ML20083F597
| ML20083F597 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/20/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20083F603 | List: |
| References | |
| 0210-L, 210-L, U-0682, U-682, NUDOCS 8401030197 | |
| Download: ML20083F597 (1) | |
Text
r U-0682 ILLINOIS POWER COMPANY f,y gg y _ g3 (32_29 y _7 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 Docket No. 50-461 December 20, 1983 Mr. Harold R. Denton, D* rector Office of Nuclear Reactc Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Clinton Power Station Unit 1 FSAR Amendment No. 28
Dear Mr. Denton:
Illinois Power Company hereby files Amendment No. 28, dated December, 1983, for the Clinton Final Safety Analysis Report (CPS-FSAR).
FSAR Amendment No. 28 consists primarily of:
a) complete revision of Appendix 13.B, Emergency Plan; b) revisions of Chapter 12, Radiation Protection; c) changes to the Containment Vent and Purge System; d) changes to Section 3.2 to provide for clarification of the safety classifications in Table 3.2-1; and e) some miscellaneous updatings in several sections.
Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10CFR50.30.
Sincerely yours, D. P. Hall Vice President
. GEW/lt enclosures Subscribed and sworn to before N
me the Jo4k day of December 1983.
[' y m Yn.
Notary Public 4
8401030197 831220 PDR ADOCK 05000461 K