ML20083B867
| ML20083B867 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/12/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | UNION ELECTRIC CO. |
| Shared Package | |
| ML20083B869 | List: |
| References | |
| NUDOCS 8312210324 | |
| Download: ML20083B867 (2) | |
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
7590-01 UNITED STATES HUCLEAR REGULATORY CC!'!11SSION UNION ELECTRIC COMPANY CALLAWAY PLANT, Uf4IT N0. 1 DOCKET NO. STN 50-483 i
ORDER EXTENDING CONSTRUCTION COMPLETION DATE Union Electric Company is the holder of Construction Permit No. CPPR-139 issued on April 16, 1976 by the U. S. Nuclear Regulatory Commisson for construc-tion of the Callaway Plant, Unit No. 1 located in Callaway Ccunty, Missouri.
By letter, dated October 28, 1983, Union Electric Company filed an appli-cation for extension of the latest construction completion date for the Callaway Plant, Unit I:c. 1 Construction Permit.
It was requested that Construction Pernit CPPR-139 be extended from December 31, 1983 to June 30, 1985. The reasons given for the requested extension in time were: (1) the exacting nature of the work during latter stages of construction; (2) the slow pro-gress of construction due in part to increasingly stringent quality require-ments; and (3) nurrerous changes and additional requirements for plant design, including those required as a result of the Commission's regulatory review of the Three liile Island accident.
f This action involves no significant hazards consideration, cood cause has f
been shown for the delays, and the requested extensior.is for a reascnable period, the bases for which are set forth in the staff's safety evaluation for this extension.
O$$$$$h3 4
7590-01 The Commission has determined that this action will not result in any sig-nificant environmental impact and, pursuant to 10 CFR 51.5(d)(4), an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with this action.
The applicant's letter, dated October 28, 1983, and the NRC staff's safety evaluation supporting the Order are available for public inspection at the Com-mission's Public Document Room, 1717 H Street, N. W., Washington, D. C.
20555 and at the Fulton City Library, 709 Market Street, Fulton, Missouri.
IT IS HEREBY ORDERED that the latest construction completion date for CPPR-139 be extended from December 31, 1983 to June 30, 1985.
FOR THE NUCLEAR REGULATORY COMMISSION erisir.nl i p-Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance: DEC 12 93 (l /
LB#1:0 0 LB OElg f
- BJYo igblood f
LBr AD:L:DL D:D ;
MRushB dk:kab JH ich TNovak DEis%nh,ut 11/)(/83 11/
/83 11/ r /83 13/ g /83 11/7/83 U/05 /83