E, VEGP PLANT REVIEW BOARD NEETING NINUTES GPC EXHIBIT 47
}
db-1JN,/v25 -044'J Y/2.//gs jg-p7
~ FREDERICK EX. B i
NERTING NO.
90-66 DATE 5/8/90 PAGE 1
0F 2
TITING CONVENED 9:15 AM/PN; MEETING Ah70URNED 1k','00 AN/PH s
(
- VTA TELECON)
THIS MEETING CHAIRED BY:
~95 f1AY -3 P2 36
() CHAIRMAN (X) VICE CHAIRMAN A. L..Mosbaugh VOTING MENBERS PRESENT:
J. G. Aufdenkampe (f[E'.[ Swart 3Vinl' der H. Handfinger M. W. Hdrson PRB SECRETARY W. C. Gabbard NON-VOTING MEMBERS PRESENT:
G. R. Frederick VOTING ALTERNATES PRESENT:
I. A. Kochery FOR R. L. LeGrand FOR NON-VOTING ALTERNATES PRESENT:
FOR FOR FOR FOR FOR GUESTS / TECHNICAL ADVISORS:
N. K. Seith T. E. Webb T. '-
Greene mu PRB ACTION ITEMS OPENED:
90-66-01 PR8 ACTION ITEMS CLOSED:
None PRB MINUTES APPROVED None
/
Nu MY I
PRB SECRETARY PRS CHAIRMAN CC: Nk : RESIDENT INSPECTOR (FORM NAME=PRBAGEND) 9505230217 950421 PDR ADOCK 05000424 FP[@.
F.,.
i e
a I
i l
l I
i l
NUCLEAR REGULATORY COMMISSION l
yo 92 V-et A -1 I' N ~ 'O Docht No. 53-m e.3 Official Exh. No.
. In the mater of thg+lt ot 4.s s_a
- Staff IDENTIFIED v
Applicant s'
RECEtVED V
Intervenor REJECTED Contg Oftr l
Contractof DATE o 4-1 I 't E Other Witness Fe,< h r f c k Reporter
.T.
2.'ll,3k:
i 4
y
/
9 PRS 90-66 i
Page 2 of 2 PR$ NEETING NINUTES CONTINUATION 8585T A.
The following items were unanimously recommended for approval with comment.
No unreviewed safety question involved.
LER 1-90-11
" Manual Reactor Trip Due to Inadvertant closure of Main Feed Regulating Valve".
Sections D & F (Cause and l
corrective Actions) - Remove references to labeling and locking device.
HQIEt PR8 Action Item 90-66-01 issued to Trip Reduction Committee to re-evaluate Trip Masards' and Single Point Tripe (Ref. review of LER 1-90-11).
Report results to PRB.
LER 1-90-6, Rev. 1
" Loss of Offsite Power Leads to site Area Emergency".
Section D (cause of Event) i clarity what comprehensive Test Program means.
consent to PRB minutes of 5-8-90 by G. R. Fredericks i
Do not concur that 11 diesel starts " subsequent to the test program" as stated in last paragraph of section E, page 6 of 8, for DG1A is accurate.
Based on the information presented to the board start #39 completed the program using T-ENG-90-016 which makes 11 an incorrect value.
Without further review I would agree 6 successful starts were made starting on 4/6/90 at 2347.