ML20083E451
| ML20083E451 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 12/23/1983 |
| From: | Koester G KANSAS GAS & ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| KMLNRC-83-168, NUDOCS 8312290221 | |
| Download: ML20083E451 (5) | |
Text
'
KANSAS GAS AND ELECTRIC COMPANY THE ELECTRC COMPANY 4LENN L MOESTER vtCE PREleDENT NUCLEAR December 23, 1983 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 KMLNRC 83,-168 Re:
Docket No. STN 50-482 Ref: Letter dated 12/16/83 from BJYoungblood, NRC, to GLKoester, KG&E Subj: Facility Staffing Survey
Dear Mr. Denton:
The Reference requested information on facility staffing for the Wolf Creek Generating Station. Attached is the completed statfing questionnaire that was provided to Mr. Joe Holonich on December 12, 1983.
Yours very truly, l
W Glenn L. Koester Vice President - Nuclear GLK:bb Attach cc: JHolonich (2), w/a BYoungblood, w/a WSchum, w/a l
8312290221 831223
/)
l PDR ADOCK 05000482 v
A PDR f
t 201 N. Market - Wichita, Kansas - mar Address: RO. Box 208 I Wictuta, Kansas 67201 - Teleohone: Area Code (316) 2616451
FACILITY STAFFING SURVEY PLANT Wolf Creek Generating Station Burlington, Kansas Anticipated Licensing Date 8/15/84 A.
OPERATING SHIFT 1.
No. of Shifts l6l 2.
No. of R0s Assigned to Shift Work l 18 l No. of Yrs. of Commercial RO Experience on Hot Plants (post-initial criticality)
No. of SR0s Assigned to Shift Work l 12 l No. of Yrs. of Commercial R0 Experience on Hot Plants BWR PWR l0l l0l No. of Yrs. of Commercial SRO Experience on Hot Plants BWR PWR 10I loI*
4.
No. of SR0s with 4-Yr Degrees Non-Engineering Engineering i11 I41 5.
No. of Shift Supervisors (SS)
Non-Engineering Engineering i1I I41 1
6.
Total USN Military Experience SRO's 88 1/2 Years **
l 7.
Total USN Military Experience RO's 59 Years **
8.
No. of Shift Consultants Assigned Per Shift 1
No. with Previous SRO 4
f No. with Previous RO 2
No. of Years of Commercial SRO Experience 4
No. of Years of Commercial R0 Experience 13 "One Shift Supervisor (SRO) had 4 1/2 years at S1W (PWR) Employed by Westinghouse as Plant Operations SS l
- This is Station Personnel and Excludes Shift Consultants.
l
ON-SITE MANAGEMENT Page 2 of 4 Superintendent Supt of of Reg, Quality Supt of Q.C.
STA Operations Adm. Services Plant Mgr.
Maintenance Supervisor To have license at time of OL Yes Yes No No No No Previously licensed RO/SRO No SRO SRO SRO No SRO Type Plant PWR I
PWR*l PWR#2 PWR*3 I
No. Years 6
16 20 1/2 17 No. Years " Hot" Exp.
1 1/2 9
10 11 i
See l
Degreed
- 4 Yes No Yes Yes No Type [ Discipline (s)]
USN Academy Nuclear Engineering EE l
l l
Level (A/B/M/D)
BS l
BS
_j BS
- 1:
4 Years Navy Nuclear Hot. 3 Years Navy New Construction
- 2:
2 Years Navy Nuclear Hot. 31/2 Years Navy New Construction m3: 7 Years Navy Nuclear Hot. 2 Years Navy New Construction
- 4: STAS -
1 - BS Electrical Eng 1 - BS Mechanical Eng 1 - BS Math 1 - BA Physics 1 - BS Nuclear Eng, MA Agr 2 - Non-Degreed
Page 3 of 4 CORPORATE NUCLEAR EXPERIENCE i
(i.e..."Off-Site" Management) 1 Yrs at Other Operator Lic.
Yrs. at Nuc. Support /-
Degrees
-(if ever held)
Oper. Nuc.
Management Level POSITION NAME NUC NAVY RO/SRO/None Stations Position (A/B/H/D)
Discipline (s>
]
(Yrs)
(On--Site)
(Off-Site)
(Indicate whether BWR or PWR) h Group V.P.
l Technical Services.l 9 PWR
!!echanical Eng:
V.P. Nuclear DIV VP G.L. Koester BS Mathematics
. Manager Nuclear f
f TECH SERV Services BS Eng. Physics q
Mgr R.C. Hagan 4
7 PWR MS, PhD Nuclear Eng.
j Mgr. Mechanical r
Engineering MAINT Mgr J.A. Bailey 4
l DIR NUCL OPS j OPER Mgr Wes Hartley##
8 SRO 10 PWR 6 PWR BS Management Nuclear Coordinator Technical E.W. Creel BS Electrical Eng Manager Nuclear j
l l
l l NUC ENG Plant Engineering
)
16 PWR BS, MS Mechanical Eng i
Mgr M.L. Johnson l
l l
Manager Nuclear l
l l
' DIR NUC Fuel Engineering l
l BS Eng. Physics FUEL SER l
R.M. Cherry l
l MS Mechanical Eng i
i
P ge 4 cf 4 CORPORATE NUCLEAR EXPERIENCE (i.e., "Off-Site" Management)
Yrs, at Other Operator Lic.
Yrs. at Nuc. Support /
Degrees (if ever held)
Oper. Nuc.
Management Level POSITION NAME NUC NAVY RO/SRO/None Stations Position (A/B/M/D)
Discipline (s
]
(Yrs)
L (On--Site)
(Off-Site)
DIR NUC Manager Licensing LIC G P Rathbun GRO' 3 PWR 5 PWR BS, MS Nuclear Eng QC/QA Director Quality Industrial Mgr R.M. Grant 4 PWR 4 PWR AA Management Manager Nuclear Safety OTHER M.A. Stewart 4
\\
Technical Staff Specialist - Corp. l Operations Business OTilER W.L. Mutz 7
GNavy Nuclear E00W Qualified.
ocKG&E is actively pursuing the filling of this position tith a full time KG&E employee.
Presently a consultant from MAC is filling this position on approximately a one-half time basis, i