ML20083G920
| ML20083G920 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 12/27/1983 |
| From: | Levin H TERA CORP. |
| To: | Jackie Cook, Eisenhut D, James Keppler CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation |
| References | |
| ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8401040379 | |
| Download: ML20083G920 (5) | |
Text
L j q
- o.
b December 27,1983 Mr. James W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 Mr. J. G. Keppler Administrator, Region lii Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Rood Glen Ellyn, IL 60137 Mr. D. G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. 50-329 OM, OL and 50-030 OM, OL Midiond Nuclear Plant - Units I and 2 Independent Design and Construction Verification (IDCV) Program Meeting Notice - Fifth OCR Status Review Meeting Date:
January 4,1984 Time:
9:00 a.m.
Location: Bechtel Offices Conference Room 181/182 777 East Eisenhower Parkway Ann Arbor, Michigan
Subject:
Discussion and Status of Confirmed items and Findings Agendo:
See attachment.
8401040379 831227 PDR ADOCK 05000329 A
PDR 9#f I I TERA CORPORATION 7101 WISCONSIN AVENUE BETHESDA MAFNL.AND 20814 301 654 8960
0 Mr. J. W. Cook 2
December 27,1983 Mr. J. G. Keppler Mr. D. G. Eisenhut
Participants:
H. Levin, et al., TERA L. Gibson, Consumers Power Company T. Ankrum, NRC, I&E HQ D. Hood, et al., NRC, NRR J. Clements, et al., Bechtel Sincerely, l
0//
,Q (W f L dLs,-s~
Howard A. Levin Project Manager Midland IDCV Program ec:
Participants R. Erhardt, CPC D. Budzik, CPC D. Quammy, CPC (site)
F. Levandoski, Babcock & Wilcox R. Whitaker, CPC (site)
J. Taylor, NRC, l&E HQ Midland IDCVP Service List HAL/sl TERA CORPC?ATION
SERVICE LIST FOR MIDLAfO INDEPEtOENT DESIGN APO CONSTRUCTION VERIFICATION PROGRAM g
cc:
Harold R. Denton, Director Ms. Barboro Stomiris Office of Nuclear Reactor Regulation 5795 N. River U.S. Nuclear Regulotory Commission Freeland, Michigan 48623 Washington, D.C. 20555 Mr. Wendell Marshall
.. James C. Keppler, Regional Administrator Route 10 U.S. Nuclear Regulatory Commission, Midiond, Michigan 48440 Region 111 799 Roosevelt Road Mr. Steve Godler Glen Ellyn, Illinois 60137 2120 Corter Avenue U.S. Nuclear Regulatory Commission Resident inspectors Office Ms. Billie Pirner Garde R,w te 7 Diractor, Citizens C!!nic mediana, Micnigan 48640 for Accountable Government Government Accountability Project Mr. J. W. Cook Institute for Policy Studies Vice President 1901 Que Street, N.W.
Consumers Power Company Washington, D.C. 20009 1945 West Pornoll Road Jackson, Michigan 49201 Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board e
Mille,
U.S. Nuclear Regulatory Commission Three First National Plaza, sNngtm, D.C. 20555
,,N[5 Chic o, 11 is 60602 6125 N. Verde Trail Boca Rotm, RoMo 33433 Consum r P er mpony 212 West Michigan Avenue Jackson, Michigan 49201 Jerry Harbour, Esq.
Atomic Sofety and Licensing Board U.S. Nuclear Regulatory Commission Ms. Mary Sincla.ir Washington, D.C. 20555 5711 Summerset Dr.ive Midland, Michigan 48640 Mr. Ron Collen Michigan Public Service Commission Cherry & FI m Y
Suite 3700 6545 Merconfile Way P'O. Box 30221 Three First National Plaza Lonsing, Michigan 48909 Chicago, Illinois 60602 Mr. Poul Rau Ms. Lynne Bernobei Midland Daily News Government Accountability Proj.ect 124 Mcdonald Street 1901 O Street, NW Midland, Michigan 48640 Washington, D.C. 20009
AGEbOA FOR JANUARY 4,1984 IDCVP MEETING BEGITEL OFFICES Atel ARBOR, MICHIGAN 1.
Start - 9:00 AM Lunch - 12:00 PM to 12:45 PM 11.
Discussion of Confirmed items, Findings, Observations, and Resolved items item TERA Lead A.
Construction e F-031,F-036 Tulodieski e F-052*
e F-053*
e F-054*
a e F-055*
e F-056*
e F-091*
e C-093*
e C-094*
e C-095*
e C-096*
B.
Mechanical / Systems e F-043*
Dougherty e C-087, C-088, C-089 e R-066*
Witt e C-084 e C-085 e C-I l 2
- Setka C.
Electrical e C-097*
Dougherty e C-109
- Setko e C-I l0*
e C-Ill*
I
O 6
Item TERA Lead D.
Structural e C-015 Mortgot/Mortore (seismic anal.)
e B-100*
e C-099*, C-101 thru C-108*
e C-071 *, C-113 thru C-l 17*
Mortore (general) e B-lI8*
e C-068, C-069 Mortore (seismic EO) e C-l 19 thru C-122*
lli.
Discussion of programmatic issues (if necessary)
IV.
Discussion of Action items and Logistics for Information Exchange V.
Adjournment - 3:00 PM Estimated Notes:
1.
Items are grouped to the degree practical to facilitate discus-sion and minimize manpower requirements during the entire meeting.
2.
Items that changed status during the November reporting period are denoted with on asterisk.
3.
The following OCRs have not reached a final disposition; however, further TERA or Midland Project octions have been identified during past public meetings. Accordingly, discussions are not contemplated by TERA unless the Midland Project has identified new information that is pertinent to the ongoing octivities.
e C-005 e C-022 e C-025 e C-026 e C-038 e C-039 e C-040 e F-047 e C-048 e F-049 e F-050 e C-074 e C-075 e C-076 e C-077 e C-081 e C-092 2
-_.