ML20083E414

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-89 Re Rte Primary knife-type Disconnect Used on Standby Diesel Generator.Investigation Incomplete.Status Rept Will Be Provided by 840216
ML20083E414
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/15/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
DR-89, RGB-16-572, NUDOCS 8312290205
Download: ML20083E414 (1)


Text

I GULF ' STATES UTILITIES COMPANY POSTOFFICE BOX 2951 BEAUMONT, TEXAS 77704 AREA CODE 409 838-6631 December 15, 1983 RBG-16,572 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000

-Arlington, Texas 76011

Dear Mr. Collins:

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-89 Gulf States Utilities Company has not completed its investigation of DR-89 concerning the RTE primary knife-type disconnect used on the Standby Diesel Generator. An interim or final status report will be provided by February 16, 1984.

Sinc,erely, a d' _ g~

~

J. E. Boo er Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l

NRC Resident Inspector-Site 0312h O

PDR i

S l

I i

.IE 27 TE-N i

l