ML20083E414
| ML20083E414 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/15/1983 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| DR-89, RGB-16-572, NUDOCS 8312290205 | |
| Download: ML20083E414 (1) | |
Text
I GULF ' STATES UTILITIES COMPANY POSTOFFICE BOX 2951 BEAUMONT, TEXAS 77704 AREA CODE 409 838-6631 December 15, 1983 RBG-16,572 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000
-Arlington, Texas 76011
Dear Mr. Collins:
River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-89 Gulf States Utilities Company has not completed its investigation of DR-89 concerning the RTE primary knife-type disconnect used on the Standby Diesel Generator. An interim or final status report will be provided by February 16, 1984.
Sinc,erely, a d' _ g~
~
J. E. Boo er Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l
NRC Resident Inspector-Site 0312h O
PDR i
S l
I i
.IE 27 TE-N i
l