|
---|
Category:CONSTRUCTION PERMITS-APPLICATION & AMENDMENTS TO APP
MONTHYEARML20083D3631991-09-30030 September 1991 Application for Amend to CPPR-123,extending CP for 3 Addl Months Until 911231 to Provide Sufficient Time for License Processing ML20065K5711990-11-20020 November 1990 Application for Amend to CPPR-123,extending CP for 6 Months Until 910630 ML19332F5691989-11-27027 November 1989 Application for Amend to CPRR-123,extending Final Completion Date by 12 Months to 901231 to Assure That All License Processes Completed W/O Need to Request Addl Extensions,Per 891107 Original Amend Request ML19324C4311989-11-0707 November 1989 Application for Amend to CPRR-123,extending Final Completion to 900430 ML20196C7011988-11-23023 November 1988 Application for Amend to CPRR-123,extending Final Completion Date to 891231 ML20116N7981985-04-30030 April 1985 Amended Application for Cp,Relocating Site 130 Meters from Original Location ML20100L9181984-11-0909 November 1984 Application for Cp.General Info,Sar,Tech Specs,Emergency Plan & Eia Encl 1991-09-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20134M1601997-01-30030 January 1997 Application for Amend to License R-129,requesting to Change Word Plutonium to Polonium in Section 2.B(3) Line 3. Editing Error Occurred During Transcription & Did Not Create Any Violation on Part of Licensee ML20128G1081993-01-25025 January 1993 Application for Amend to License R-129,changing Number of Std Control Rods Subj to Simultaneous Withdrawal Interlock Requirements When Reactor in Modes Other than Manual Mode. Application Submitted to Address RO on 930119-22 ML20127M7081993-01-21021 January 1993 Correction to License R-129,changing Wording on Page 7-12 ML20083D3631991-09-30030 September 1991 Application for Amend to CPPR-123,extending CP for 3 Addl Months Until 911231 to Provide Sufficient Time for License Processing ML20065K5711990-11-20020 November 1990 Application for Amend to CPPR-123,extending CP for 6 Months Until 910630 ML19332F5691989-11-27027 November 1989 Application for Amend to CPRR-123,extending Final Completion Date by 12 Months to 901231 to Assure That All License Processes Completed W/O Need to Request Addl Extensions,Per 891107 Original Amend Request ML19324C4311989-11-0707 November 1989 Application for Amend to CPRR-123,extending Final Completion to 900430 ML20196C7011988-11-23023 November 1988 Application for Amend to CPRR-123,extending Final Completion Date to 891231 ML20116N7981985-04-30030 April 1985 Amended Application for Cp,Relocating Site 130 Meters from Original Location ML20111A3981985-02-27027 February 1985 Amend to Application for Ol,Revising Tech Specs Re Max Operating Power of 1,100 Kw,Max Pulse Insertion of 2.2% Delta K/K,Providing for 9,000 Ci Co-60 to Be Used in Reactor Pool as Gamma Irradiator & Issuing License to 5.8 Kg U-235 ML20100L9181984-11-0909 November 1984 Application for Cp.General Info,Sar,Tech Specs,Emergency Plan & Eia Encl 1997-01-30
[Table view] |
Text
. . . . --
.d
- '..,;;'$ DEPARThfENT OF AfECilANICAL ENGINEERING y c% f %, 5 L !,9 THE UNIVERSITY OF TEXAS AT AUSTIN
/*" (i. O ")l
-y ~% 'x '
NudearEnginaring Takglabora:wy'10100 Burnet %d Austin, Ta.a 78738
- q. AM
~ ,.;
. (312)4713787
- Fhh*(312)471-4589 Docunent Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Construction Permit Renewal CPRR-123 Docket 50-602 Attn: Al Adams Project Manager Norpower Reactor, Decommissioning and Environmental Directorate
Dear Sir:
The University of Texas at Austin requests the extension of the construction permit, CPRR-123, for docket 50-602, for three additional months to December 31, 1991. The extension, at the request of NRC staff, is necessary to provide sufficient time for license processing.
Current permit expiration is 10/31/91.
Several amended pages to the Safety Analysis Report will be sent by separate letter. Please refer questions regarding the Safety Analysin Report submittal to Thomas L. Bauer at 512/471-5787 Sincerely, MI Thomas L. Bauer Assistant Director Nuclear Engineering Teachir.g Laboratory APPROVED:
Bf.asad W-(J Bernard W. Wehring, irector Nuclear Engineering Teaching Laboratory c.: G. Fonken H. Woocicon K. Diller H. C. Lott t
c i 9109300229 910930 mL0)0 .
- PDR ADOCK 05000602 i.\u l A PDP 11
( li
w p i
1
., j UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of (
k The University of Texas (
at Austin ( Docket No. 50-602 Balcones Research Center (
Nuclear Engineering Teaching (
Laboratory (NETL) (
AFFIDAVIT Gerhard J. Fonken being dul,' sworn, hereby deposes and says that he is Executive Vice President and Prcvost, The University of Texas at Austjn; that he is duly authorized to sign and file with the Nuclear Regulatory Comnission the extension request to December 31, 1991, for docket 50-602 and Construction Permit CPRR-123; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief, O Al Ogu%
/i>erhardJ..F>nken Execut.ve Vice President and Provost STATE of TEXAS (
-Subscribed and sworn to before me, a Not6ry Public in and for the State of Texas, this 24th day of September ,
19 91 ,
1-
[ 0, }j) . l'n 0.t l1!/J'
-NO}'l&Y PUBLIC in and for the State of Texas
__ _ _