ML20083A068

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1983
ML20083A068
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/30/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8312200151
Download: ML20083A068 (9)


Text

.

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1983 During the month of November, there were no unit shutdowns or significant power reductions.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.
2. Disassembled and cleaned A train river water strainer.
3. Repaired ID and IE turbine building battery chargers.
4. Rebuilt #8 river water pump.
5. Performed annual PM on 1-2A diesel generator.

8312200151 831130 PDR ADOCK 05000348 R PDR Ig Li

1 OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12/5/83 COMPLETED BY W. G. Hairston, III TELEPHONE (2nsi 899-5156 OPERATING STATUS

  • ~
1. Unit Name: Trennh M 1;'m-l oy - fin i t- T
2. Reporting Period: November. 1983 1) Cumulative data,since
3. Licensed Thermal Power (MWt):

2652 12/1/77, date of commercial

4. Nameplate Rating (Gross MWe): 860 operation.

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): RAA ^
7. Maximum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr..to.Date Cur'nulative 720 8,016 52,584
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720.0 6 911_7 14.379.9
13. Reactor Reserve Shutdown Hours 0.0 36.2 3.650.7
14. Hours Generator On.Line 720.0 6,091.2 33,359.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,909,228 15,638,389 84,128,438
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) Ano osn A 96i_oog 96_yi9_sgo
18. Net Electrical Energy Generated (MWH) 579.162 4.661.032 25.101.252
19. Unit Service Factor 100.0 76.0 63.4
20. Unit Availability Factor 100.0 76.0 63.4
21. Unit Capacity Factor (Using MDC Net) 100.1 72.4 59.4 97.0 70.1 57.6
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate nn 1.4 15.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

Refueling / maintenance outage, 2/10/84, approximately 8 weeks. '

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A

, 26. Units in Test Status 1 Prior to Commercial Operation): Forecast Achieved gyir;n cag7;cg;7y 8/6/77 8/9/77 INITIAL ELECTRICITY R/90/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77 ten

l DOCKET NO.

50-348 UNIT 1 DATE '?/5/R' CO5fPLETED BY W.G. Hairston, III TELEPHONE (?05) 899-5156 3IONT11 Novernher. 1983 1 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL.

(MWe Net) (MWe-Net) g 806 17 806 2 808 13 Ros an^ 19 800 3 , , , _

4 801 20 798 Rno 804 5 21 6

812 22 803

~

809 von 23 g 803 74 799 9

804 25- 808 807 10 26 807 27 796 808 23 Rno 12 29 807 13 14 803 30 808

- 15 799 31 805 16 ELTIRUGONS On this form:t. list the svenge daily unit puwer !cielin MWe-Net for e:dt d:y in the reporting month. Compute to

, the neare:t whole mepwatt.

(9(77)

._o - 6

UNIT SilU1 DOWNS AND POWER REDUC 110NS DOCKET NO. sn 4ta

  • UNIT NAhlE .L M rnriny_itnic 1 DA IE 1 ') / s /st t COhlPLETED tly W.G'.Rairston, III REPORT hlONTil November. 1983 TEl.EPilONE (205) 899-5156

. "i -

e 3us

. .E e c.

g g 5 'A Licensee g r, 5*

c. Cause & Correceive No. Date g; 3g  ;; ,3 g 5 Event c; Y E.1 Action to H

$5 5 <# G u  ;,,,,,n,geco,,,gc, i

j di g Repnet # ,

i 5 WERE No I NIT HUTD0 INS OR SIGNIFICA! T POW CR REDUC' IONS IN THE MONTH OF NOVEMBER.

THERE 5 4

i I

1 2 3 4 1:: Iorted Reason: hiethod: Exhibit G -Instructions S: Scheduled A I quipinent Failure (Explain) 1-h!anual for Preparation of Data Il-blaintenance of Test 2 Afantul Scrain. Entry Sheets for I.icensee C Itefueling 3 Autoniatic Scrain. Event Report (I.EIU File INUREG-

, D Hegulainay itestriction 4.Ot her (Explain) 01611 f.-Operator Training & license Examination F.Adininist sasive 5 G Opciational Luor (Explain) thinbis I Same Source (9/77) ll Othes (E aplain)

e v

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1983 During the month of November, there were no unit shutdowns or significant power reductions.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.
2. Disassembled and cleaned A train river water strainer.
  • 3. Repaired ID and IE turbine building battery chargers.
4. Rebuilt #8 river water pump.
5. Performed annual PM on 1-2A diesel generator.

e 4 -- " ' - - -- - -. _ -. _ ,,,

,~

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12/5/83 COMPLETED BY W. G. Hairston, III TELEPHONE (?ns) 899-5156 OPERATING STATUS w Tncanh M h r1ay nn4e T Wres

1. Unit Name:
2. Reporting Period: November. 1983 1) Cumulative data since
3. Licensed Thermal Power (MWt): 2652 12/1/77. date of commercial
4. Nameplate Rating (Gross MWe): 860 operation.
5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe): AAA 6
7. Maximum Dependable Capacity (Net MWe): 801.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. lf Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr to.Date ' Cumulative 720 8,016 52,584
11. Hours In Reporting Pen.ed
12. Number Of Hours Reactor Was Critical 720.0 A 911.7 14.179.7
13. Reactor Reserve Shutdown Hours 0.0 36.2 3.650.7
14. Hours Generator On.Line 720.0 6,091.2 33,359.4 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 1,909,228 15,638,389 84,128,438
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) Ano ?sn A,oni coR  ? A ; 719 sR9
18. Net Electncal Energy Generated (MWH) 579.162 4.661.032 25.101.252
19. Unit Service Factor 100.0 76.0 _

63.4

20. Unit Availability Factor 100.0 76.0 63.4
21. Unit Capacity Factor (Using MDC Net) 100.1 72.4 59.4 97.0 70.1 3/.6
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate nn !4 15.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Refueling / maintenance outage, 2/10/84, approximately 8 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/^
26. Units in Test Status IPrior to Commercial Operation): Forecast Achieved INITM CRITIC.4Liii 8/6/77 8/9/77 INITIAL ELECTRICITY R/?n/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77 pu- i

~

gg gg, 50-348 UNIT I t

DAIT, 19/s/91 COMPLETID BY W.G. Hairston, III TELEPHONE (205) 899-5156 310NTl! November. 1983 ,

DAY AYERAGE DA!LY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net) (SIWE-Net) g 806 37 806 808 33 Ros 2

anA 39 800 3 s 4 801 20 798 Rno 21, 804 5

6 812 22 803 7 23 _

g 803 24 799 9

804 25 _

808 807 10 26 _

3g 807 27 796 l

808 23 Rn?

12 809 ,y 807 13 14 803 30 808

- 15 799 31 805 16 M UCEONS On this form:r. list the aversge daily unit puwer !cvelin MWe-Net for each day in the reporung month. Compute to l

, the neste:t whole megswatt.

(9(77)

DOCKET NO. sn-34R UNIT S1101 DOWNS AND POWER REDUCTIONS UNIT NAhlE 1 M Farlov-lhr!r 1

  • D A ik. 191s /sn COMPLETED ily W.G'.Hairston, III REPORT klONTil November. 1983 TEl.EPflONE (205) 899-5156 i

e, "i: -

, .! E };; Licensee E t,  % Cause & Corrective No. Date g 3g }g&Eh

_g Event g o.1 Action in F 5 o

$E j glF, g Report # ,

in u Prevent Recurrence c5 OR SIGNIFICAFT ' POW i.R REDUC IONS IN THE MONTH OF NOVEMBER.

THERE WERE No l' NIT 5 HUTD0 JNS I 2 3 4 I:: I orted Reason: hielhod: Exhibit G - Instructions S: Stlieduled A 1:quipment Failure (Explain) I hlanual for Preparation of Data ll.klaintenance r,i Test 2-klanual Scram. Entey Sheets for I.icensee C Itefocling 3 Automatic Scram. Event Report (I.ERI File INtlRI:G-D Regulainey Restriction 4 Other (Explain) 0161) 1 -Operator 1 raining & license Fxamination F- Adsninist sative 5 G Opcsational Livor (Explain) Eshibis I - Same Source

(')/77) ll Olhei (E xplain )

Malling Address Alibima Pow r Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

Senior Vice President Flintridge Building AlabamaPower thesouthern electnc system December 12, 1983 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the November,1983 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached '

report.

If you have any questions, please advise.

Yours very truly, F

[Cfoo

. Clayto Jr. b L

FLCJ r/KWM:nac Enclosures xc: Mr. Ted Cintula (1 cop 7)

Director, IE (10 copies)

Director, RII (1 copy)

!ll