ML20083C986
| ML20083C986 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/21/1995 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-3-A-024, OLA-3-A-24, NUDOCS 9505230203 | |
| Download: ML20083C986 (2) | |
Text
-!{2h/25 -DLA.3 YZI U
GPC EXHIBIT 24 Q@Jgp EX. A
SUMMARY
OF PROFESSIONAL QUALIFICATIONS USNRC NORMAN JACKSON (JACK) STRINGFELLOW MY -3 P2 :52 Formal Ednention:
i 09/77 - 12/78 Auburn University - Master of En#ssisg?F MedaiiiicaRY Engineering JOCKEiING A SERVICE BRANCH 09/72 - 08/77' Auburn University - Bachelor of Engineering, Mechanical Engineering Work History:
10/88 - Present Project Licensing Engineer Vogtle Project - Licensing Responsible for processing general correspondence with the NRC (e.g., Licensee Event Reports (LERs), proposed amendments to the operating licenses, replies to Notices of Violation, Special Reports, etc.) and other communications with NRC's Office of-i Nuclear Reactor Regulation.
07/84 - 09/88 Senior Licensing Engineer Southern Company Services, Inc.
^
Responsible for development of Vogtle Electric Generating' Plant (VEGP) Unit 1 Tectnical Specifications (TS); day-to-day licensing activities relative to obtaining the VEGP Unit 1 operating license; safety evaluation review and preparation and development of proposed amendments for the Farley Nuclear Plant.
07/82 - 06/84 Licensing Engineer I Southern Company Services, Inc.
Responsible for development of VEGP Unit 1 TS; attended VEGP Operating Training Course at VEGP site; preparation of Hatch Unit 1 and Unit 2 initial Final Safety Analysis Report (FSAR) updates.
06/80 - 06/82 Licensing Engineer II Southern Company Services, Inc.
Responsible for preparation of initial Hatch Unit I and Unit 2 FSAR updates.
10/78 - 06/80 Southern Research Institute Responsible for obtaining thermal and mechanical properties of materials.
9505230203 950421 PDR ADOCK 05000424 0
i L
NUCLEAR REGULATORY COMMISSION f4-914.e(A-1 DodelNo to-HT.eu 1 Oftcial Exh. No. S Ed 29._
h t!16 matter of t/c s 4 le_
LA424 5
(* 2 St?ff IDENTIFIED v
. RECEIVED v
Apt cant h!ctvenor.
REJECTED Contg Ottt Contractor DATE 6 'l - 1 8 - 4 5' Other w arss
.S t wfe IL Reporter
- 9. 2.'l.%, R
..