Forwards Braidwood Nuclear Station Unit 1 Fourth Refueling Outage (Mar-Apr 1994) SG ISI Results
ML20083A242
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 04/26/1995
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083A245 List:
References
NUDOCS 9505100122
Download: ML20083A242 (1)


Text

Q)mmonwealth IMimn Company liraidwcod Generating Station Houte 01. Ik)x 81 liraccrille. IL 60107M19 Tel H15-15&2H01 April 26,1995 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Comed Braidwood Station Unit 1 Fourth Refuel Outage Steam Generator Inservice Inspection Report =

Docket No.

References:

(1) NUREG-1276, Technical Specifications, Braidwood Station, Unit Nos. I and 2 Specification 4.4.5.5.b of reference (1) requires that within 12 months following the completion of each inservice inspection of steam generator tubes the complete results of the inspection shall be submitted to the Commission in a Special Report pursuant to Specification 6.9.2. This report shall include the number and extent of tubes inspected, location and percent of wall-thickness penetration for each indication of an imperfection, and identification of tubes plugged or repaired. The Braidwood Unit I steam generator eddy current inspection was completed May 7,1994.

During this inspection,100% of the tubing received a full length bobbin coil eddy current inspection. Rotating Pancake Coil (RPC) was used to confirm and characterize all distorted indications found through bobbin coil examination. Due to the number of tubes being defective and, therefore, requiring to be repaired / plugged, a one volt interim plugging criteria (IPC) was approved by the NRC.

The enclosure summarizes the inspection results. Included are indication lists and i

maps, a guide to abbreviations used in the indication list, and the qualification requirements of the certified personnel performing the eddy current examinations.

Please direct any questions regarding this submittal to Doug Huston, Braidwood Licensing Supervisor (815) 458 2801, extension 2511.

Very truly yours,

)

J. Tulon tation Manager Braidwood Nuclear Station i

Attachments S.G. Dupont, Senior Resident Inspector - Braidwood cc:

R.R. Assa, Braidwood Project Manager - NRR J. B. Martin, Regional Administrator - RIII 9505100122 950426 4

PDR ADOCK 050004%

l i

Q PDR I

A Unicum n>mp.my i

l