ML20083C759
| ML20083C759 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/16/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| GN-296, NUDOCS 8312270010 | |
| Download: ML20083C759 (5) | |
Text
,9 e.
Georgia Power Compary s
333 Piedmont Avenue Atlanta. Georgia 30308 Telephone 404 526 7726
. Ma, Lng Address' Post Off.ce Box 4545 At!anta, Georg:a 30302 h
Georgia Power D. O. Foster the southern etcc system Vice Premdent and General Manager Vogt:e Project December 16, 1983 File: X7BC35, X7BD02 Director of Nuclear Reactor Regulation Attention Ms. Elinor G. Adensam Log: GN-296 Licensing Branch No. 4 Division.of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Enclosed is the response to a facility staffing survey telecopied to Georgia Power Con any by Ms. Miller of your staff. This response was telecopied to Ms. Miller on December 9, 1983.
Should you have any questions about the suseey, please inquire.
You s truly, I
e D. O. Foster DOF/ JAB /sw Enclosure
.xc:
R. A. Thomas D. E. Dutton O. Batum G. Bockhold, Jr.
J. A. Bailey G. F. Trowbridge, Esquire M. A. Miller l
L. T. Gucwa l
[
60o\\
(
\\
t \\
l
[
8312270010 831216 l
PDR ADOCK 05000424 A
l PM
.?
e QUESTIONNAIRE FACILITY STAFFING SURVEY The attached survey has been prepared to assist in developing the expected staffing profile for your facility that will be in place at the time you are. ready to obtain an operating license.
Pl. ease fill in the blanks with
.the best information available.
I
L P283 1 of 3 FACILITY STAFFING SURVEY PLANT Vogtle Anticipated Licensing Date Unit 1, 9/1/86 Unit 2, 3/1/88 A.
OPERATING SHIFT 1.
No. of Shifts 5
2.
No. of R0s Assigned to Shift Work 25 No. of Yrs. of Commercial RO experience og BWR PWR Hot plants (post-initial criticality) 0 0
3.
No. of SR0s Assigned to Shift Work 15 No. of Yrs. of Commercial RO experience on BWR
- PWR Hot plants 0
0 No. of Yrs. of Commercial SR0_ experience on BWR PWR Hot plants 0
0 4.
No. of SRos with 4-yr degrees
- Non-engineering Engineering or Science 25 5.
No. of Shift Supervisors (SS)
- Non-engineering Engineering or Science 5
Note: SS is senior authority on shift work.
- Personnel who do not have an engineering or science four (4) year degree will have one (1) year of.R0 experience.
PJg2 2 of 3 B.
ON-SITE MANAGEMENT
' ACTUAL 12/9/83 Fill in Table (Use Appropriate Titles)
Superintendenti Assistant Superintendent.
STA Operations Plant Mgr.
Plant Mgr.
Maintenance QC Supervisor (3)
(3)
To have license at time of OL NO YES NO NO NO NO Previously licensed RO/SRO NO NO SRO SRO NO NO Type Plant N/A N/A EWR BWR-W N/A N/A (1) No. Years 2
8 15 17 9
12 (2) No. Years " Hot" Exp.
8 13 16 8
11 Degreed YES YES YES YES YES NO Type (Discipline (s))
Engin.
Engineering Engineering Engineering Engineering N/A or or or or or Science Science Science Science Science
~
Level (A/B/M/D)
B B
B B
B N/A (1) Power Plant Experience (2) Nuclear Power Plant Experience.
Included in Power Plant Experience ( ).
(3) PM/APM will meet requirements to stand for license.
Pig 2 3 cf 3' p
CORPORATE NUCLEAR EXPERIENCE
.)*
(i.e. "Off-Site" Management)
Yrs. at Other Operator Lic..
Yrs. at Nuc. Support /
Degrees (if ever held)
Oper. Nuc.
Management Level RO/SRO/None Stations Position
'(A/B/M/D)
POSITION
- NUC NAVY NAME Discipline (s)
(Yrs.)
(On-Site)
.(Off-Site)
S:nior VP -
B M.E.
Power Gen.
Head 6
15 M
B.A.
VP and Gen.
Mgr.-Nuc. Gen.
4 B
Ch. E.
Manager-Power Gen. Services Bohler 11 B'
~E.E.
Mgr.-Nuclear Training
BS Nuc. Ops.
Anal. Mgr.
5 B
I.E.
Mgr. Nuc. Chem.
BA
~ Physics
& Health Phys.
Ewald SRO TEST RX 10 MS, MS
' Physics, M.E.
Mgr.-Nuclear BS
'N.E.
Engineering &
MS
'N.E.
Chief Nuc. Eng.
B.A.
Gen. Manager
,BS Biology F_uel Services Ratcliffe 4
J.D.
N.
Reg.
En
.ng. Mgr.
Baker 11 BS N.E.
Gt.n. Mgr. -
QA & Health Physics Rice 20 2
B' M.E.
Mgr.-Nuclear Performance Manry BWR SRO 4
6 B
M.E.
- Position titles shown are illustrative; please enter appropriate titles