Submits Final Test Results for Operational Adequacy of Safety/Relief Valves in Response to NUREG-0737,Item II.D.1. Facility Employs Two Stage Target Rock Valves.Requirements Complete
ML20083A751
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/25/1983
From: Mittl R
Public Service Enterprise Group
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM NUDOCS 8312200394
Download: ML20083A751 (2)


Text

-

>: o Pubhc Serwce l O PS G Company Electne and Gas MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 80 Park Plaza, Newark, NJ 07101/ 201430-8217 Robert L. Mitti General Manager d Nuclear Assurance and Regulation October 25, 1983 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention: Mr. Albert Schwencer, Chief Licensing Branch 2 Division of Licensing Gentlemen:

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 TRANSMITTAL OF SAFETY / RELIEF VALVE ( S/RV) OPERABILITY TEST REPORT

References:

1) Letter f rom T. Dente (BWR Owners' Group) to D. G. Eisenhut (NRC), " Transmittal of Valve Operability Test Report for the Generic BWR Sataty/ Relief Valve (SRV) Tes t
2) -Letter from T. Dente (BWR Owners Group) to D. G. Eisenhut (NRC) , " Preliminary Safety / Relief Valve (S/RV) Operability Test Results for Hope Creek Generating Station" dated July 1, 1981.

In response to NUREG 0737 Item II.D.1, this letter provides the final test results which demonstrate the operational adequacy of the S/RV's for Hope Creek Generating Station.

In addition, the adequacy of the S/RV discharge piping and supports has also been demonstrated. These final test results are contained in' NEDE-24988-P, " Analysis of Generic BWR Safety / Relief Valve Operability Test Results" which was submitted to the NRC via Reference 1. Public Service Elec-tric and Gas Company is a participant in the BWR Owners Group generic S/RV operability test program.

The Hope Creek Generating Station employs the two (2) stage Target Rock type of S/RV. The applicability of the generic test results to this plant's S/RV's has already been demon-strated in Reference 2.

0 8312200394 831025 PDR ADOCK 05000354 PDR g

0 A mm am m g

Director of Nuclear 10/25/83 Reactor Regulation A-review of the test report shows that the operational adequacy of the S/RV's and the piping and supports for the Hope Creek Generating Station has been demonstrated for the conditions defined in Item II.D.l. The submittal of NCDE-24988-P and this ~ letter satisfies the October 1,1981, and January 1, 1982, submittal requirements of Item II.D.1 and . completes Public Service Electric and Gas Company efforts on this item.

Very truly yours, Encl.

CC: D. H. Wagner - w/ encl.

USNRC Licensing Project Manager DKl9 1/2

- .. . .- -. .