ML20083F277

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Site Security Plan & Rev 1 to Security Training & Qualification Plan.Encls Withheld (Ref 10CFR73.21)
ML20083F277
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/30/1991
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-91-251R, NUDOCS 9110040169
Download: ML20083F277 (2)


Text

.

.- ~

_~

-1 Omaha Public Power District l

UARDS INFORMATION 44e south 16th Street Mall SA Omaha, Nebraska 68102 2247 ENCLOSURE (S) CONT A!N:3}

402/636-2000 WECUARDS INFORM AiCN DECONTROLLED WHEN September 30, 1991 LIC-91-251R m4ED IRW AMHMMS)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-137 Washington, DC 20555

References:

1.

Docket No. 50-285 2.

Letter from 0 PPD (W. G. Gates) to NRC (Document Control Desk) dated June 15, 1991 (LIC-91 178) 3.

Letter from NRC (S. J. Collins) to OPPD (W. G. Gates) dated August 21, 1991 Gentlemen:

SUBJECT:

Revision 3 to the fort Calhoun Station (FCS) Site Security Plan and Revision 1 to the FCS Security Training and Qualification Pl an Omaha Public Power District (OPPD) is submitting as two (2) enclosures to this letter an updated Revision 3 to the FCS Site Security Plan and Revision 1 to the FCS Security Training and Qualification Plan.

Controlled copy numbers 6. 7 and 18 of these items ce being sent to the Document Control Desk.

Controlled copy numbers 19 and 20 of these items are being sent to Region IV.

Caitrolled copy number 8 of these items is being sent to the FCS Senior Resident Inspector.

Enclosurel In response to Reference 3, enclosure I contains an updated Revision 3 to the FCS Site Security Plan. A detailed listing of changes made in Revision 3-is included. As discussed with Mr. Ron Caldwell of-the NRC on June 27, 1991, paragraph 4.1.4.3 (Materials Warehouse) has been changed to permit pre-staging of incoming material to improve the effectiveness of this operation.

Additional suggestiens made by the NRC in Reference 3 are incorporated; all updated information in Revision 3 is marked with a double bar in the margin.

Revision 3 to the FCS Site Security Plan contains safeguards information and must be controlled in accordance with 10 CFR 73.21.

911004016o 910530 ENCLOSURE (S) CONTAIN(S)

PDR ADOCK OFJ002$5

. SAFEGUARDS INFORMATION SATEGUARDS INFORM ATION.

-F PDn DECONTROLLED WHF'1 SEPAR A'f D rpw r.-

fpd G40003 "92W""

s'T il4

SAFEGU ARDS iNroR""

U. S. Nuclear Regulatory Commission llc-91-251R Page 2 ENCLOSurigi cor,,4mg SATECUARD3 tyr0; 1Tl0N' Dicynr.:m <

"9 StrAPAfiD FTCu,-

q3 EnclosufL2 Encic:ure 2 contains Revision I to the FCS Security Training and Qualification Plan and includes a detailed listing of the changes.

Revision 1 to the FCS Security Training and Qualification Plan does not contain safeguards information, if you should have any questions, please contact me.

Sincerely,

&. 5. /W W. G. Gates Division Manager Nuclear Operations WGG/sel Enclosures c:

LeBoeuf, Lamb, Leiby & MacRae (w/o enclosures)

R. D. Martin, NRC Regional Administrator, Region IV W. C. Walker, NRC Project Manager (w/o enclosures)

R. P. Mullikin, NRC Senior Resident Inspector SAFEGUARDS INTOW

.