ML20083C993

From kanterella
Jump to navigation Jump to search
Applicant Exhibit A-26,consisting of Transcript of Audiotape 53,transcribed by Jj Bragg
ML20083C993
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/21/1995
From:
AFFILIATION NOT ASSIGNED
To:
References
OLA-3-A-026, OLA-3-A-26, NUDOCS 9505230207
Download: ML20083C993 (4)


Text

r- 7 f ,

[ GPC EXHIBIT 26

. STRINGFELLOW EX. C w .

00CKETED 1

USHRC flVCLEAR REGULATORY COMMISSION MY -3 P2 :52 occat uo. E N)NE riciaigxn. 0t No._6A 26 2 in the rnattar of Uos+ k da :&S I+R OFFICE OF SECTIE TARY Staff IDCNTIFIED v 3

00CKE TING & ' ER'/lCE Appl. cant 7 HECEIVED #

MCH intervenor REJECTED 4

Conr0 Offr 5 Contractor DATE D 4" 2. 8 - 4 Y Other Witness 5*i.w" Sedos 6 Reporter 7 2: U45ki 7

8 9

10 Transcript of audiotape No. 53,

~

11 transcribed by Judy J. Bragg, Certified Court 12 Reporter and Notary Public.

13 14 15 16 17 18 19 20 21 22 23 BROWN REPORTING, INC.

24 1100 SPRING STREET, SUITE 750 ATLANTA, GEORGIA 30309 25 (404) 876-8979 9505230207 950421 PDR ADOCK 05000424 y PDR

t 7

(APPROXINATELY 704 THROUGH SIDE B) 1 MOSSAUGH: Bill, what can I do for you?

2 SHIPMAN: We are trying to, as you know, 3 to get these two LER's out (inaudible) the LER on the event. I understand 4 from Jack that we are using an LER as a report of a

5. valid diesel generator failure as well as LER. l 6 MOSBAUGH: That's right, the LER on the l 7 50.73 reportability requirements.

8 SHIPMAN: Right. To do that, the report 9 requires us to submit the number of diesel generator l

. 10 tests, valid tests in the last 100 tests.

11 MOSBAUGHz Right. There is a statement 12 to that effect in the Corrective Action section.

13 SHIPMAN: The problem that Jack (Stringfellow) has is 14 that we don't have any records in the diesel 15 generator log of the tests that were conducted after 16 the 13th of March.

17 MOSBAUGHz 'I think there were so many is starts and tests and all that that I know the one log 19 that we track that with down here has not had time 20 to catch up yet, but there are records of all the 21 starts and they're tabulated in a couple of different 22 places.

23 SHIPMAN: But they are not included in 24 this LER.

25 MOSBAUGHz I think that's true, but I I

ue

  • l

)

i 8 )

1 think they were going to get a look at that, or when the l

2 PRS reviewed that, that was a PRB comment.

The information Jack has got 3 SHIPMAN:

4 was that we can't get that, you know, we are not 5 going to have that, and I don't really see how we 6 are going to meet our reporting requirement unless 7 we have that information in this LER, do you?

8 MOSBAUGH: Well, the only issue would be, 9 it obviously needs to be contained in the LER. But 10 the only question would be up to what date and

, 11 effective what date.

12 SHIPMAN: But we are reporting a failure 13 on the 20th. So --

14 MOSBAUGH: Right. It certainly needs to 15 be up through then.

16 SHIPMAN All right. I think it we can 17 just say through the 20th --

18 NOSBAUGH Through the 20th, that's no 19 problem at all.

20 SHIPMAN: Apparently it is from somebody, 21 and that's why I called you for some help.

22 MOSBAUGH: I don't think that's a problem 23 at all. Let me find out why that's a problem for 24 anybody. I think it becomes more difficult to make 25 statements, you know, up to today.

1 J

a

, . - , - , - . , ,,c . . , , - . - - - - . , - , - . - . ~ , - . - - - - - _ _ - _ - -

ll; e - .,

9 i SHIPMAN: Right. I understand. What we 2 can do, you know, on the LER is, we can say through 3 the 20th.

4 MOSBAUGHz I see where that should be no 5 difficulty at all.

SHIPMAN: Would you see. . . -

MOSBAUGH: I will get that fixed, and I 6 will have Aufdenkampe call information or 7 confirmation back to Stringfellow.

8 SHIPMAN: Great. I appreciate it Allen.

9 MOSBAUGH Okay.

10 SHIPMAN: Bye.

11 MOSBAUGH: Bye.

12 * * *

  • 13 (End of Tape No. 53, Side B).

14 15 16 17 l

18 19 20 21 22 23 24 25

- .-