ML20082V307
| ML20082V307 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/03/1995 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Public Service Electric & Gas Co, Philadelphia Electric Co, Delmarva Power & Light Co, Atlantic City Electric Co |
| Shared Package | |
| ML20082V309 | List: |
| References | |
| DPR-70-A-166, DPR-75-A-148 NUDOCS 9505090172 | |
| Download: ML20082V307 (8) | |
Text
ff, ;
pMC j
. 2*r UNITED STATES j
NUCLEAR REGULATORY COMMISSION r
WASHINGTON, D.C. 20566-4001
\\.....,E PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.166 License No. DPR-70 1.
The Nuclear Regulatory Comission (the Comission or the NRC) has found that:
'l A.
The application for amendment filed by the Public Service Electric &'
i Gas Company, Philadelphia Electric Company, Delmarva Power and Light j
Company and Atlantic City Electric Company (the licensees) dated August 19, 1994, as supplemented March 15, 1995, complies with the i
standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the i
provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:
9505090172 950503 j
DR ADOCK 0500 2
i
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and 8, as revised through Amendment No. 166, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license ' amendment is effective as of its date of issuance, to be implemented within 60 days.
FOR THE NUCLEAR REGUL TORY COMISSION oh F. Stolz, Director ect Directorate I-Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 3, 1995 I
6 i
1
1#:.
'O ATTACHMENT TO LICENSE AMENDMENT NO. 166 FACILITY OPERATING LICENSE NO. DPR-70 F"^~ NO. 50-272
(
Revise Appendix A as follows:
Remove Pace Insert Paae
~
3/4 1-19 3/4 1-19 i
1
c.
j I
e i
a:;.TIVITY CONTROL SiSTEMS POSITION INDICATION SYSTEMS - OPERATING i
l LIMITING CONDITION FOR OPERATION 3.1.3.2.1 The shutdown and control rod position indication systems shall be OPERABLE and capable of determining the actual and demanded rod positions as follows:
a.
Analog red position indicators, within one hour after rod motion (allowance for thermal soak);
i 1
All Shutdown Banks: 1 12 steps of the group demand counters for j
withdrawal ranges of 0-30 steps and 200-228 steps.
Control Bank A: i 12 steps of the group demand counters for withdrawal ranges of 0-30 steps and 200-228 steps.
4 Control Bank B: 1 12 steps of the group demand counters for withdrawal ranges of 0-30 steps and 160-228 steps.
Control Banks C and D: 1 12 steps of the group demand counters for withdrawal range of 0-228 steps.
b.
Group demand counters; i 2 steps of the pulsed output of the Slave Cycler Circuit over the withdrawal range of 0-228 steps.
APPLICABILITY: MODES 1 and 2.
ACTION:
)
a.
With a maximum of one analog rod position indicator per bank inoperable either:
1.
Determine the position of the non-indicating rod (s) indirectly by the movable incore detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and within one hour after any motion of the non-indicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or 2.
Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within a hours, b.
With two or more analog rod position indicators per bank inoperable, within one hour restore the inoperable rod position indicator (s) to OPERABLE status or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. A maximum of one rod position indicator per bank may remain inoperable 1
following the hour, with Action (a) above being applicable from the original entry time into the LCO.
c.
With a maximum of one group demand position indicator per bank inoperable either:
SALEM - UNIT 1 3/4 1-19 Amendment No.lbb
ve 'f og
,y 4
UNITED STATES
(
j NUCLEAR REGULATORY COMMISSION i t WASHINGTON, D.C. 20565 4001
\\...../
PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 e
SALEM NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.148 License No. DPR-75 1.
The Nuclear Regulatory Comission (the Comission or the NRC) has fcund that:
A. 'The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated August 19, 1994, as supplemented March 15, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and j
safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; j
D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of F,acility Operating License No. DPR-75 is hereby amended to read as follows:
=.
o (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 148, are hereby incorporated in the l
license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Johp F. Stolz, Direc 4 ject Directorate I-2 e
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: May 3, 1995 r
1 l
I
I i
ATTACHMENT TO LICENSE AMENDMENT NO.148 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:
Remove Paae Insert Paae 3/4 1-16 3/4 1-16 e
I i
i e
t r
9
I i
4 PEACTIVITY CONTROL SYSTEMS POSITION INDICATION SYSTEMS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.3.2.1 The shutdown and control rod position indication systems shall be OPERABLE and capable of determining the actual and demanded rod positions as follows:
a.
Analog r d position indicators, within one hour after rod motion (allowance for thermal soak);
12 steps of the group demand counters f'or All Shutdown Banks: 2 withdrawal ranges of 0-30 steps and 200-228 steps.
Control Bank A: 2 12 steps of the group demand counters for withdrawal ranges of 0-30 steps and 200-228 steps.
Control Bank B: 2 12 steps of the group demand counters for withdrawal ranges of 0-30 steps and 160-220 steps.
Control Banks C and D: 1 12 steps of the group demand counters for withdrawal range of 0-228 steps.
b.
Group demand counters; t 2 steps of the pulsed output of the Slave Cycler Circuit over the withdrawal range of 0-228 steps.
APPLICABILITY: MODES 1 and 2.
ACTION:
With a maximum of one analog rod position indicator per bank a.
inoperable either:
1.
Determine the position of the non-indicating rod (s) indirectly by the movable incere detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and within one hour after any motion of the non-indicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or 2.
Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, b.
With two or more analog rod position indicators per bank inoperable, within one hour restore the inoperable rod position indicator (s) to OPERABLE status or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. A maximum of one rod position indicator per bank may remain inoperable following the hour, with Action (a) above being applicable from the original entry time into the LCO.
c.
With a maximum of one group demand position indicator per bank inoperable either:
SALEM - UNIT 2 3/4 1-16 Amendment No.148