ML20083C753

From kanterella
Jump to navigation Jump to search
Forwards Required Responses Re Facility Staffing Survey,Per NRC 831219 Request
ML20083C753
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/19/1983
From: Schnell D
UNION ELECTRIC CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
ULNRC-705, NUDOCS 8312270006
Download: ML20083C753 (4)


Text

r UNION ELECTRIC COM PANY 1901 GRATIOT STREET ST. Lou t S, MISSOURI MAILING ADDRESS:

o[^f,,l;ll,"f,m-December 19, 1983

,,, coOf f,,*,'f,*,,,,,,

Mr.

B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Youngblood:

ULNRC-705 CALLAWAY PLANT UNIT 1 FACILITY STAFFING SURVEY Pursuant to your request for information on facility staffing, received on December 19, 1983, the attached provides the required responses.

In addition the attachment was telecopied to the office of Mr. Joseph Holonich, the SNUPPS Project Manager, on December 12, 1983.

Very_truly yocrs, Y

A Donald F.

Schnell DJW/lw Attachment cc:

D.

F.

Schnell R. J.

Schukai S. E. Miltenberger D. W.

Capone A. C.

Passwater

.D.

E.

Shafer D. J. Walker N. Date DFS/ Chrono 3456-0021.6 w/a Missouri Public Service Commission 8312270006 831219

  • I DR ADOCK 05000483 A

PDR

QUESTIONNAIRE Page 1 of 3 FACILITY STAFFING SURVEY The attached survey has been prepared to assist in developing the expected staffing profile for your facility that will be in place at the time you are ready to obtain an operating license. Please fill in the blanks with the best information available.

TELECOPY RESPONSE REQUESTED ON FRIDAY DEC. 9, FORMAL DOCUMENTATION LTR BY FRI. DEC. 16, 1983 FACILITY STAFFING SURVEY PLANT Callaway Plant, Unit 1 Anticipated Licensing Date 4/2/84 A.

OPERATING SHIFT 1.

No. of Shifts 6

commercial / commercial +

15 2.

No. of Ros Assigned to Shift Work Navy No. of Yrs. of Commercial RO experience on BWR PWR Hot plants (post-initial criticality) 3.

No. of SR0s Assigned to Shift Work 22 No. of Yrs of Commercial RO experience on BWR PWR Hot plants No. of Yrs of Commercial SRO experience on BWR PWR Hot plants 4.

No. of SR0s with 4-yr degrees Non-engineering Engineering 4

3 Same

~

5.

No. of Shift Supervisors (SS)

Non-engineering Engineering people l4 3

I Note: SS is senior authority on shift work.

  • Excludes Management and Training supervisory personnel
    • The RO & SRO shif t personnel hve a total of 41 years of naval experience
      • Excludes Management and Training supervisory personnel totaling 7

B.

ON-SITE MANAGEMENT Pcgm 2 of 3 Fill in Table (Use Appropriate Titles)

Assistant Manager Superivising Engr Superintendent Operations &

Superint.

Asst. Mgr ISEG Operations Maintenance Plant Mgr.

Maintenance QA To have license at time of OL NO YES NO NO NO NO Previously licensed RO/SRO NO NO NO NO NO NO Type Plant No. Years No. Years "llot" Exp.

Degreed Type (Discipline (s))

BS/EE. MS/NE BS/ME BS/EE BS/EE BS/ME BS/ME Level (A/B/M/D)

PhD/NE MS/NE Advisor to Plt. Mgr. - D. C. Poole - BS/Ceneral Engineering, SRO on PWR for 2.5 years, Plt. Mgr. on PWR for 2.5 years

F C,

Pig, 3 cf 3 CORPORATE NUCLEAR EXPERIENCE (i.e., "Off-Site" Management)

Yrs. at Other Operator Lic.

Yrs. at Nuc. Support /

Degrees (if ever held) Oper. Nuc.

Management Level POSITION

  • NAME NUC NAVY RO/SRO/None Stations Position (A/B/M/D)

Discipline (s)

(Yrs)

(On-Site)

(Off-Site)

(Indicate whether BWR or PWR)

VP, Nuclear

1. F. Schnel l 0

None None 13 yrs.

MS Mechanical Engineerica General Manager, Engineering R.J. Schuka i 0

None None 8 vrs.

MS Electrical Ennineerinn Manager, Nuclear Engineering 3.W. Capone O

None None 11 yrs.

BS Mechanical Engineering Asst to VP J.F. McLauglilin 0 None None 4 yrs.

BS Mechanical Engineering Mgr. Nuclear BS Electrical Engineering Fuel Ser D.E. Shain 0

None None 8 yrs.

MBA Business Administration Supt.

BS Mechanical Engineering Lic A.C. Passwater 5 yr None None 12 yrs.

MBA Business Administration Mgr. QA F.L. Field 0

None None 12 yrs.

BS Electrical Engineering Supv. Engr, Reactor Systems BS Nuclear Engineering

& Safety Analv.

U.B.Bobnar 0

None None 7 yrs.

MS Mechanical Engineering

  • Position titles shown are illustrative; please enter appropriate titles s

e

.