Errata to Amend 160 to License NPF-6,including Changes to TS Page 6-13
ML20083D182
Person / Time
Site: Arkansas Nuclear 
Issue date: 05/19/1995
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20083D186 List:
References
NPF-06-A-160 NUDOCS 9505240449
Download: ML20083D182 (1)


Text

.

l

\\

ADMINISTRATIVE CONTR01.8 e

6.7 SAFETY LIMIT VIotATION 6.7.1 -The following actions shall be taken in the event a safety Limit-is violated:

j a.

The unit shall be placed in at least HDT STANDNY within one hour.

b.

The Vice President, Operations ANO and the SRC shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The Nuclear Regulatory Commission shall be notified pursuant to c.

10CFR50.72 and a report submitted pursuant to the requirements of 10CFR50.36 and Specification 6.6.

6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced belows The applicable procedures recommended in Appendix "A" of a.

Regulatory cuide 1.33, Revision 2, February 1978.

b.

Refueling operations.

Surveillance and test activities of safety related equipment.

c.

d.

(Deleted)

I e.

(Deleted) f.

Fire Protection Program implementation.

g.

Modification of Core Protection Calculator (CPC) Addressable Constants. These procedures should include provisions to assure that sufficient margin is maintained in CPC Type I addressable constants to avoid excessive operator interaction with the CPCs during reactor operation.

FOTE:

Modifications to the CPC sof tware (including changes of algorithms and fuel cycle specific data) shall be performed in accordance with the most recent version of "CPC Protection Algorithm Software Change Procedure,"

CEN-39(A)-P that has been determined to be applicable to the facility. Additions or deletions to CPC addressable constants or changes to addressable constant software lindt values shall not be implemented without prior NRC approval, h.

New and spent fuel storage.

1.

ODCH and PCP implementation.

j.

Postaccident sampling L (includes sampling of reacter coolant, radioactive iodines and particulates in plant gaseous effluent, and the containment atmosphere).

6.8.2 Each procedure of 6.8.1 above, and changes in intent thereto, shall be reviewed and approved as required by the QAMO prior to implementation and reviewed periodically as set forth in administrative procedures.

s 9505240449 950519 PDR ADOCK 05000368 P

ARKANSAS - UNIT 2 6-13 Amendment No. 44,Gb,43, M,M,44, M, M,44, M, M, M4, RF, +M, He,160