Text
_
1901 Chouteau Avenue j
Post Office Box 149
-h St Louis. Maso<ni63166 i
314 554 2650 t
May'16,1995
, [;,$fgj,y, P3 Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P1-137 l
. Washington, DC 20555 ULNRC-3213 Gentlemen:
DOCKET NUMBER 50-483 -
4 CALLAWAY PLANT RADIOLOGICAL EMERGENCY RESPONSE PLAN CHANGES Enclosed are copies of Change Notices 94-07 and 95-01 to Rev.17 of i
the Callaway Plant Radiological Emergency Response Plan (RERP). These changes
.l' were implemented on May 3,1995, in accordance with Callaway Plant procedures and 10CFR50.54(q).
The Change Notices cover changes made to the Callaway Plant radio -
q and telephone systems, changes regarding the provision of medical support for.
)
injuries or illnesses involving radiological contamination at the Callaway Plant (removal of RMC and the addition of REAC/TS as consultation resources), and minor wording changes requested by Quality Assurance regarding the annual
]
Nuclear Safety Review Board independent review.
These Change Notices do not impact the effectiveness of emergency preparedness for the Callaway Plant. The Plan continues to meet the standards of 10CFR50.47(b) and the requirements of 10CFR50.54(q).
These changes will be incorporated into Rev.18 of the RERP, which has already received NRC approval. Rev 18 will be issued on June 30,1995.
i Very truly yours,
/
9505230045 950516 s
fDR. ADOCK 0500 3
Donald F. Schnell l
.lPk
-mcw
+4r
w'w-a
,4 I
e A
9 e
DFS/JDN/MRF/bjp
. I l
1 1
{
cc:
J. B. Martin (2 copies w/a)
Regional Administrator USh7C Region III B. L. Bartlett w/a
' Resident Inspector, Callaway L. R. Wharton (2 copies w/o)
Licensing Project Manager, Callaway Plant USNRC, Washington DC M. J. Farber w/o Chief, Reactor ProjectsSection III A USNRC Region III J. E. Foster w/o Senior Emergency Preparedness Analyst USNRC Region III Manager Electric Department w/o Missouri Public Service Commission Thomas Baxter w/o Shaw, Pittman, Potts & Trowbridge
.