ML20083F333

From kanterella
Jump to navigation Jump to search
Forwards Browns Ferry Nuclear Plant Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, Final Rept.Sys Satisfies Requirements of NUREG-0654/FEMA-REP-1,Rev 1
ML20083F333
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/18/1991
From: Gordon Peterson
Federal Emergency Management Agency
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML18036A392 List:
References
RTR-NUREG-0654 NUDOCS 9110040205
Download: ML20083F333 (1)


Text

..-

7 j

m st-r a

) Federal Emergency Management Agency f

Washington,- D.C 70472 J

C l

IN SEP i 8 mg]

  • a4 i

.i

%y,ry Mr.' James M. Taylor 7,w Executive Direntor for Operations N

U;S. Nuclear Regulatory Commission Washington,-D.C.'.20555

Dear Mr. Taylor:

j n

I

= The l'ederal' EmergencyjManagement ~ Agency. [(FEMA); has4 completed;an(

d. analysiniot the1promptCalert and notification system:forithatBrowns:

3 FerryfHuclear' Plant located approximately ten miles northwest of Decatur, Alabama.- This review has,been completed pursuant to Title selected evaluation criteria and Appendix 3 in

44 CFR, Part 350; ~

NUREG-0654/ FEMA-REP-1, Revision-1; -and FEMA-REP-10, " Guide for the

--Evaluation of ' Alert and Notification. Systems for Nuclear Power I

l Plants." The' enclosed report ^ entitled, " Browns Ferry Nuclear Plant.

Site-Specifi6'Of fsite Radiological Emergency Preparedness Alert and

' Notification System Quality Assurance Verification,"' summarizes the ongineerin = design review; incorporates the results of theipublic'

!teleph'one"g'urveyi conducted iimmediatelyifollowing ;,fu11 activation ?

l s

3

$ ffthejalerti andi noti fication s systen t on o Septembe ryll, J 1989 ; and confiras the adequacy..of the applicable evaluation criteria from NUREG-0654/ FEM.\\-REP-1, Revision 1, and FEMA-RIP-10.

1

-r

Based nn the - end neering design review and the results~of the

. September.- 11,-'1989, public telephone 1 survey,'{ FEMA hasLde.terminedi

' that the 'a3 ert and notification' system 1 installed around' the-Browns Ferry Nuclear Plant (satisfies!the requirements 'of.NUREG-0654/ FEMA-I REP-1, x Revision = 1,= and FEMA-REP-10. Therefore, there is reasonable assurance that the[ system?i'siadequatejto.promptly alert and: notify-e t

the:public in the event of a-radiological, emergency at the. site.-

I The$cavestforiithe#al'artTandPnotification! sys. ten containedii,nE th'e

[JulyM6,;

L Title 144 f CFR,; LPart[ 350 E approval < of. :the Alabama WRadiolod./1990,ical1 Emergency Resnonse Plan for Nuclear Power Plants site-

~

=cpecific to; Browns Ferry,pistnowiremoved; The Honorable Guy Hunt,

= Governor.of; Alabama, has been' advised of this-approv 1.

Si c

ely, i

.= %

E k,.-

eterson Associate Director

~

State and Local' Programs and Support Enclosure i

$35 i

l 9110040205 91091s RDR ADOCK 05000259 PDR

.(>