JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1983 During the month of November, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Disassembled and cleaned A train river water strainer.
3.
Repaired ID and IE turbine building battery chargers.
4.
Rebuilt #8 river water pump.
5.
Performed annual PM on 1-2A diesel generator.
8312200151 831130 PDR ADOCK 05000348 R
PDR Ig Li
1 OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12/5/83 COMPLETED BY W. G.
Hairston, III TELEPHONE (2nsi 899-5156 OPERATING STATUS
~
- 1. Unit Name:
Trennh M 1;'m-l oy - fin i t-T
- 2. Reporting Period:
November. 1983
- 1) Cumulative data,since
- 3. Licensed Thermal Power (MWt):
2652 12/1/77, date of commercial 860 operation.
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
RAA ^
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cur'nulative 720 8,016 52,584
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 720.0 6 911_7 14.379.9
- 13. Reactor Reserve Shutdown Hours 0.0 36.2 3.650.7
- 14. Hours Generator On.Line 720.0 6,091.2 33,359.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1,909,228 15,638,389 84,128,438
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
Ano osn A 96i_oog 96_yi9_sgo
- 18. Net Electrical Energy Generated (MWH) 579.162 4.661.032 25.101.252
- 19. Unit Service Factor 100.0 76.0 63.4
- 20. Unit Availability Factor 100.0 76.0 63.4 100.1 72.4 59.4
- 21. Unit Capacity Factor (Using MDC Net) 97.0 70.1 57.6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate nn 1.4 15.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
Refueling / maintenance outage, 2/10/84, approximately 8 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status 1 Prior to Commercial Operation):
Forecast Achieved 8/6/77 8/9/77 gyir;n cag7;cg;7y INITIAL ELECTRICITY R/90/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77 ten
50-348 DOCKET NO.
l UNIT 1
DATE
'?/5/R' CO5fPLETED BY W.G. Hairston, III TELEPHONE (?05) 899-5156 3IONT11 Novernher. 1983 1
DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL.
(MWe Net)
(MWe-Net) 806 g
17 806 2
808 13 Ros 800 3
an^
19 801 798 20 4
804 5
Rno 21 812 6
22 803
~
809 23 von 803 g
74 799 804 25-808 9
807 10 26 807 27 796 12 808 23 Rno 807 13 29 803 14 30 808 15 799 31 805 16 ELTIRUGONS On this form:t. list the svenge daily unit puwer !cielin MWe-Net for e:dt d:y in the reporting month. Compute to
, the neare:t whole mepwatt.
(9(77)
._o 6
UNIT SilU1 DOWNS AND POWER REDUC 110NS DOCKET NO.
sn 4ta UNIT NAhlE.L M rnriny_itnic 1 DA IE 1 ') / s /st t COhlPLETED tly W.G'.Rairston, III REPORT hlONTil November. 1983 TEl.EPilONE (205) 899-5156 "i
e c.
3us 5*
.E e g
g 5 'A Licensee g r, c.
Cause & Correceive E.1 Action to No.
Date g;
3g
,3 g 5 Event c; Y
<# G u
$5 5
j di g Repnet #
- ,,,,,n,geco,,,gc, i
H 5
i THERE WERE No I NIT 5 HUTD0 INS OR SIGNIFICA! T POW CR REDUC' IONS IN THE MONTH OF NOVEMBER.
4 i
I 1
2 3
4 1:: Iorted Reason:
hiethod:
Exhibit G -Instructions S: Scheduled A I quipinent Failure (Explain) 1-h!anual for Preparation of Data Il-blaintenance of Test 2 Afantul Scrain.
Entry Sheets for I.icensee C Itefueling 3 Autoniatic Scrain.
Event Report (I.EIU File INUREG-D Hegulainay itestriction 4.Ot her (Explain) 01611 f.-Operator Training & license Examination F.Adininist sasive 5
G Opciational Luor (Explain) thinbis I Same Source (9/77) ll Othes (E aplain)
e v
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1983 During the month of November, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Disassembled and cleaned A train river water strainer.
3.
Repaired ID and IE turbine building battery chargers.
4.
Rebuilt #8 river water pump.
5.
Performed annual PM on 1-2A diesel generator.
e 4
,~
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12/5/83 COMPLETED BY W. G.
Hairston, III TELEPHONE (?ns) 899-5156 OPERATING STATUS w
Wres
- 1. Unit Name:
Tncanh M h r1ay nn4e T
- 2. Reporting Period:
November. 1983
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 12/1/77. date of commercial 860 operation.
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
AAA 6
- 6. Maximum Dependable Capacity (Gross MWe):
801.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions. If Any:
This Month Yr to.Date
' Cumulative 720 8,016 52,584
- 11. Hours In Reporting Pen. d e
- 12. Number Of Hours Reactor Was Critical 720.0 A 911.7 14.179.7
- 13. Reactor Reserve Shutdown Hours 0.0 36.2 3.650.7
- 14. Hours Generator On.Line 720.0 6,091.2 33,359.4 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 1,909,228 15,638,389 84,128,438
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
Ano ?sn A,oni coR
? A ; 719 sR9
- 18. Net Electncal Energy Generated (MWH) 579.162 4.661.032 25.101.252
- 19. Unit Service Factor 100.0 76.0 63.4
- 20. Unit Availability Factor 100.0 76.0 63.4
- 21. Unit Capacity Factor (Using MDC Net) 100.1 72.4 59.4 97.0 70.1 3/.6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate nn
!4 15.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Refueling / maintenance outage, 2/10/84, approximately 8 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/^
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved 8/6/77 8/9/77 INITM CRITIC.4Liii INITIAL ELECTRICITY R/?n/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77 pu-i
50-348
~
gg gg, UNIT I
t
- DAIT, 19/s/91 COMPLETID BY W.G. Hairston, III TELEPHONE (205) 899-5156 310NTl!
November. 1983 DAY AYERAGE DA!LY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net)
(SIWE-Net) 806 g
37 806 2
808 33 Ros 800 3
anA 39 s
801 798 20 4
804 5
Rno 21, 812 6
22 803 7
23 803 799 g
24 804 25 808 9
807 10 26 3g 27 796 807 l
12 808 23 Rn?
809 807 13
,y 803 30 808 14 15 799 31 805 16 M UCEONS l
On this form:r. list the aversge daily unit puwer !cvelin MWe-Net for each day in the reporung month. Compute to
, the neste:t whole megswatt.
(9(77)
UNIT S1101 DOWNS AND POWER REDUCTIONS DOCKET NO.
sn-34R UNIT NAhlE 1 M Farlov-lhr!r 1 D A ik.
191s /sn COMPLETED ily W.G'.Hairston, III REPORT klONTil November. 1983 TEl.EPflONE (205) 899-5156 i
"i:
e,
}g&Eh Licensee E t, Cause & Corrective
.! E
}
No.
Date g
3g
_g Event g
o.1 Action in in u o
$E 5
j glF, g Report #
F Prevent Recurrence c5 THERE WERE No l' NIT 5 HUTD0 JNS OR SIGNIFICAFT ' POW i.R REDUC IONS IN THE MONTH OF NOVEMBER.
I 2
3 4
I:: I orted Reason:
hielhod:
Exhibit G - Instructions S: Stlieduled A 1:quipment Failure (Explain)
I hlanual for Preparation of Data ll.klaintenance r,i Test 2-klanual Scram.
Entey Sheets for I.icensee C Itefocling 3 Automatic Scram.
Event Report (I.ERI File INtlRI:G-D Regulainey Restriction 4 Other (Explain) 0161) 1 -Operator 1 raining & license Fxamination F-Adsninist sative 5
G Opcsational Livor (Explain)
Eshibis I - Same Source
(')/77) ll Olhei (E xplain )
Malling Address Alibima Pow r Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
Senior Vice President Flintridge Building AlabamaPower thesouthern electnc system December 12, 1983 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the November,1983 Monthly Operating Report for Joseph M.
Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly,
[Cfoo L
F
. Clayto Jr. b FLCJ r/KWM:nac Enclosures xc: Mr. Ted Cintula (1 cop 7)
Director, IE (10 copies)
Director, RII (1 copy)