Responds to NRC Re Violations Noted in IE Insp Repts 50-440/83-33 & 50-441/83-32.Corrective Actions:Site Organization Performed Audit 883 Re Nonconformance Rept Voiding Process.New Nonconformance Repts Issued
ML20083E717
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/16/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20083E700 List:
References
NUDOCS 8312290370
Download: ML20083E717 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

e f

i::~

t_

t!

l

,i,;

t1 t

5,;

11.

et4 v

t 3-.

r(

P O. BOX $000 - CLEVELAND. OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG. - 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRE $iDENT December 16, 1983 NUCLEAR Mr. W. S. Little, Chief Engineering - Branch II U.S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Response to I.E. Report

Dear Mr. Little:

This letter is to acknowledge receipt of Inspection Report Number 50-440/

83-33; 50-441/83-32 attached to your lette-dated November 17, 1983. This report identifies areas examined by Mr. N. Merr1 weather during his inspection conducted October 25-28, 1983, at the Perry Nuclear Power Plant.

Attached to this letter is our response to the two Severity Level V Violations described in the Notice of Violation dated November 17, 1983. This response is in accordance with the provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title *0, Code of Federal Regulations.

Our response has been submitted to you within thirty days of the date of the Notice of ;iolation as you required.

If there are additional questions, please do not hesitate to call.

Very truly yours, M. R. Edelnan Vice President Nuclear Group MRE:pab Attachment cc:

Mr. M. L. G11dner USNRC, Site Mr. C. E. Norelius, Director Division of Projects and Resident Programs U.S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 8312290370 031223

%Q19 M PDR ADOCK 05000440 G

PDR

RESPONSE T0_ ENFORCEMENT ITEMS Below is our response to Appendix A, Notice of Violation, of United States Nuclear Regulatory Commission I.E. Report 50-440/83-33; 50-441/83-32.

I.

Noncompliance 440/83-33-01 A.

Severity Level V Violation 10CFR50, Apperflix h, Criterion XV as implemented by CEI Corporate Nuclear Quality Assurance Program Manual, Section 1500, states in part that " measures shall be established to control materials, parts, or components which do not conform to requirements in order to prevent their inadvertent use of installation."

Contrary to the above, Johnson Controls Incorporated (JCI) incorrectly volded Nonconformance Report No. JCI-172 without adequate documentation to support the actions taken.

B.

Response

1.

Admission or Denial of Alleged Violation We concur that Johnson Controls, Incorporated, Nonconformance Report (NR) No. 172 was improperly volded.

Evaluation of NR #172 revealed that the backup documentation required for the voiding of the NR was insufficient.

2.

Reason for Admitted Violation Human error is cited as the cause for this violation. During the documentation review cycle for JCI NR #172, the In-Process Inspection Supervisor misinterpreted the existing backup docu-mentation. As a result of his actions, the NR was inadvertently voided.

3.

Corrective Action Taken and Results Achieved Site Organization performed audit #883, dated August 16 and 17, 1983, which resulted in the issuance of 2 action requests.

Included in the scope of the audit were NR tracking, close-out, and voiding processes. The audit team selected at random 18 nonconformance reports and determined their status per the existing JCI NR procedure QAS-1601-PNPP Revision 14.

The evaluation Indicated that JCI was properly implementing the major requirements of their program. One minor item identified and documented on AR-002 concerned their use of hold tag status review sheets.

This item was subsequently corrected via procedure revision.

Of major concern during the course of Audit 883 was the NR voiding process. As indicated by the review of JCI NR 172, the NR voiding program was not being properly implemented. Therefore, all of the JCI NRs volded to date were reviewed by the audit team.

Results revealed that all but 3 of 44 NRs checked were justifiably voided. Action request 001 was issued to document the finding.

New nonconformance reports were also issued.

RESPONSE TO ENFORCEMENT ITEMS g

PAGE 2 Because of the seriousness of the action requests, JCI committed to revising procedure QAS-1602-PNPP and clearly defining the NR voiding process.

4.

Corrective Action Taken to Avoid Further Noncompliance JCI procedure QAS-1602-PNPP was revised to clearly describe the NR volding process. The revision defined areas of responsibility and provided detailed instructions for completing "Nonconformance Vold Form".

The Vold Form is attached to the subject NR and remains on file with the af fected documento.

Since issuance of the Audit 883 Action Requests, Construction Quality Section has continued to review all volded nonconformance reports. No new problems have been Identified. Johnson Controls Incorporated is working in accordance with their latest approved nonconformance procedure.

5.

Date When Full Compliance Will Be Achieved Full compliance was achieved November 23, 1983.

II.

Noncompliance 440/83-33-03 A.

Severity Level V Violation 10CFR50, Appendix B, Criterion XVI as implemented by CEI Corporate Nuclear Quality Assurance Program Manual, Section 1600 states in part that " measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected."

Contrary to the above, L. K. Comstock (the electrical contractor) closed out Inspection Report No. 4491 without implementing the required corrective action.

B.

Response

1.

Admission or Denial of Alleged Violation i

We concur with the inspector's observation that L. K. Comstock (LKC) Inspection Report #4491 was closed Improperly as stated in Inspection Enforcement Report 50-440/83-33; 50-441/83-32.

2.

Reason for Admitted Violation LKC Inspection Report #4491 was written to document the discrepancy between a drawing and a termination card. The Inspection Report was dispositioned stating that the drawing has been revised to indicate the circuit as 1E12C-119B instead of IE21C-119B.

i

- _... -,. _ ~ - - - -. - - _ - -. _ - - - -, _. -.

  • RESPONSE TO ENFORCEMENT ITEMS PAGE 3 The inspector then signed the Inspection Report as dispositioned acceptable. However, the drawing had not been revised to indicate the change.

An error on the part of the inspector occurred in that he accepted the disposition when in fact it had not been completed.

3.

Corrective Action Taken and Results Achieved The discrepant condition was documented on Contractor Inspection Report #7564 as well as Nonconformance Report P033-2365 (LKC 2504).

Engineering Change Notice 16282-33-2778 was issued 12/8/83 correcting the circuit number on the drawing.

Posting of the Engineering Change Notice on drawing D-209-100 Sheet 132 Revision D was verified by the contractor on Inspection Report #8248.

4.

Corrective Action Taken to Avold Further Violation Training was administered to both the craft and Quality Control personnel on the procedure 4.3.6, " Instructions for Cable / Wire Terminations," Training was completed on December 15, 1983.

5.

Date of Full Compliance Based on the issuance of Engineering Change Notice #16282-33-2778 on 12/8/83, the close-out of Inspection Report #7564 and #8248 on December 15, 1983, and December 15, 1983, respectively, and the verified disposition of Nonconformance Report #P033-2365 (LKC

  1. 2504) on December 15, 1983.