" TEMPORARY CH ANGE" Three Mile Island Nuclear Station Temporary Change Notice (TCN)

NOTE Instructions and guidel.nes in AP1001 A

12. TCN No D'E 'o!2J3' G tFrom TCN Log incent S

must be followed wnen comcie..ng this form g

S$/SF Signature I

h v

1.

Procedure 1004.29 3

ACTIVATION OF 0.S.C.

l No.

Present new No Tet.e 2.

Chang (include page numbers. paragraph numbers. and exact wording of enange. (Attach additional snee3s if necessary and prov de 'he genenc nature of the enange on t~. s sheet.)

Update entire procedure to reflect new layout anc meth d eration.

(NOTE: This TCN cancells TCN 1-83-0225) 3.

Reason for Change:

NRC recomendations and periodic review.

A 4.

Duration of TCN - No longer than ninety days from implement on 7 TCN or as in (a) or ib) below whichever occurs first.

(a)TCN will be can a procequre revision L a result of a Procedure Change 0 Recuest to b by J. L. Whitenea (Submit PCR as soon as Ind'vidua TCN possible)

O (b)TCN is no

'er Jillecwe es en en resu.rin *0N eeing cancedect 5.

Is procedure '

.c rtaMSafety"7.-

M.)

yesG no O If "Yes" a sa salua tion is required (side 1 yes O no 0

)

6.

Is procedure "Env nmentallmpact Ret uired ' de 21.

(

If "Yes* an environmentalimpact evalu o -

7.

Does the change ef f act the intent

'h on al procedure?

yes C no 0 the Shif t Supervisor.

NOTE. lf answers to # 5,6 an re " ~ the change may be c NOTE: If answer to #7 i fes nange must be revi d a proved in accordance with Table 2 pnor to impleme t and answers to #5 re -

' cnange may be either fal two member NOTE: If answer to reviewed %ev w d and approved in ag., j.,

9 with table 2.

'l Review Signatures:

Date O!C D 8.

Change Recom da s

currefh I M I2d - -

Date [' //Y/_a'.3 9.

  • Procecure Owner

. nesponscie Tecnnicai nev wer. Responsseie of f'co Cecdnent head. [r nas Ces gnee rrav concur it Procecure Cner es unavadao.e

. May ee av Teiecon

10. Tecn. Functions Rep. Notified Of reqd )

M Date /'/r I/d

11. Approvaitsb
  1. h yiQ in h (a) Two Merreers of the GPUN Mng.

l g

bd //[/

y

.5#

Staff Route drip stu

/

o.e.

w (Dn

.. re -.

// //

6 I

8'8""

D '

l inatuT)

/

cate 0

$5 2 c na e I

of3 _Q v m v 4 f /f s.

o ca,e 00 f

OQ

,0 <

Within fourteen (14) days: (Accroval fc) SS Accroval Cnly: (This accroval ent ri g

used if anwers to questions #5. 5 and otr per AP 1001 A must occur) to l

7 are ail"No* )

(D a.it

(

g s.snaise e.i.

l n S.snature care 4

s..n... e ea,e

-l 14 TCN is Cancelled

) )

...,..-u,,u,

"EVA LU ATIO N **

Side 2 Three Mile Island Nuclear Station 7c3 % Q -1 l l-1 i i i i Safety / Environmental Impact Evalua tion Nl

-l

- Procedure 1004.29 ACTIVATION OF THE 0.S.C.

3, r...

2.

Safety Evaluation Deep the attacned procedure change:

'fa)g' increase the probability of occurrence or the consequences of an accident or yesOno@

l malfunction of equipment important to safety)...

  • (o) create the possibdity for an accident or malfunction of a different ty t

yesO nog evaluated previously in the safety analysis report ?......

  • fc) reduce the margin of safety as defined en the basis f r any
  • cnnical yes O no O specification)

Details of Evaluation (Emplain.vny answers to above quest',are "r ~ Attach additional pages if required )

This change provide a i c anal guidance (a larification and does not have any detrime

1. n ct on sa fety.

\\D u

t

% k/

I U

Evaluation A

Date

  • lf any of these questions are answered "YES n

must be reviewe proved by the NRC pnor to implerveritation 3.

Environmental!mpact Fvaluati n

Does the attached proced - cha (a) possibly involve si i i ant environmentalimpact).

yes O no O (if 3tal is "ye ~ n e uestions !b) and P fi..n ' Details of Evaluation" below. !!co, tate wny y filing in the " Details o Eval a son" below 1

':b) nave a sig

. nt verse effect on the environm yes O no O

'lc) invcive a significant environmental matter or question not previously reviewed yes O no O and evaluated by the N R C....

Details of Evaluation (Attach additionalpagesif recuireo) b a

i l

l l

Eva:uation By eate I

  • 1f any of nese cues!.ons are answered "YES" the enange must !:e reviewed and accroved by :he NRC onor to l

imo;ementation.

4. (1) Normal Approval (a)
4. (211f "Two (2) members of the Within fourteen (14) Days ipa P1 1A GPUN managemer.t staff route:

Approval per AP 1001 A e

N.4. m,.

~~

.e...

s+..

e...

sv.w.

c,

)

!!If&

rwi

?

$.F L4 i

Cate S.crarwee Oa e

.,5 -**sve oe,

S 32 AOCol1325

THREE MILE ISLAND NUCLEAR STATION UNIT NO.1 EMERGENCY PLAN IMPLEMENTING PROCEDURE 1004.29 ACTIVATION OF THE OPERATIONS SUPPORT CENTER 1,0 PURPOSE The purpose of this procedure is to provide guidelines for the Operations Support Center Coordinator to activate the Operations Support Center.

The Operations Support Center Coordinator is responsible for implementing th)s procedure.

6 1

2.0 ATTACHMENTS 2.1 Attachment I, Operations Support Center Floor a

3.0 EMERGENCY ACTION LEVELS 3.1 This procedure is to be initiated upon d x4on of any of the following:

3.1.1 A

a etermined by the Al Procedure, 1004. 2.

(

3.1. 2 e ~,ergency as dete a19 y the Site Emergency

(

p edure 1004.3.

3.1 neral Emergen

\\rmined by the General Emergency i

procedure,1004.

f 3.1. 4 As directe Emergency Direc r.

(..

4.0 EMERGENCY ACTIONS Initials v

4.1 The ons Support Center Jnator will activate the OSC by e i

completion of e o wing:

.1 Announce personnel in the OSC area that a

you are the ' rations Stipport Center Coordinator and fill in your name on the OSC Manning Status Board. Have other coordinators (Rad. Con Coordinator, Chemistry Coordinator, and Emergency Maintenance Coordinator) enter their names on the Status Board and announce themselves as they arrive.

4.1. 2 Assign a phonetalker to activate Operations Line (M&I Phone Line may be used) and to log all appropriate messages sent and received on the i

Telephone Comunications Logsheet ( Attachment 1

III of the Communications and Recordkeeping I

procedure, 1004. 5.

4.1. 3 Initiate and maintain the OSC log in accordance

(,

with Comunications and Recordkeeping, procedure 1004.5.

O e

^:-.-.--.-.-..-..---._,

O 4.1. 4 Establish access contro' at the OSC so that all personnel must frisk prior to entering the OSC i

'N if radiological problems exist or are expected to exist. Refer to Attachment I for suggested frisking locations.

4.1. 5 Establish a roster of personnel at the OSC and track teams as they are dispatched and return l

using the Team Tracking Status Board.

l 6

4.1. 6 As directed by the Operations Coordinator / Radiological Asse nt Coordinator l

implement the following pr e re -

a.

Onsite and 0 iological Monitoring 1004.10 b.

Search a escue c.

R io ogical Controls during encies 004.9 I,

d.

Emergency R Operations V

1004.21 i

i e.

Any cedure as directed by the Rad Assessment i

r/ Operations Coordinator.

i

.7 If direc ispatch monitoring teams,- ensure vehicles a ailable at the processing center. Assign a driver, as needed, to accompany the Rad. Con Technician.

t a.

Rad Con, for the Rad Con Van.

b.

Maintenance, for the I&C Vehicle.

c.

Other vehicles as needed.

4.1. 8 If accountability is being conducted, collect all security badges and turn them over to the Site Security Officer who will be dispatched to pick them up.

i I

NOTE:

All personnel must retain their keycarcs.

s[

- ~-

4.1. 9 If Onsite Duty Roster personnel arrive, turn over duties to them as time permits. Ensure that their name is filled in on the OSC Manning m

Status Board and that an announcement is made in

~

the OSC area when they assume your duties.

4.1.10 When all coordinator positions are filled with Onsite Duty Roster personnel, establish operations of the OSC per the floor plan in i

Attachment I and direct excess personnel to the i.

established areas on Attachment I.

i 4.1.11 Periodically brief personnel he OSC regarding current plant s us n projected course of events.

4.1.12 Inform the Emergency via the

' ions Support Conter communicator, that t is Operational.

5.0 FINAL CONDITIONS Initial s 9

5.1 "h

tions Support C n ill be operational with muster ae tablished for ettion personnel and communications

+

tablished on the Op a: al Line.

5.2 Duty section pe re available fo assignment as

(

necessary.

v 0-s 1

l

(-

__-_---__----___-______-____..__mm

3

~

t>

Storage Count Ops &

Office Lav.

Sec. Sample Room Room Maint.

. 9

(

Team NRC Muster Area Briefing. frea d

' =. -

Room Chemistry A

I Hoster e

Shower

.Pers.

Area e

To Turh. Bldg.

[

~

Deton.

IlCC @ @

Q MAINT.

klav.

2 2-y Elev.

A

)

CllE

.A 000 6.

T.

h

~

(As Built V6

-Out Area 4g 3

~

(Drawings

-e u

(

Frisking

[

Area Team Tracking h

Status Drj 6A

)

Rad Con flot Inst.

( s' Radiochemistry Muster Shop i

i Area 7

Lab

' stairs Emer.

Nuclear Sample Room

'~

%p

~

Lkrs.

f s -Fri

~

Are

.v g a

p To Aux, &

1

. KEY: @ Page Phone / H & I Line Fuel llandifnq~

O-Ops. Line Hidgs.

G-Rad. Line f-4REmer. Management Line i

'G NRC llealth Physics Net

'ONRC Intra-Consnunications Line

  • -Intercom System 8

i r

-h. ' ~ '.

ATTACHIO G II

~

OPERATIONS SUPPORT CENTER 0. ICE LAYOUT-HP Key to OSC Equipment g -.

1.

RM-14 with HP-210 Probe 2.

Table 3.

Desk 4.

File Cab! nets

~

j 5.

Storage Cabinet f

  • umentation 6.

Status B$ardh 7.

REMP Ma,p I.

Cabinc[

9.

P Pa e hone v

s 10.

Fir id Cahimt y

11.

Emergency Lecker (F1 rams, prints, 12.

Hig(Rad area Xu er 13.

Xerox Copie

- 3 Equiement in Retr h ctino Roem:

^

,N ' Counter-Scal d

n Ludium-2000

-2 Wi de-Beta r

C Ortec beta-gama Counter-Scaler Tri-Carc Liquid Scintillation Nuclear Measurements Corp. beta-ga=a,- sipha Counter-Scalers Stabilized Assay Meters a

\\

w-

$.0 r,

h.,

~