examined in the future to complete the ten year ex-amination requirements. For retrieval purposes, the prefix of the inspection report number corresponds with the year that the inspection was performed. The examination report numbers for this outage are prefixed with "83A ".

Table II of Appendix B compares the baseline examination results with the results obtained during this examination.

Table II of Appendix B identifies the isometric drawings that were used for the examinations. The personnel, ul-trasonic calibration blocks, procedures, equipment and materials that were used for the inspection are identified in the tables of Appendix E.

Appendix F contains the Form NIS-1, titled, "0wner's Data Report for Inservice Inspec-tions".

LCD101283JJB01

m APPENDIX A ASME CLASS 2 EXAMINATIONS n

I

e Forn 9-4,Rev.0 (H&SP 5.2)

NORTilt:..nl STATES POWER CO.

TABLE SE L1 PRAIRIE ISLAND UNIT 1

PAGE 1

OF R INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM; PIPING-CIRCUf1FERENTIAL BUTT llELDS EXAM COMPONENT OR SY' STEM.

Sua INSP.

R EQ*D.

AMT.

ITEM INSPECTION PER.

M T.

EXM IDENWI W M REMT W.

ITEM GO Y IT M TO E EX M NED

{

l C2.1 C-G CIRCUf1FERENTIAL BUTT llELDS f1AIN STEN 1 A 32-f1S-1 11AIN STEN 1 B 3 2 -115 - 2 l

f1AIN STEN 1 A i

3 0 - 11S - 1 Til0 1

1 f15-7 79-125, 128

!!AIN STEN! B 30-f1S-2

  1. 1AIN STEN 1 A 31-f1S-1 OflE 1

1 f1S-12 77-25, 30 11AIN STEAft B 31-!!S-2 ilAIN STEN 1 A RELIEF llDR, 30-11S-1 11AIN STEN 1 B RELIEF llDR, 30-flS-2 THREE 1

1 t1S-186 81-162, 189 11Alti STEN 1 A 6 - 11S - 1 Til0 4

4 t1S-147 80A-1, 14 f1S-~148 80A-3, 13 f1S-149 80A-2, 12 f1S-150 80A-10, 34 11AIN STEN 18 6-t15-2 ONE 1

1

!!S-136 77-22, 8 Til0 4

4 f1S-135 80A-4, 16 t1S-136 80A-7, 17 115-137 80A-5, 15 t1S-138 80A-6, 44 ronna si-asse e/is LCD010583PLA13

a Form 9 4,Rev.0 (M&SP 5.2)

NORTHt...d STATES POWER CO.

TABLE S2 2 1 PRAIRIE ISLAND UNIT 1

PAGE 9 OFA INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:PTPING CTRCllHFFRFNTIAI RllTT tlFLDS M

SU8 INSP.

R EQ'D.

AMT.

ITEM INSPECTION ITEM N DE i N PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY l TEM TO BE EXAMINED C2.1 C-G (CONT'D)

FEEDUATER A 16-FU-12 THREE 1

2 FM-144, 164 B1-144, 179, 90, 75, 8 16-FU-13 TU0 18 19 FU-147 79-129 FU-161, 162 79-SP-5,4 FU-164 79-SP-2,1/80A-26, 78 B1-104 FU-164 B2-029, 068, 087 FU-148 79-SP2-1, 72, 74,105 j

FU-149 79-SP2-1, 9, 60, 106 FU-150 79-SP2-1, 10, 61, 107 FU-227 79-SP2-6, 6R, 11, 65, 108/80A-31, 50 FU-151 79-SP2-1, 12, 64, 109 FU-152 79-SP2-1, 13, 69, 110 FU-153 79-SP2-5, 14, 68, 111 i

FU-154 79-SP2-1, 15, 67, 112 FU-155 79-SP2-1,16, 71,113 Fh-156 79-SP2-1, 17R, 85, 114

~

FU-157 79-SP2-1, 4, 55,115 FU-158 79-SP2-1, 21, 59, 116 FM-159 79-SP2-7, 7R, 22, 52, 117, 97, 98, 99 FU-159 Baseline 79-SP2-103, 104, 118 i

FU-159 30A-24, 48 FU-160 79-SP2-8R, 23, 63, 119, 30A-25, 49 FU-213 79-SP2-2, 53, 24, 120 FU-161 79-SP2, 2, 25, 57,121 FU-162 79-SP2-2, 26, 56,122 FU-164 79-SP2-2, 28, 58, 123 Fonu e 7-147s e/re LCD010583RLA13

Form 9 4,Rev.0 (H&SP 3.2)

NORTlit..N STATES POWER CO.

TABLE S2.2.1 PRAIRIE ISLAND UNIT 1

PAGE 3 OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUf1FERENTI AL BUTT llELDS EXAM COMPONENT OR SYSTEM sua INSP.

R EQ'D.

AMT.

ITEM INSPECTION PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

ITEM ORY IT M TO EE M NED i

1 C2.1 C-G (C0flT'D)

FEEDilATER B 16-Rl-15 ONE 1

1 RI-220 77-15, 9 16-FW-16 Til0 4

4 Bl-214, Fil-216 79-SP-7, 8, 1 Bl-214 79-SP2-19, 32, 70 FW-216 79-SP2-19, 30, 79, 12h/

80A-23, 51, 52, 105 Fil-216 81-89, 76, 76R, 88 THREE Rl-216 82-023, 030, 030R, 067, 088 FEEDLIATER A (8 IN) 3-AF-11 TH0 2

2 RI-165, AFW-202 79-SP-17, 18 Fil-165, AFW-202 79-SP2-127, 128 FEEDilATER B (8 Ill) 3-AF-12 Til0 2

2 Rl-127, AFW-129 79-SP-19, 20 Fil-127, AFW-129 79-SP2-129, 130 REFUELING llATER STORAGE TANK DISCHARGE 12-S1-1 Til0 1

1 11-195 80-60 THREE 1

1 Il-178, 187 81-198, 30 12-SI-3A Th0 2

2 11-186,11-261 80-54, 55 THREE 2

4 11-184, 83-82, 104, 40 11-261, 186 83-67, 105, 68, 116 11-187 83-69, 117 12-SI-3B TL10 1

1 W-194 80-56 THREE 1

4 11-194, 258 83-74, 122, 73, 121 11-191, 190 83-71, 120, 72, 119 ronne e r-a41s e/rs LCD010583RLA13

For:a 9

4,Rev.0 (M&SP 5.2)

NORTHt:nN STATES POWER CO.

TABLE S2.2.1 PRAIRIE ISLAND UNIT I

PAGE __4_

OF 8 I

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUf1FERENTIAL BUTT WELOS M

8 INSP.

REQ'D.

AMT.

ITEM INSPECTION SUB E.

DE iP i N PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

ITEM GORY ITEM TO BE EXAMINED C2.1 C-G (CONT'D) 12-SI-11 THREE 1

1

!!-187 81-130 7

ll-188, 189 63-070, 118, 83, 161 il-100, 101 83-84, 129, 85, 123 11-102, 103 83-86, 124, 90, 128 i

l 1-l-104 83-89, 125 1

if-104 838-002, 006 f

12-SI-4 TLD 1

1 61-196

'82-076, 092 80-57 l

THREE 1

1 ll-202 10-SI-8 l

STREAtt 1 Til0 1

1 11-206 80-50 STREAt1 2 THREE 1

ll-213 82-089, 090 CONTAltt1EllT SullP B DISCHARGE LIrlES 14-SI-33A 14-SI-33B 12-SI-34A 12-SI-34B TLD 1

1 11-5 80-82 ALTERNATE C0llTAltit1ErlT SPRAY Put1P SUCTI0tl 6-R}i-10A

~

Til0 1

1 11-269 80-53 BRAtlCH 1 BRANCil 2 Til0 2

2 11-5 80-65 11-7 80-67 6-RH-108 BRAtlCH 1 Til0 2

2 11-230,11-270 80-52, 51 THREE 2

2 il-229, ll ' 83 81-66, 65 z

roa= imu er" LCD010583RLA13

Form 9 4,Rev.0 (M&SP 5.2)

NORTHt:nN STATES POWER CO.

TABLE S2 2 1 PRAIRIE ISLAND UNIT I

PAGE 3 OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCullFEREilTIAL BUTT WELDS INSP.

R EO'll AMT.

STEM INSPECTION SUB E.

N I ION PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

STEM GORY ITEM TO BE EXAMINED C2.1 C-G (CONT'D)

BRANCli 2 Til0 2

2 11-113,11-128 80-33, 66 THREE 1

1 W-129 81-64 RESIDUAL HEAT REl10 VAL DISCHARGE 12-RH-6A T110 1

1 11-17 80-81 12-RH-6B TWO 1

1 11-6 80-83 8-RH-9A TWO 1

.I

!!-112 80-46 i

8-RH-9B TWO 2-2 W-195, W-193 80-21, 22 l

THREE 1

1 11-243 81-45 8-RH-7A TWO 1

2 W-88, 89 80-49, 47 9-RH-78 Til0 3

3 11-138,ll-206, W-14:

80-19, 23, 20 SAFETY INJECTION PUf1PS SUCTI0fl 6-SI-13A Til0 1

1 Il-17W 80-3 6-SI-138 Til0 2

2 11-134, 141W 80-58, 2 8-SI-17 TWO 2

2 11-239, 11-99 80-97, 95 THREE 1

1 W-98 81-32 4

11-99, 239 83-55, 61, 54, 60 11-98, 97 83-56, 59, 51, 58 8-SI-18 Tl10 7

7 11-243, 235, 236 80-96, 99, 104 11-74, 75, 80, 81 80-106, 107, 105, 103 TilREE 2

2 11-68/11-58 81-67/83-98,42 56 11-92, 91 83-52, 20, 48, 19 11-238, 8611 83-49, 18, 32, 17 11-85, 243 83-34, 46, 53, 62 11-94, 237 83-57, 63, 64, 141 FON,4 $ 7 24 76 6/78 LCD010583RLA13

Form 9-4,Rev.0 (H6SP 5.2)

NORTHt...d STATES POWER CO.

TABLE S2.2.1 PRAIRIE ISLAND UNIT 1

PAGE 6

OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCl#1FERENTI AL BUTT WELDS INSP.

R EO'D.

AMT.

BTEM INSPECTION SUB E.

N DE al Tl N PER.

AMT.

EXAM IDENTIFICATKMd REPOHT NO.

ITEM GORY ITEM TO BE EXAMii ED N

C2.1 C-G (CONT'D) 11-88, 87 83-65, 140, 66, 47 W-235, 83 83-33, 50, 28, 26 11-234, 236 83-24, 25, 23, 16 11-81, 80 83-22, 15, 21, 14 11-79, 78 83-12, 9, 11, 7 t1-76, 77 83-10, 3, 2, 4, 5 ll-75, 74 83-6, 8, 75, 142 l

W-73, 72 83-87, 143, 88, 147 11-71, 70 83-91, 149, 92, 150 11-233, 69 83-93, 155, 94, 156 W-68, 67 83-101, 152, 102, 153 11-66, 64 83-103, 154, 97, 29 11-63, 62 83-96, 27, 81, 30 ll-61, 60 83-80, 31, 79, 35 11-59, 58 83-78, 36, 77, 37 11-57, 242 83-41, 38, 76, 39 ll-52, 51 83-145, 139, 127, 138 11-50, 53 83-115, 151, 126, 137 11-277, 278 83-111, 136, 110, 135 11-279, 280 83-109, 134, 108, 44 11-281, 282 83-107, 133, 100, 132 11-54, 46 83-99, 131, 148, 159 11-47, 48 83-112, 157, 113, 158 Il-49, 55 83-114, 160, 45, 43 9

ll-282, 235 83A-009, 016, 001, 004 11-92, 59 83A-003, 005, 007, 01 4 11-66, 73 83A-008, 015, 010, 01 7 11-75, 77 83A-011, 018, 012, 01 3 11-78 83A-013, 020 8-VC-71A 8-VC-718 Fon u ar aare s/re LCD010583RLA13

Fors 9 4,Rev.0 (H&SP 5.2)

NORTHEnN STATES POWER CO.

TABLE S2 2*l I

PAP

/

OF U PR AIRIE ISLAND UNIT _

PIPfNdECIRCtrittHEN11AL tsul I llELDS INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

INSP.

R EQ'D.

AMT.

ITEM INSPFCTION SUB E-DE I

N PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

ITEM GORY ITEM TO BE EXAMINED l

C2.1 C-G (CONT'D)

RESIDUAL HEAT REl10 VAL SUCTION 10-SI-9A 10-SI-98 Til0 1

1 ll-39W 80-10 ACCUt1ULATOR DISCHARGE LINES 12-SI-28A ONE 1

1 SI-1317 77-35, 56 12-SI-288 12-SI-29A 12-SI-29B Til0 1

1 SI-33 79-49, 47 RESIDUAL HEAT REll0 VAL SUCTION 12-Ril-5A TWO 1

1 11-6 6 80-87 THREE 2

2 11-72, 11-63 81-40, 43 12-RH-5B Til0 2

2

!!-37, W-42 80-11, 25 8-RH-SA T10 1

1 W-64 80-92 THREE 1

1 W-27 82-093, 094 i

8-RH-5B Tl10 1

1 11-35 80-18 8-RH-4A Til0 2

2 If-60,if-59 80-94, 93 8-RH-4B T110 1

1 W-31 80-17 10-RH-3 OrlE 2

2 RH-1045R, RH-1048 77-76, 77 TLD 1

1 W-23 80-101 THREE 2

1 11-2 7 82-93, 94 RESIDUAL HEAT REf10 VAL DISCHARGE

{Hg Il-177 79-103/80-89, 88 10-RH-11 TWO 3

3 THREE 2

2 11-170/ 11-3 81-42/82-042 roam is-use en*

.LCD010583RLA13

Fore 9 4.Rev.0 (H&SP 5.2)

NORTHt:..nl STATES POWER CO.

TABLE S2.2.1 PRAIRIE ISLAND UNIT I

PAGE 8

OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPIhG-CIRCUf1FERENTIAL BUTT llELDS INSP.

R EO'O.

AMT.

BTEM INSPECTION SUS CA E-N DE li i N ITEM PER.

AMT.

EXAM ICINTIFICATION REPORT NO.

GORY iTEW TO BE EXAMINED C2.1 C-G (CONT'D) 6-RH-12 THREE 1

1 l!-8 82-101 1

8-RH-7A TWO 2

2 W-88, 89 80-49, 47 i

8-RH-78 Til0 3

3 W-138, 143, 206 80-19, 20, 23 8-RH-9A TWO 1

1 W-112 80-46 j

8-RH-98 Til0 2

2 11-195, 193 80-21, 22 SAFETY INJECTION i

l 6-SI-10B ONE 1

1 SI-1290 77-48, 57 l

6-SI-10A TWO 3

3 il-128, 131, 126 80-72, 73, 71 l

REACTOR VESSEL SAFETY INJECTION 6-SI-25A Til0 1

1 SI-1291 79-75 THREE 1

1 11-1292 82-099 6-SI-25B ONE 1

1 SI-15 77-35, 58 FORM 9 7-2476 6/38 LCD010583RLA13

R 0

)

E 0

)

N S

0 0

E.

N U

004" I

I

0 T

NS T. 0:2B&

0D 4 :O" ON

-(

0 E

TA E

9T E

IO H 3, S 00 V

R V

o S

V 3

(

F TI 0

T0:

0 0

0 t&0U 0

0 AT E3;R:0" B

0R B

0I B

I NA C: 0O41T A

E A

00:D A

I IT A20F MI

F o o" 5, N 032,A N

R S

S S

AM R1,7EttS A

1I A

2 8,2 A

1 T

XI 0

U R

EL T30T00I E

S0 E

0SE E

A: 3S00D M

0" M

T. 3 N

M E

E1 :E :

A A

O:T A

0N A

LE H15B28R S

N7" S

H7NI S

BG AA TP SN IO SI ITA E

E E

E E

E C

N N

N N

N N

I O

O O

O O

O D

N N

N N

N N

N I

SN EO NI 3,

e IT 2,0 LA 00 E

E E

E E

EC N

N N

N 1%00 N

SI O

O O

O 0:

O AD BN N

N N

N S574 N

I 1

4 2

6 3

5 0

0 0

0 0

0 T

0 0

0 0

0 0

R.

OO A

A A

A A

A PN 3

3 3

3 3

3 ER 8

8 8

8 8

8 EN I.

5 4

LT 3

0 2

EN 2

1 9

SE AD W

W W

BI W_

DO EH T

T T

T T

T DT U

U U

U U

U NEM PO 2

SS 8

NI Y

) N

2. A Y

P R

5M A

Y O

M L

PC h

L P

i S

U M

A P

&R S

E I

U ME T

i T

S

( WTN S

N OIO Y

E S

D

0. P N S R

D S

I UI

/

E L

C 2

vS R

T F

E A

0 eEmA N

R, AT

t. P E

M W B

JM N

U C

J C

T I

J 6TI O O

R T

R 3

3SSC P

I U

O 8

0 I

M C

B B

2 0N E

O I

- REN C

0 9EII 1

1 HRL mTIE D _

2 C

rRAS oORA C

L FNPB fI 1l iIlI l

l

0 0

0

0 N

S NO&S 0

00 U

N E

0:

00I 0 ;0 R 9,

4 NS 00D 0N0 2
A
O:0 01 1O ON IO 94R E

9I50 E

0 0

E T

3 V

S0 V

F TI V

T 0

AT

&OR 0

&AO1 0

0 0

4,01 NA TE B

RT1 B

B 00 I

IT 0

N A

0T A

0N A

3 I

MI 00N) 0E0O 3 ;O

2, AM
0I S
N0T S
0T S

0 2

XI 3:

R.

A 2E T

A 30 A

12 W

EL 2, 0 I

.P,4,0 N

0 R.

R.

E 0I E

10 E

.S A

M T. 1 E

T. 2 B M

T.1 2

I M

T. 0 I

LE LE A

- - 0R A

A 1

BG HSE (

S HSS1T S

H&1E S

HNE AA TP S

N D0M IO 05A SI

/< E D

,S IT I

A C

E E

E E

E

.G E

I N

N N

N N

30N N

D O

O O

O O

EO O

N N

N N

N N

SGL N

I SN EO NI IT 005 ;

0%

LA 4,0 3,0 5 0 EC E

E E

E E

E SI N

122:40 N

N N

N N

AD O

1 - 6 O

O O

O O

BN N

S0S0&3 N

N N

N N

I 7

4 8

5 0

7 1

T 0

1 0

1 1

1 1

0 0

0 0

0 0

0 R

Oo PN A

A A

A A

A A

E 3

3 3

3 3

3 3

R 8

8 8

8 8

8 8

EN I.

LT EN 9

6 3

5 SE 5

6 7

7 AD BI W

W W

W W_

DO EH DT T

T T

T T

T T

NE U

U U

U U

U U

M PO SS 2

NI 8

Y

) NA Y

2. P R

5M A

o M

Pg M

S U

M

&R S

E ME T

WTN S

(

OIO Y

0. P N S S

UI

/

vS R

T 2

eEDA N

0 R, A A M TNP E

B N

J 6TLO O

T J

3SSC P

3 0

I M

N 8

0N E

O O

2

- RE!

C C

1 9EII 0

HRL 1

1 mTIE D

rRAS 2

C oORA C

L I

FNPB I

l

Form 9-0036,Rev.0 (M&SP 5.2)

TABLE II NORTHERN STATES POWER COMPANY PAGE 3

0F 3 I

PRAIRIE ISLAND UNIT BASELINE COMPARISON SCHMARY NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM

_ IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS ISO METHOD C2.1 CON'T UT 83A-018 NONE NONE SAME AS AB0VE UT W-77 83A-012 NONE NONE H.T. 3:00 & 10:30; N0 S-2,7:30 TO 10:30 E.I.R.

~

UT 83A-019 NONE S-3 ID/0D SAME AS AB0VE GE0., 50%,

l-LONG SEAM; S-4 ID/0D GE0., 50%,

LONG SEAM UT W.78 83A-013 S-3,4, S-4 ID SPOT H.T. 3:00 & 10:00; 100% @

225%

N0 5-1,7:30 TO 9:00 &

10:30 E.I.R.

1:00 UT 83A-020 S-3,40%

S-3 OD GEO.,

SAME AS ABOVE

@ 1:30 30% LONG SEAM;S-4 ID SPOT 112%;

S-4 OD GE0.,

40%,LONG SEAM 84 UT W-282 83A-009 NONE NONE H.T. 3:00, 9:00 &

12:00;N0 S-1,2:00 TO 4:00 E.I.R.

83A-016 S-1,2,3 NONE SAME AS AB0VE 109% SPOT

@ 12:00 TYP 360 LCD101283JJB02

.o TABLE 3

NORillEl4N STA1TS IGER CD.

PACE 1 OF 3

PRAIR111 ISLAND 1841T 2 IFRORIC SlH4ARY - Ct ASS 2 LINE LINE lir - CAL" NSP ISO II SIZE PASGlER STANDAHD lAffilLR j

At.h 2-1S1-37 0

STEAM CEtiERATORS i

j 2-151-46 0

MAIN STEAM (CENERAL VIEW)-

A A

32" 32-2HS-1 N3.

2-ISI-46A 0

A 31" 31-2HS-1 24 2-ISI-46B 0

30" 30-2HS-1 23 I

6" 6-2HS-1 7

l 2-ISI-47 0

HAIN STEAH (CENERAL VIEW)

B B

32" 32-2HS-2 NO.

2-ISI-41A 0

B 31" 31-2f tS-2 24 2-1S 1-4711 0

30" 30-2HS-2 23 6"

6-2ttS-2 7

A g 37 yg 2-ISI-43 0

FEEDWATER (CEtlERAL VIFW)

A 16" 16-2tW-13 2-ISt-4HA 0

A 16" 16-2 W-12 11 2 - I b i 4e'.i 0

16" 16-2 W -11 13 6"

3-2AF-11 No.

B 13716 2-1S1-49 0

FEED'JATER (GENERAL VIEW) 3 16" 16-2W-16 2-ISI-49A 0

3 16" 16-2FW-15 13 2-ISI-493 0

8" 3-2AF-12 NO.

22 2-1S1-50 1

RilR PUHP B SUCTION (WELDS)

B 10" 10-2Ril-3 29 2-ISI-51 1

RHR PUtIP 3 SUCTION (llANGERS)

B 8"

8-2RH-43 29 8

8" 8-2Ril-55 32 8

12" 12-2 Ril - 58 22 B

10" 10-251-98 29 RiiR PUMP A SUCTION (WELDS)

A 8"

8-2Rit 4A 29 2-151-52 i

RilR PUHP A SUCTION (HANGERS)

A 8"

8-23UI-5A 32 2-151-53 i

A 12" 12-2RM-5A 22 A

10" 10-2SI-9A

_]

t NORTilERN STATES POWER CO.

PRAIRIE ISLAND UNIT 2 PACE 2 of 3 ISOMETRIC SUlftARY - CLASS 2 NSP ISO LINE LINE UT - CAL.

REVISION COMPCNENT OR SYSTEM LOOP NUMBER SIZE NUMBER STA;iDARD 2-ISI-54 1

RilR PUMP B DISCllARGE (WELDS)

B 8"

8-2RH-78 29 l

2-ISI-55 0

RIIR PUMP B DISCilARGE (HANCEPS)

B 8"

8-2RH-98 29 B

6" 6-2SI-10B 27 2-ISI-56 1

RilR PUMP A DISCllARGE (WELOS)

A 8"

8-2RH-7A 29 l

2-ISI-57 0

RilR PUMP A DISCilARGE (llANGERS)

A 8"

8-2Ril-9A 29 A

IG" 10-2Ril-11 22 l

A 6"

6-2RI! -12 27 f

1 2-ISI-58 1

CONTAINMENT SUllP B DISCilARGE B

12" 12-2PJi-6B 32 l

B 14" 14-2SI-33B NO.

B 12" 12 -2SI-34 B NO.

2-1S1-59 1

CONTAINMENT StifP B DISCllARGE A

12" I 2-2Ril-t..

32

'l l

A 14" 14-2SI-33A th).

A 12" I2-2SI-MA

0. ____

2-iSI-t>o 1

SAFEri INlFCI' ION Pl!!!PS SI:CTION A&B h"

6-2SI-LJA 23 g

6-2SI-13B 28 2-ISI-61 1

BORIC ACID SUPPLY TO SAFETY INJECTION 12" 12-2SI-11 33 l

8" 8-2SI-17 20 8"

8-2SI-18 30 2-ISI-62 0

SAFETY INJECTION PUMP 22 SUCTION (WEI.DS)

B 6"

6-2RH-108 27 2-ISI-63 0

SAFETY INJECTION PUMP 22 SUCTION (IIANGERt )

2-ISI-o4 0

SAFETY INJECTION PUME 21 SUCTION (WELDS)

A 6"

6-2Ril-10A 27 2-ISI-65 0

SAFETY INJECTION PUMP 21 SIICTION (IIANGERS )

2-ISI-66 1

REFUELING WATER STORACE (WELDS) 14" 14-2SI-1 NO.

l TANK DISCllARGE 12" 12-2SI-3A 33 2-ISI-67 0

REFUELING WATER STORAGE (llANGERS) 12" 12-2SI-3B 33 TANK DISCilARGE 12" 12-2SI-4 33 t

=

NORTiiERN STATES POWER CO.

PAGE 3 OF 3 PRAIRIE ISLAt3D UNIT 2 ISOMETRIC SUllMARY - CLASS 2 LINE LINE UT - CAL.

NSP ISO REVISION COMPONENT OR SYSTEtt LOOP SIZE NUMBER STANDARD NUllBER 2-ISI-67 0

Continued 10" 10-2SI-8 31 12" 12-2SI-11 33 2-ISI-68 1

BORIC ACID TANK 21

  1. 21 2-ISI-69 I

RESIOUAL llEAT EXCHANGERS

  1. 21 6 #2:

NO.

2-ISI-70 0

REACTOR VESSEL SAFETY INJECTION (WELDS)

B 6"

6-2SI-25B 6

2-ISI-71 0

REACTOR VESSEL SAFETY INJECTION (llANGERS i

2-ISI-72 0

REACTOR VESSEL SAFETY INJECTION (WELDS)

A 6"

6-2SI-25A 6

2-ISI-73 0

REACTOR VESSEL SAFETY INJECTION (llANGERS l

2-ISI-74 1

BORIC ACID SUPPLY (flELDS) 8" 8-2SI-18 30 2-ISI-75 I

ACCUMULATOR DISCilARCE

.A 12" 12-2SI-28A 11 12" 12-2SI-29\\

!I li 12" 12-lSI-lab li 12" 12-2SL-2VB 11 2-ISI-76 1

ACCUMULATOR TANKS

  1. 21 & 22 NO.

9 m

APPENDIX B TABLE I

- PERSONNEL LISTING TABLE II ULTRASONIC CALIBRATION BLOCKS TABLE III - PROCEDURE LISTING TABLE IV - EQUIPMENT AND MATERIALS i

J 9

-)

NORTHERN STATES POWER COMPANY APPENDIX E

PRAIRIE ISLAND UNIT I TABLE I

PERSONNEL LISTING PAGE 1 of 1 ASNT LEVEL EXAMINER TITLE ORGANIZATION UT PT MT VT ET RT R.G. AVER TECHNICIAN LMT II II II II (la)

A.J. HARRY TECHNICIAN LMT I

R.A. KELLERHALL SUPERVISOR LMT III III III III (la)

P.N. NASH TECHNICIAN LMT II II I

K.E. SCHRIVNER TECHNICIAN LMT I

L.C. DAHLMAN M & SP NSP II III III III III SPECIALIST (la)

J.F. SCHANEN M & SP NSP II II II II SPECIALIST (la)

II III M.T. ANDERSON M & SP NSP III II ENGINEER (la)

C. LINDSTROM ANI HARTFORG STEAM BOILER INSURANCE COMPANY FOOTNOTES:

(la)

Inspection experience and NDE qualifications were judged to be adequate to perform visual examinations in accordance with NSP-VT-1.

(2)

Organization:

(LMT) Lambert, MacGill, Thomas, Inc.

515 Aldo Avenue Santa Clara, CA 95050 N

1 E

I F

I 0

33333333 33 E

88888838 88 X

T I

1 A

77987798 77 D

D 22222222 22 N E E L E 99999999 99 P B G P A A A T P ST 12451345 32 R

00000000 00 O

00000000 00 P

E AAAANNNN AN R

GGGGNNNN GN RRRRPPPP RP R

E B

M U

8 N

4 0

1 3

T 7

0 A

4 7

E 6

2 ir 4

4 0

0 3

L 3

A P

I P

T R

T E

T 2

2 A

1 1

M 3

3 A

A 8

"0 4

8 1

1 E

L U S D S E E H N C K S C 0

0 I

1 1

E H P T I

h h

Y S

P &

c c

N K

S S

A C

P O

M L

O B

C A

I N

I R

O D

E T I

"8 "2

W I

T G N A 1

P U R E

B Z

S I

I E D L S

T N A A A C I

T L S S C I

I N

N O

R E O N

0 3

E I

S 3

3 H R A T

I R

P R A T S

O R L N

N P U

=

1 l

NORTHERN STATES POWER C&:PANY APPENDIX E

PRAIRIE ISLAND UNIT I TABLE III PROCEDURE LISTING PAGE 1 0F 1 i

PROCEDURE NUMBER FIELD PLANT APPROVAL FIELD CHANGE PROCEDURE TITLE CHANGE DESCRIPTION AND REVISION CHANGE DATE REMARKS j

l NSP-UT-1, REV.1 1

ULTRASONIC EXAMINATION 6-9-82 NONE COVER EXAMINATION 0F PIPE WELDS VOLUME OF S/S PIPING WELDS i

LESS THAN.200 INCH WALL THICKNESS f

NSP-UT-2, REV.1 N/A AUTOMATIC DATA RECORDING 6-22-83 NONE NSP-VT-1, REV.2 N/A VISUAL EXAMINATION 6-22-83 NONE i

i

~

i l

i

[

l l

\\

I l

a i

i e

i

. _ =

NORTHERN STATES POWER COMPANY APPENDIX E PRAIRIE ISLAND UNIT I TABLE IV EQUIPMENT AND MATERIALS PAGE : OF i MATERIAL OR TYPE OR CALIBRATION EQUIPMENT SERL\\L NUFGER R BATCH REMARKS i

ULTRASONIC:

NORTEC 1310 S/N 128 CAL. 8-10-83 NORTEC 1310 S/N 167 CAL. 8-29-83 RECORDERS:

GULTON S/N 2091001 CAL. 4-27-83 G0ULD 2200S S/N 01192 CAL. 8-30-83 GOULD 220 S/N 17466 CAL. 9-01-83 TEMPERATURE GAUGES:

PTC SURFACE S/N 536 CAL. 7-26-83 CERTIFIED BY THERMOMETER MANUFACTURER ROMPAS BLOCKS:

304 S/S S/N #1 CERT 8-4-81 EARLE M. JORGENSON CO.

304 S/S S/N 790392 CERT 6-29-82 APPLIED TEST SYSTEM, t

INC.

MATERIALS:

ULTRASONIC LMT - GEL BATCH 1110812 COUPLANT ULTRASONIC TRANSDUCERS:

S/N SIZE FREOUENCY HARIS0NIC R941 1/4" x 1/4" 5.0 MHZ HARIS0NIC R9167 1/4" x 1/4" 5.0 MHZ HARIS0NIC 06104 1/4" x 1/4" 5.0 tiHZ HARIS0NIC W2124 1/4" x 1/4" 5.0 ftHZ l

HARIS0NIC W2165 1/4" x 1/4" 5.0 MHZ ll*

l l

- - - - - - - ~ -

' - - - - - ~

~

~~

~~

s a

APPENDIX C FORh NIS - 1 OWNERS DATA REPORT FOR INSERVICE INSPECTION

FORM NIS-1 OWNERS' DAIA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)

NORTHERN STATES POWER COMPANY 1.)

owner Address 414 NICOLLET MALL, MINNEAPOLIS, MINNES0TA 55401 2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT Address WELSH, MINNESOTA a

3.)

Plant Unit I

4.)

owner (Cartificate of Authorization) 5.)

Commercial Service Date 12-16-73 6.)

National Board Number for Unit 7.)

Components Inspected Manu f a c turer Component or Manu fac turer or Installer State or National Appurtenance or Installer Scrial No.

Province No.

Board No, ASME CLASS II C2.0 PIPING PRESSURE BOUNDARY C2.1 CIRCUMFERENTIAL BUTT WELDS BORIC ACID NAVC0 SUPPLY TO SAFETY INJECTION W-235, 104, 92, 59, 66, 73, 75, 77, 78, 282 O

ISI-1019, Rev. O Page 1 of 2

FORM NIS-1 (back) 8.) Examination Dates 9-27-83-to_9-29-83 9.) Inspection Interval 12-16-73 to 12-16-83 10.) Abstract of Examinations.

Include a list of examinations and a statement concerning status of work required for current interval.

This report summarizes the inservice inspection examination performed at Prairie Island Nuclear Generating Plant - Unit 1.

This inspection was conducted during the period from September 27 to September 29, 1983 in response to the NRC Staff Evaluation Meeting documented April 18, 1983, specifically item 5 of Section 6 which states that 10 welds be examined o

every six months.

11.) Abstract of Conditions Noted.

The results from the inservice inspection examinations indicated that the integrity of the system has been maintained.

12.) Abstract of Corrective Measures Recommended and Taken.

No corrective measures were required.

We certify that the statements made in this report cre correct and the examina-tions and corrective measures 'taken conform to the rules of the ASME Code, Sec-

d. - 2S' 19h3 Signed b S 4rd
d. By
  1. /

Certificate of Authorization No. (if applicable)

E piration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boilen and Pressure Vessel Inspectors and

/A,0.veso5 and employed by /4.,Mel & 8/, fa.,,/or, thjj State or f rovincg of 4 h 4 of i M W J.

L.

have inspected the components described in this Owner's Data Repor't during the period 9 47-f 3 to 'J -Pl-Y 5

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate niether the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and correc-tive measures described in this Owners' Data report. Furthermore, neither r

the Inspector nor hi:: employer shall be liable in any manner for any personal e

injury or property damage or loss of any kind arising from or connected with this inspection.

. bW e B

19 N t

\\

ConYnissions /U/d MM

(( A> 860-63 Inspector % Signature National Board, State, Province & No, LCD110283JJB01 Page 2 of 2