ML20083B298

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 4 to ERP-220,Rev 7 to ERP-230,Rev 7 to ERP-510 & Rev 4 to ERP-810.W/910919 Release Memo
ML20083B298
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/05/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083B302 List:
References
NUDOCS 9109250028
Download: ML20083B298 (3)


Text

. _ _ _ _ _ _.

NUCLEAR RLGUL AIORY COMMISSlotJ 1

usm90 ton o c.totu k,,

September 19, 1991 50-277/278 Peach Bottom MEFORAriDUM TOR:

Chief, Document Control Branch, IRM FROM:

Director. Division of Freedom of Infonnstion and Publications Services. ADM

SUBJECT:

REVIEW 0F UllLITY EMERGENCY PLAN DOCUMENTATION The Division of Treedom of Infonnation and Publications Services has reviewed the attached document and has detennined that it may now be e,ade publicly available.

,8b ; <u - f/<bbre d.,

Donnie H. Grimsley, Director Division of freedom of Infonnation and Publications Services Office of Administration H

l l

91092500Ps 910905 I

PDR ADDCK 0S000277 F

PDR (1 f(

l y Vi 7: c y; 5

10 CPR 50 App 3ndix E,Section V PillLADEl..PillA EI,ItTRIC COMi%NY NUCLEAR GROUP 11EADQUARTERS 955 65 CllESTERBROOK HLVD.

WAYNE. PA 19087 5691 (215) 640 6000 Nectr AR tsciNrtntNo a $ravict.s torgrutui September 5, 1991 Docket flos. 50-277 50-270 License fios.

DPR-44 DPR-56 U.S. 14uclear Regulatory Commission Attnt Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures Dear Sirt Enclosed is revision 67 to the Emergency Response Procedures ior Peach Bottom Atomic Power Station, Units 2 and 3.

These procedures are being submitted in accordance with 10 CPR 50.54(q), 10 CFR 50 - Appendix E, and 10 CPR 50.4.

The following revised procedures are enclosed.

ERP-220 Hev.

4

" Operations Support Center gOSC) Operations Personnel" ERP-230 Rev.

7

" Operations Support Center (OSC)

Activation" ERP-510 Rev.

7

" Personnel Accountability" ERP-BIO Rev.

4

" Damage Hepair Group" In accordance with 10 CFR 2.790(a)(6), we request that names and telephone numbers in the above procedures be withheld fron public disclosure since such disclosures would constitute an unwarranted invasion of the personal privacy of the individuals involved.

/.

,??

e

  • Pocch Bottom Atomic Power Station September 5, 1991 Ernstgency Plan Implementing Proceduron Page 2 If you have any questions or require additional information, please do not hesitato to contact. us.

Very truly yours, 4$u

/.h G. J. I, ek, Manager Licensing Section Nuclear Engineering 1. Services 4

Enclosure cc T. T. Martin, Administ.rator, Hogion I, USNRC (2 copios)

J. J. Lynsh, USNRC Senior Resident Inspector, PBAPS I

y,.,.

_.,.--:....~

.-,,._.,.s

.._,.,.,,,w c~,~...

ACCElliRATED DISTilll5UTIOS 15EMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBRi ^ 10"i ? O 2 E DOC.DATE: 91/09/05 NOTARIZED: 11 0 DOCKET 4 FACIL 50-277 Peach Bottom Atomic Power Station, Unit 2, Philadelph 05000277 50-278 Peach Bottom Atomic Power Station, Unit 3, Philadelph 05000278 AUTil.NAME AUTl!OR ATFILIATION BECK,G.J.

Philadelphia Electric Co.

RECIP.NAME RECIPIENT AFFILIATION N

Document Control Branch (Document Control Desk)

SUBJ ECT: Forwardo Contral Files version of' revised EPIPs, including I

Roy 4 to ERP-220,Roy 7 to ERP-230,Rev / to ERP-510 & Rev 4 to ERP-810. Withhold.

D MY h

S DISTRIBUTION CODE: AX45D COPIES RECCIVEDtLTR d ENCL SIZE:

TITLE: Emergency Plan or Implementing Procedures (Propractary)

/

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /! LAME LTTR ENCL D

PD1-2 PD 1

1 MI LAlio, P.

I 1

b bD 1

1 AEOD/DOA/IRB 1

1 O

INTER!lAL:

/ I NNN7DntT7Prph9D 1

1 rec RILE 01 1

1 S

R I

D S

/

A D

D Nt)t1 n > Al l "Rilw" Ri cll*ll N is-S l'1 ! Nsl Hi ! P t w i< RI in t i u oli ! ( (Wi v 'I 1111 lxicr\\tl Ni ( ONI Rol til SL.

1:f n i\\1 l'1 r tl N 1. 7,irm 1. i i ! l\\tlN \\ll YOl'k N \\\\11 110 )\\1 til%I Riitt 'l lON i Is i s I OR ik K 1 N11.N1 s T i,l.

lx N 1 NI l lr i

TOTAL NUMDER OF COP 1ES REQUIRED: LTTR 6

ENCL 6

i l

-